Well ID: 34-121-24449 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.88,"lon":-81.4,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Seneca Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-000784 | |
Farm/Lease Name: SCHAFER UNIT | |
License Status: Producing | |
License Date: 2013-08-19 | |
Spud Date: 2014-01-08 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-01-14 | |
Well Total Depth: 15563.00 ft | |
Configuration: Horizontal | |
Latitude: 39.880000 | |
Longitude: -81.400000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-08-19 | Proposed Formations:POINT PLEASANT, Issued Date:8/19/2013, Expired Date:8/19/2015 12:00:00 PM, Drilling unit acres:503.091, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2014-01-14 | |
Correction to Well | 2014-02-07 | CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 473.302 ACRES. |
Correction to Well | 2014-03-27 | UNIT SIZE CHANGED TO 464.032 ACRES. |
Completion Report Received | 2014-12-08 | |
Construction Permit Expires | 2015-08-19 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-12-08 | 7959 | 15543 | 0 |
7959 | 15543 | 0 | |
7959 | 15543 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/14/2014 | 03/28/2014 | 7808 | 10,995,200.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Plexcide 15G | Chemplex | Biocide | Water | 7732-18-5 | 90 | 0.02285 | 0 |
Ethanol | 64-17-5 | 3 | 0.00076 | 0 | ||||
Alkyl Dimethyl Benzyl Ammonium Chloride | 68424-85-1 | 3 | 0.00076 | 0 | ||||
Glutaraldehyde | 111-30-8 | 14 | 0.00355 | 0 | ||||
Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 3 | 0.00076 | 0 | ||||
100 Mesh | US Silica | Propppant | Sand | 14808-60-7 | 100 | 1.2677 | 0 | |
Plexaid 673 | Chemplex | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 25 | 0.00393 | 0 | |
Water | 7732-18-5 | 85 | 0.01335 | 0 | ||||
Sodium Salt of Phosphonodimethylated Diamine | Proprietary | 5 | 0.00079 | 0 | ||||
20/40 White | US Silica | Propppant | Sand | 14808-60-7 | 100 | 2.9237 | 0 | |
Sodium Persulfate | Chemplex | Breaker | Sodium Persulfate | 7775-27-1 | 100 | 0.00123 | 0 | |
Plexbreak 145 | Chemplex | Non-emulsifier | Diethanolamine | 111-42-2 | 5 | 0.00004000 | 0 | |
Methyl Alcohol | 67-56-1 | 15 | 0.00012 | 0 | ||||
Ethylene Glycol Monobutyl Ether | 111-76-2 | 15 | 0.00012 | 0 | ||||
Water | 732-18-5 | 66 | 0.00052 | 0 | ||||
Cocamide Diethanolamine Salt | 68603-42-9 | 10 | 0.00008000 | 0 | ||||
40/70 White | US Silica | Propppant | Sand | 14808-60-7 | 100 | 4.9144 | 0 | |
Ferriplex 66 | Chemplex | Iron Control | Water | 7732-18-5 | 35 | 0.00016 | 0 | |
Citric Acid | 77-92-9 | 30 | 0.00013 | 0 | ||||
Acetic Acid | 64-19-7 | 50 | 0.00022 | 0 | ||||
Plexhib 256 | Chemplex | Corrosion | Propargyl Alcohol | 107-19-7 | 8 | 0.00006000 | 0 | |
Alcohol Ethoxylate Surfactants | Proprietary | 30 | 0.00021 | 0 | ||||
n-olefins | Proprietary | 10 | 0.00007000 | 0 | ||||
Methyl Alcohol | 67-56-1 | 70 | 0.00049 | 0 | ||||
thiourea-formaldehyde copolymer | 68527-49-1 | 30 | 0.00021 | 0 | ||||
Beta M-4.0 | PfP | Guar Gel | Guar Gum | 9000-30-0 | 50 | 0.04252 | 0 | |
Petroleum Distillate | 64742-47-8 | 55 | 0.04677 | 0 | ||||
Surfactant | 154518-36-2 | 1 | 0.00085 | 0 | ||||
Clay | 1302-78-9 | 5 | 0.00425 | 0 | ||||
Hydrochloric Acid 10-15% | Reagent | Acid | Hydrchloric Acid | 7647-01-0 | 15 | 0.03424 | 0 | |
Freshwater | Antero Resources | Water | Water | 7732-18-5 | 100 | 90.709 | 0 | |
Plexslick 953 | Chemplex | Friction Reducer | Hydrotreated Petroleum Distillate | 64742-47-8 | 30 | 0.01844 | 0 | |
Alcohol Ethoxylate Surfactants | Proprietary | 8 | 0.00492 | 0 | ||||
Water | 7732-18-5 | 35 | 0.02152 | 0 | ||||
Polyacrylamide-co-acrylic acid | 9003-06-9 | 32 | 0.01967 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-03-14 | FOAM | 15 | 7374 Bbl | 222092 | Go Frac LLC | STAGE 1/43
STAGES 2-42 SEE IMAGES |
2014-03-28 | H2O | 15 | 5849 Bbl | 235540 | Go Frac LLC | STAGE 43/43 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ANTERO RESOURCES CORPORATION | 1056154 | 67725 | 241 |
2015 | ANTERO RESOURCES CORPORATION | 877006 | 24846 | 365 |
2016 | ANTERO RESOURCES CORPORATION | 470035 | 7601 | 359 |
