If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24485 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.91,"lon":-81.31,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Beaver Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-000626 | |
Farm/Lease Name: GRISSOM UNIT | |
License Status: Producing | |
License Date: 2014-05-23 | |
Spud Date: 2014-05-17 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-09-04 | |
Well Total Depth: 16152.00 ft | |
Configuration: Horizontal | |
Latitude: 39.910000 | |
Longitude: -81.310000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-04-03 | Proposed Formations:POINT PLEASANT, Issued Date:4/3/2014, Expired Date:4/2/2016 12:00:00 PM, Drilling unit acres:549.201, Proposed Well Type:OG, Proposed Well Class:EOUT |
APP | 2014-05-23 | Proposed Formations:POINT PLEASANT, Issued Date:5/23/2014, Expired Date:5/22/2016 12:00:00 PM, Drilling unit acres:487.822, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2014-09-04 | |
Correction to Well | 2015-01-30 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2015-04-20 | |
Construction Permit Expires | 2016-05-22 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-04-20 | 8590 | 16069 | 0 |
8590 | 16069 | 0 | |
8590 | 16069 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/24/2014 | 11/05/2014 | 7891 | 10,793,500.0 | 491547 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | K-BAC 1020 | U.S. Well Services, LLC | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00473 | 4742.39 |
Deionized Water | 7732-18-5 | 28 | 0.0027 | 2708.83 | ||||
WFRA-405 | U.S. Well Services, LLC | Friction Reducer | Anionic Polyacrylamide | Proprietary | 40 | 0.02668 | 26724.7 | |
Petroleum Distillates | 64742-47-8 | 40 | 0.02148 | 21513.4 | ||||
Ethoxylated alcohol blend | Proprietary | 5 | 0.00334 | 3340.59 | ||||
Crystalline Salt | 12125-02-9 | 5 | 0.00334 | 3340.59 | ||||
Water | 7732-18-5 | 40 | 0.02668 | 26724.7 | ||||
LGC-15 | U.S. Well Services, LLC | Gelling Agents | Surfactant | 68439-51-0 | 3 | 0.00209 | 2088.84 | |
Guar Gum | 9000-30-0 | 50 | 0.03476 | 34814.1 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.03292 | 32971 | ||||
Suspending agent (solid) | 14808-60-7 | 3 | 0.00532 | 5324.51 | ||||
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 87.5 | 0.10554 | 105708 | |
Hydrogen Chloride | 7647-01-1 | 18 | 0.02521 | 25250.2 | ||||
Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 89.873 | 90,018,100.0 | |
SI-1100 | U.S. Well Services | Scale Inhibitor | Copolymer of Maleic and Acrylic acid | 26677-99-6 | 10 | 0.00153 | 1532 | |
Ethylene Glycol | 107-21-1 | 40 | 0.00586 | 5869.39 | ||||
2-Phosphonobutane 1,2,4 tricarboxylic salt | 37971-36-1 | 10 | 0.00167 | 1675.11 | ||||
Acrylic polymer | 52255-49-9 | 5 | 0.00065 | 649.269 | ||||
bis (hexamethylene) tramine penta
(methylene phosphonic acid) - phosphate acid |
40623-75-4 | 10 | 0.00149 | 1493.32 | ||||
Potassium salt of diethylene triamine
penta (methylene phosphonic acid) |
15827-60-8 | 10 | 0.00175 | 1753.03 | ||||
hexamethylenediamine tetra (methylene phosphonic acid) | 38820-59-6 | 10 | 0.00162 | 1623.17 | ||||
Di Water | 7732-18-5 | 80 | 0.01037 | 10388.3 | ||||
AI-301 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Diethylene Glycol | 111-46-6 | 30 | 0.00016 | 162.385 | |
Coco amine | 61791-14-8 | 5 | 0.00002000 | 22.2511 | ||||
Hydrogen Chloride | 7647-01-0 | 10 | 0.00006000 | 56.1115 | ||||
Methenamine | 100-97-0 | 20 | 0.00013 | 128.67 | ||||
Polyethylene polyamine | 68603-67-8 | 10 | 0.00005000 | 48.7106 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 9.80547 | 9,821,310.0 | |
AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00143 | 1432 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-10-29 | H2O | 0 | 5899 Bbl | 234930 | US Well Services Inc | ALL STAGES SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | 1630731 | 53916 | 365 |
2016 | ANTERO RESOURCES CORPORATION | 989445 | 6557 | 361 |
2017 | ANTERO RESOURCES CORPORATION | 487328 | 2256 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 316081 | 1386 | 343 |
2019 | ANTERO RESOURCES CORPORATION | 52244 | 153 | 80 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | Brine | 15810 | 365 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 9686 | 361 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 4489 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 3674 | 343 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 649 | 80 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1293358403 | 2018-6-12 0:00: | PW | No Violations | 0.20 |
-1385353539 | 2015-2-11 0:00: | PL | No Violations | 0.50 |
-1534063529 | 2018-3-5 0:00:0 | PW | No Violations | 0.20 |
-201496788 | 2020-4-28 0:00: | PW | No Violations | 0.20 |
-512307613 | 2017-1-20 0:00: | PW | No Violations | 0.10 |
-569764765 | 2019-10-10 0:00 | PW | No Violations | 0.50 |
-733309607 | 2018-7-16 0:00: | PW | No Violations | 0.20 |
0332594418 | 2014-10-29 | Drill / Deepen / Reopen | No Violations | My inspection today finds U.S. Well Service is stimulating stage 17 of 43. The top perforation is at 13,128 and the bottom perforation is at 13,276. 5899 barrels of water were pumped at an average pressure of 8126 psi. The instant shut in was witnessed at 6095 psi. |
0512307613 | 2017-01-20 | Production Wells | No Violations | The purpose of my inspection is a status check on a producing well. The pad name is Roe and there are a total of 7 wells on this pad. During my inspection the well was equipped with a production tree style wellhead. The production equipment for this well consists of eight 400 barrel tanks within containment, and seven gas processing units. The vapor recovery system consists of two compressors and three Cimarron combustors. The production records are current, the identification is located at the wellhead, and there are no violations present. |
