If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24537 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.86,"lon":-81.37,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Seneca Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001048 | |
Farm/Lease Name: WALSH EAST UNIT | |
License Status: Producing | |
License Date: 2016-12-02 | |
Spud Date: 2014-10-01 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2017-02-11 | |
Well Total Depth: 18829.00 ft | |
Configuration: Horizontal | |
Latitude: 39.860000 | |
Longitude: -81.370000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-09-24 | Proposed Formations:POINT PLEASANT, Issued Date:9/24/2014, Expired Date:9/23/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2016-08-31 | Proposed Formations:POINT PLEASANT, Issued Date:8/31/2016, Expired Date:8/31/2018 12:00:00 PM, Drilling unit acres:620.667, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2016-12-02 | Proposed Formations:POINT PLEASANT, Issued Date:12/2/2016, Expired Date:12/2/2017 12:00:00 PM, Drilling unit acres:240.98, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2016-12-16 | CORRECTION TO WELL NUMBER |
Reached Total Depth | 2017-02-11 | |
Correction to Well | 2017-04-21 | UPDATE TARGET/TAKEPOINT PER AS-DRILLED PLAT RCVD 3-28-17-ALE |
Construction Permit Expires | 2017-12-02 | |
Completion Report Received | 2018-01-29 | |
Record Last Modified | 2018-02-09 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-02-08 | 7939 | 8107 | 48 |
2018-02-08 | 18543 | 18711 | 48 |
18543 | 18711 | 48 | |
7939 | 8107 | 48 | |
7939 | 8107 | 48 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 09/05/2017 | 12/06/2017 | 7988 | 17,867,800.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Antero Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.9672 | 149,017,000.0 |
LGC-15 | U.S. Well Services, LLC | Gelling Agents | Suspending agent (solid) | 14808-60-7 | 3 | 0.007047 | 12075.6 | |
Guar Gum | 9000-30-0 | 50 | 0.046079 | 78955.9 | ||||
Surfactant | 68439-51-0 | 3 | 0.002765 | 4737.35 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.043639 | 74775.8 | ||||
HCL Acid (12.6%-17.5%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 17.5 | 0.032359 | 55446.4 | |
Water | 7732-18-5 | 87.4 | 0.139179 | 238481 | ||||
AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.001939 | 3322 | |
WFRA-405 | U.S. Well Services, LLC | Friction Reducer | Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.020496 | 35120 | |
2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.025461 | 43627.4 | ||||
SI-1200s | U.S. Well Services, LLC | Scale Inhibitor | Proprietary Scale Inhibitor | Proprietary | 10 | 0.001239 | 2123.2 | |
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 12.7063 | 21,772,100.0 | |
Bioclear 2000 | U.S. Well Services, LLC | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.003944 | 6757.91 | |
Deionized Water | 7732-18-5 | 28 | 0.002253 | 3860.09 | ||||
AI-303 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Ethylene glycol | 107-21-1 | 40 | 0.00005000 | 85.8686 | |
Cinnamaldehyde | 104-55-2 | 20 | 0.00001800 | 31.0448 | ||||
Butyl cellosolve | 111-76-2 | 20 | 0.00001600 | 27.0516 | ||||
Polyether | 60828-78-6 | 10 | 0.00000900 | 15.012 | ||||
Formic acid | 64-18-6 | 20 | 0.00001800 | 30.024 | ||||
Acetophenone,thiourea,formaldehyde polymer | 68527-49-1 | 5 | 0.00000400 | 7.506 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-12-06 | H2O | 15 | 7128 Bbl | 406560 | US Well Services Inc | STAGE 54/54
STAGES 2-53 SEE IMAGES |
2017-09-05 | H2O | 15 | 8068 Bbl | 402660 | US Well Services Inc | STAGE 1/54
STAGES 2-53 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ANTERO RESOURCES CORPORATION | 2717967 | 54847 | 344 |
2019 | ANTERO RESOURCES CORPORATION | 380913 | 2116 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ANTERO RESOURCES CORPORATION | Brine | 64270 | 344 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 2784 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1264139100 | 2017-3-23 0:00: | PL | No Violations | 0.50 |
-1628786605 | 2015-10-23 0:00 | PL | No Violations | 0.50 |
-1996031192 | 2014-10-2 0:00: | CS | No Violations | 2.00 |
-2087559844 | 2014-10-1 0:00: | CS | No Violations | 3.00 |
-278433302 | 2018-1-9 0:00:0 | CT | No Violations | 0.50 |
-990639390 | 2017-6-6 0:00:0 | CT | No Violations | 0.50 |
0003826702 | 2017-01-08 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed that Patterson UTI Rig #342 had drilled a 24 inch diameter hole to the depth of 360 feet. Wyoming Casing Crew ran 365 feet of 18.625 inch 87.5 pound per foot J- |