2017 | ANTERO RESOURCES CORPORATION | 353277 | 4310 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 235995 | 2864 | 360 |
2019 | ANTERO RESOURCES CORPORATION | 51411 | 477 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ANTERO RESOURCES CORPORATION | Brine | 10414 | 241 |
2015 | ANTERO RESOURCES CORPORATION | Brine | 19359 | 365 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 4201 | 359 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 2161 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 693 | 360 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 95 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1081217162 | 2016-1-13 0:00: | PW | No Violations | 0.30 |
-1521190829 | 2013-10-25 0:00 | CS | No Violations | 4.00 |
-1540578512 | 2015-8-19 0:00: | PW | No Violations | 3.00 |
-1899749186 | 2018-11-27 0:00 | PW | No Violations | 1.00 |
-1902641715 | 2015-7-4 0:00:0 | PW | No Violations | 0.10 |
-1930281127 | 2015-6-9 0:00:0 | PW | No Violations | 2.00 |
-214617731 | 2013-12-24 0:00 | DD | No Violations | 2.00 |
-342054058 | 2017-3-15 0:00: | PW | No Violations | 0.10 |
-788673782 | 2015-7-5 0:00:0 | PW | No Violations | 4.50 |
-852922981 | 2017-12-1 0:00: | PW | No Violations | 0.50 |
-919016324 | 2014-5-14 0:00: | PL | No Violations | 1.50 |
0103618267 | 2015-06-01 | Production Wells | No Violations | My inspection today finds small puddles on the out slopes of the well pad are still testing above 250 PPM for chlorides. All sumps are closed and the valve basins are locked. The company is hauling all water to an approved site. |
0214617731 | 2013-12-24 | Drill / Deepen / Reopen | No Violations | Patterson rig 343 is currently drilling 12.25 hole at 3308. Containment is in place as required. |
0342054058 | 2017-03-15 | Production Wells | No Violations | The pad name is Cynthia and it consists of 5 wells. The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present. The production equipment consisted of five gas production units, eight 400 barrel tanks, two compressors, and three combustors. Identification was present and production records were current. |
0524699446 | 2015-07-29 | Production Wells | No Violations | My inspection today finds the well site has been cleaned and all roll off boxes have been removed. I could find no water to sample on the out slope. The catch basin is empty. Sam Meyers with Antero EH&S stated that the rain water sumps on location have been cleaned and a couple of cracks have been repaired. |
0709397267 | 2017-10-18 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. The well pad name is Cynthia and it consists of 5 wells. The well was equipped with a production tree style wellhead with a plunger lift system. Production valves were in the open position. Annular pressure monitoring was present. The gauge on the production casing read 280 pounds per square inch and the gauge on the production tubing read 170 pounds per square inch. The production equipment consisted of eight 400 barrel tanks within steel line containment and five gas production units. A vapor recovery system consisted of two compressors, one vent scrubber, and three combustors. The pipeline tie in was located on the North side of the pad. A dust suppressant had been recently applied to the lease road. The identification was located at the wellhead and the production records were current. |
0788673782 | 2015-07-05 | Production Wells | No Violations | My inspection today is in response to the condensate release that took place the previous day. My inspection finds there is no visible condensate on the well pad. A light layer of condensate can be seen in the drainage sumps. I spoke to Mr. Goddard with Antero and he stated that they will steam clean the sumps as soon as possible, and he stated that Micro-Blaze bio-remediation product was applied to the affected areas after the contaminated dirt was removed. I requested that Antero provide the manifests for all soil removed from the site, as well as, the disposal tickets for water hauled off of location. |