0733309607 | 2018-07-16 | Production Wells | No Violations | I received a call from a nearby landowner Mrs. Grissom. Mrs. Grissom stated that she was concerned about a loud noise that was coming from the Antero Roe Pad. I spoke with Antero Production Superintendent Doug Stubbins and he stated that they had a threaded nipple on the plunger lift system fail and let off a small burst of natural gas. During my inspection today, Antero was on location re-assembling the plunger lift system replacing the failed nipple. |
0834841942 | 2018-03-08 | Production Wells | No Violations | The purpose of my inspection was a status check on a cut slope slip failure. The pad name is Roe and there are a total of 7 wells. The slip occurred in the cut slope of the pad in the Northwest corner where the eight 400 barrel tanks and two vapor recovery towers were located. That equipment had been removed in order for Antero to take remedial action on the slope failure. The remaining production equipment and wellheads were outside the area of concern. ODNR Division of Oil and Gas Engineering Section is currently working with Antero Resources with planning the material modification to repair the slope. |
1156161837 | 2018-04-20 | Production Wells | No Violations | During my inspection contractors for Antero Resources were on location running lines to the combustors. The production equipment had been relocated due to a slip near the old orientation of the production equipment on the north side of the pad. |
1293358403 | 2018-06-12 | Production Wells | No Violations | Prior inspection found contractors for Antero relocating and reassembling production equipment due to a slip in the cut slope of the North side if the pad. During my inspection today, the tank battery had been moved and reset within steel containment and the vapor recovery system had been connected. The well was equipped with a production tree style wellhead with a plunger lift system. Production valves were in the open position. A gauge was present on the production tubing reading 170 pounds per square inch, 328 pounds per square inch on the production casing, 0 pounds per square inch on the 9.625 inch diameter intermediate casing, and 120 pounds per square inch on the 13.375 inch diameter surface casing. The production equipment consisted of four 400 barrel tanks, seven gas production units, and two combustors. The identification was located at the wellhead. |
1350602828 | 2015-06-16 | Production Wells | No Violations | The well is equipped in a manner consistent with being capable of production. All drainage sumps on the location are closed. No violations were noted during the inspection. |
1385353539 | 2015-02-11 | Preliminary Restoration | No Violations | My inspection today finds the well site meets the preliminary restoration requirements. The tank battery is comprised of eight 500 barrel tanks set inside a liquid tight plastic liner. |
1400293643 | 2014-05-16 | Casing String Witnessed | No Violations | My inspection today finds Express drilled the well to 101 and ran 100 of 26 casing. Express Energy Services also cemented the casing in place by circulating 330 sks of class A cement. The mix water was sourced from a Caldwell municipal source. Chlorides tested below 250 ppm. I witnessed 19 bbl returns to surface. |
1400802597 | 2014-05-22 | Casing String Witnessed | No Violations
-55 casing. Allied Oil & Gas Services broke circulation with 147bbls of fresh water, pumped 25bbls of gel and 10bbls of fresh water. Allied Oil and Gas Services cemented casing with 767 sacks of Class A cement with 2% CaCl and 1/8#/sk. floseal. Displaced cement with 102bbls of fresh water. Had good returns of 46bbls, plug was landed @ 150psi and pressured up to 650psi for 5 minutes and the floats held. Cement stayed to surface. | |
1534063529 | 2018-03-05 | Production Wells | No Violations | |
1617672950 | 2018-03-21 | Production Wells | No Violations | The purpose of my inspection was a status check. The pad is named Roe and there are a total of 7 wells. During my inspection construction equipment was on location to make repairs to the slips located on the cut slope and fill slopes of the pad. Antero is actively working with ODNR Division of Oil and Gas Engineering section to make necessary slip repairs. The slips do not oppose any threat to the wells and the wells are under continuous pressure monitoring. |
1780666315 | 2017-08-15 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. The pad is named Roe and there are a total of 7 wells. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 287 pounds per square inch on the casing, 170 pounds per square inch on the tubing, and 110 pounds per square inch on the annulus. The production equipment for the well consists of eight 400 barrel tanks, seven gas processing units, two compressors, and two Cimarron combustors. The pipeline tie in is located on the west side of the pad. The production records are current, and the identification is located at the wellhead. |
1829437440 | 2014-05-27 | Casing String Witnessed | No Violations | My inspection finds Falcon rig 27 ran 1862 of 13.375 casing. Allied Oil and Gas Services is on site to circulate class A cement into place. |
1924909905 | 2017-05-09 | Production Wells | No Violations | The purpose of my inspection was a status check on a producing well. The pad is named Roe and there are a total of 7 wells on this pad. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 315 pounds per square inch on the casing and 170 pounds per square inch on the tubing. Annular pressure monitoring was present. The production equipment for this well consists of eight 400 barrel tanks, seven gas processing units, two compressors, and two Cimarron combustors. The pipeline tie in is located on the west side of the pad. The production records are current, the identification is located at the wellhead, and there are no violations present. |
332594418 | 2014-10-29 0:00 | DD | No Violations | |
834841942 | 2018-3-8 0:00:0 | PW | No Violations | 0.20 |
For data sources see[10]