0278433302 | 2018-01-09 | Completion Testing | No Violations | The pad is named Bond and it consists of 9 wells. The purpose of my inspection was a status check. During my inspection Fortis Energy Services was on location with their service rig drilling out frac plugs on the Iles 2H, 3412124540. This well was equipped with a production tree style wellhead with valves in the closed position. Frac plugs have recently been drilled out and the well is prepared to be flowed back. The production equipment consisted of nine gas production units, fifteen 400 barrel tanks, two compressors, and four combustors. |
0990639390 | 2017-06-06 | Completion Testing | No Violations | The pad is named Bond and it consists of 9 wells. The purpose of my inspection was a status check. During my inspection the well was equipped with a Frac valve. The production equipment on the pad consisted of nine gas production units, fifteen 400 barrel tanks, two compressors, and four combustors. Containment was present on the pad with sound walls surrounding the pad as Antero prepares the location for Hydraulic Fracturing operations on the 5 of wells. |
1028203869 | 2018-03-28 | Production Wells | No Violations | At 3:28 p.m. on 3/27/18 Antero Resources Production Supervisor Doug Stubbins called and reported some electrical issues that they were having with their combustor. Mr. Stubbins stated that the electric cable on the combustor burnt up and caused small flame that was extinguished immediately. The pad is named Bond and it consists of 9 wells. The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Pressure monitoring was present on all casing strings. The production equipment consisted of nine gas production units, fifteen 400 barrel tanks, two compressors, and four combustors. Identification was present and production records were current. Antero well tender was on location. |
1264139100 | 2017-03-23 | Preliminary Restoration | No Violations | The pad is named Bond and it consists of 8 wells. The purpose of my inspection was a preliminary restoration. During my inspection Antero was on location with contractors present to nipple up the wellhead and get it tied into production lines. The area affected by the well pad construction has all been restored. There are no slips or erosion issues on location. The production equipment on the pad consisted of eight gas production units, fifteen 400 barrel tanks, two compressors, and two combustors. Location has met 1509.072 A requirements. |
1486996483 | 2017-02-13 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Patterson UTI Rig #342 had reached total depth on their lateral with an 8.75 inch diameter hole to the depth of 18,829 feet. Wyoming Casing Crew was onsite and running 5.5 inch diameter 23 pound per foot production casing currently at 15160 feet with cementing to follow. I completed walk around with Antero Consultant Josh Scharf revealing proper containment was in place and simultaneous operation were taking place with 4 wells producing on the pad. |
1506695608 | 2017-09-28 | Completion Testing | No Violations | The purpose of my inspection was to investigate complaint number 5709. The route taken to enter the pad consisted of taking State Route 147 to Mud Run road and then on to the lease road. Roadways were free from debris. During my inspection Hydraulic Stimulation Operations were staged to take place. US Well Services, Allied Horizontal Wireline, and Antero were all on location. Allied Horizontal Wireline were rigged up to the Walsh 1H permit number 3412124538 to perforate stage 8 of 55 and US Well Services was rigged up to the Iles 1H permit number 3412124539 to prepare and Hydraulically Stimulate stage 21 of 54. No sirens were heard from the pad and there were not any issues on location. |
1628786605 | 2015-10-23 | Preliminary Restoration | No Violations | The well site meets the preliminary restoration requirements of 1509.072(A). |
1874210230 | 2019-8-13 0:00: | PW | No Violations | 0.50 |
1996031192 | 2014-10-02 | Casing String Witnessed | No Violations | I am onsite to witness the conductor cementing operations in a USDW unmapped area. The drilling contractor Express Energy Services drilled 100 of 32 hole and ran100 of 26 weld casing. Allied Oil and Gas Services cemented the casing in place with class A cement. I witnessed good cement returns to surface. |
2087559844 | 2014-10-01 | Casing String Witnessed | No Violations | I am onsite to witness the conductor casing run and cementing operations. Express Energy Services drilled 100 of 32 hole and ran 100 of 26 casing. The cement truck malfunctioned and the cement job was postponed. |
3826702 | 2017-1-8 0:00:0 | CS | No Violations | 11.00 |
418688909 | 2019-9-18 0:00: | PW | No Violations | 0.80 |
For data sources see[10]