0849348853 | 2016-07-28 | Production Wells | No Violations | My inspection today finds the well is equipped in a manner consistent with being capable of production. The tank battery consists of eight 400 barrel tanks set in a plastic lined liquid tight steel containment. The tank battery is shared by four other wells on the pad. Two vapor recovery compressors and three incinerators are located near the entry of the well pad. Heavy rain is falling at the time of inspection. |
0852922981 | 2017-12-01 | Production Wells | No Violations | |
0919016324 | 2014-05-14 | Preliminary Restoration | No Violations | My inspection today finds the well appears to be in production. The tank battery consists of eight 400 bbl tanks set in a containment. The site meets preliminary restoration requirements. |
103618267 | 2015-6-1 0:00:0 | PW | No Violations | 2.00 |
1081217162 | 2016-01-13 | Production Wells | No Violations | My inspection today finds the well is equipped in a manner consistent with being capable of production. The tank battery is comprised of eight 400 barrel tanks set inside of a plastic lined, liquid tight steel containment system. There are three vapor recovery units and three incinerators set at the location. Four other wells are located on the pad and share the production equipment. The ground is covered by three inches of snow at the time of inspection. |
1432151640 | 2015-05-20 | Production Wells | No Violations | At 12:22 pm I received a telephone call from Sam Myers, Antero EH&S. Mr. Myers indicated that an unknown quantity of flow back brine leaked out of roll-off tanks on location and then escaped through a hole in the secondary containment beneath them during a recent large rain event. Upon my arrival on site at 12:33 pm I witnessed two vac trucks removing water from the site and Hull Environmental performing testing of the area. My inspection found that all drainage outlets were closed. I sampled standing water at three location on the well pad and three locations on the out slope of the well pad with a high range Quantab and found levels ranging from 6627 parts per million (PPM) to less than 250 (PPM). Dispose of all accumulated water on the site until chlorides are mitigated. A lined catch basin is to be installed at the base of the affected out slope. Antero shall submit third party testing results as they become available. |
1432789171 | 2020-3-18 0:00: | PL | No Violations | 0.30 |
1443612299 | 2015-09-29 | Production Wells | No Violations | My inspection today finds the well is equipped in a manner that is consistent with being capable of production. The tank battery area of the pad has been enclosed with an earthen berm and a drainage system has been installed. |
1456498388 | 2016-02-25 | Production Wells | No Violations | My inspection today finds the well is equipped in a manner that is consistent with being capable of production. The tank battery is comprised of eight 400 barrel tanks set inside of a plastic lined steel containment system. There are no personnel onsite at the time of inspection. |
1479300356 | 2015-08-13 | Production Wells | No Violations | I am accompanied by Inspector Brian Sefcik today. Our inspection finds the catch basin at base of the out slope has a couple of inches of water. A test with low range Quantabs indicated the total chlorides were at 613 ppm. No water was witnessed flowing from the out slope. |
1505735718 | 2015-05-26 | Production Wells | No Violations | My inspection today finds the well operator has removed a small area of soil and constructed a catch basin to stop the flow of contaminated water. Hull Environmental is onsite to retest the affected area. |
1521190829 | 2013-10-25 | Casing String Witnessed | No Violations | I am on site to witness surface casing cementing operations. Falcon rig 20 ran 377 of 18.635 casing. Allied circulated 758 sks of class a cement in place. I witnessed 70 bbl of cement returns to surface. |
1540578512 | 2015-08-19 | Production Wells | No Violations | My inspection today finds there is no water on the out slope of the location. The catch basin at the base of the out slope has 2 of water in it and a Quantab test indicates the total chlorides at 613 ppm. The water flow on the out slope appears to have stopped after company repaired a crack in the drain sumps on location. |
1591397208 | 2019-12-5 0:00: | PW | No Violations | 0.80 |
1666913524 | 2015-06-16 | Production Wells | No Violations | My inspection today finds that the chlorides on the location at the North drainage sump are at 3.4 on a high range Quantab indicating total chlorides of 533 parts per million (PPM). A test sample was taken from the catch basin at the base of the out slope, that sample tested at 4.2 on a high range quantab indicating total dissolved chlorides of 755 PPM. A small puddle of standing water on the out slope (ODNR-1) tested at 6.6 with a high range Quantab 1982 PPM. Antero has dispatched water trucks to remove all accumulated water on the location and from the catch basin. |
1853433531 | 2015-09-10 | Production Wells | No Violations | My inspection today finds the sumps are closed on location. I sampled the water at two points with low range Quantabs and found the total chlorides at a level of 229 ppm. The water in the catch basin at base of the out slope also tested at 5.0 (229 ppm). Todays results resolve the violation against the well. |
1899749186 | 2018-11-27 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with 5.5-inch diameter production casing and 2.875-inch diameter tubing equipped with a plunger lift system. At the time of my inspection annular pressure monitoring was in place, and the 13.375-inch diameter casing had 450 pounds per square inch, the 9.625-inch diameter casing had 500 pounds per square inch. Production equipment included a Gas Processing Unit, as well as 8- 400-barrel steel production fluid tanks, and 2 combustors that were shared with the other producing wells on the pad. There was secondary containment around the production fluid tanks, and the Gas Processing Units. There was a midstream valve site on the northwest side of the pad. The well pad was contained within an earthen dike, there were multiple Emergency Shutoff Devices on location. Identification tags were present, and production was up to date. |
1902641715 | 2015-07-04 | Production Wells | No Violations | At 1:46 PM I received a telephone call from Aaron Goddard, Antero EH&S Manager, indicating that a 10 barrel condensate release took place on the Cynthia Pad. Mr. Goddard indicated that the product was suspended on rain water that accumulated on the pad. All sumps were closed at the time of the release due to a previous incident. |
1930281127 | 2015-06-09 | Production Wells | No Violations | My inspection today finds the chloride levels at the northern location drain, a small puddle on the out slope of the location and the catch basin at the base of the out slope were all above the Divisions acceptable threshold. I will continue to monitor the site. |
1941247898 | 2015-06-04 | Production Wells | No Violations | This inspection is a follow up to the Compliance Notice issued on 5/20/2015. My inspection today finds that fluid has collected in the catch basin built at the base of the northern out slope. A sample was withdrawn from the basin by a 250 ml poly bottle. The sample was then tested with two high range Quantabs, one from batch 3275 and one from batch 4134. Both yielded a reading between 7.6 and 7.8 indicating total chlorides in excess of 3000 PPM. A puddle of standing water half way down the out slope (39.88194-81.40429) was sampled by withdrawing a fifty ml sample with a syringe. The sample was placed in a 250 ml ply bottle and tested for chlorides. The test with high range Quantabs, again from batch 3275 and 4134, indicated chlorides were present in excess of 6627 PPM. I called and spoke to Sam Myers at 9:08 am. Mr. Myers agreed that the company would continue to monitor the site and haul water from the sumps on location and the catch basin to an approved injection or recycling facility. I agreed with Mr. Myers that the company has performed in a workman fashion and that more time than was originally allotted is necessary to allow for proper remediation. I agreed extended the compliance date to 9/4/2015. |
524699446 | 2015-7-29 0:00: | PW | No Violations | 1.00 |
709397267 | 2017-10-18 0:00 | PW | No Violations | 1.00 |
849348853 | 2016-7-28 0:00: | PW | No Violations | 0.50 |