Well ID: 34-121-24551 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.9,"lon":-81.25,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Beaver Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-001177 | |
Farm/Lease Name: BROWN 210044 | |
License Status: Producing | |
License Date: 2014-11-13 | |
Spud Date: 2014-11-28 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2015-05-21 | |
Well Total Depth: 16245.00 ft | |
Configuration: Horizontal | |
Latitude: 39.900000 | |
Longitude: -81.250000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-11-13 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:11/13/2014, Expired Date:11/12/2016 12:00:00 PM, Drilling unit acres:618.856, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2015-05-21 | Status/TD depth based on Drill Survey 11-6-2015 ALE |
Correction to Well | 2016-03-25 | change in target/takepoint per as drilled plat-ALE |
Construction Permit Expires | 2016-11-12 | Status/TD depth based on Drill Survey 11-6-2015 ALE |
Completion Report Received | 2016-12-16 | Status/TD depth based on Drill Survey 11-6-2015 ALE |
Record Last Modified | 2017-10-23 | Status/TD depth based on Drill Survey 11-6-2015 ALE |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-12-16 | 10165 | 16106 | 0 |
10165 | 16106 | 0 | |
10165 | 16106 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/29/2016 | 06/29/2016 | 8191 | 9,335,840.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ||||||||
FR-76, SAND-COMMON WHITE - 100
MESH, 3307 LB BAG, SAND-PREMIUM WHITE-40/70, BULK |
Halliburton | Friction Reducer, Proppant | NA | NA | 0 | 0 | 0 | |
NA | Listed Below | 0 | 0 | 0 | ||||
HYDROCHLORIC ACID | Halliburton | Base Fluid | NA | NA | 0 | 0 | 0 | |
NA | Listed Below | 0 | 0 | 0 | ||||
Hydrochloric acid | 7647-01-0 | 60 | 0.24078 | 0 | ||||
Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 89.1893 | 77,767,300.0 | |
Hazardous and Non-Hazardous Ingredients | Hydrochloric acid | 7647-01-0 | 60 | 0.24078 | 209946 | |||
Crystalline silica, quartz | 14808-60-7 | 100 | 10.3297 | 9,006,800.0 | ||||
Water | 7732-18-5 | 100 | 0.44915 | 391631 | ||||
Acrylamide acrylate polymer | Confidential | 30 | 0.0239246 | 20861 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.0239246 | 20861 | ||||
Sodium chloride | 7647-14-5 | 30 | 0.0239246 | 20861 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-07-02 | H2O | 10 | 265989 Gal | 275600 | Halliburton | STAGE 33/33
50 SHOTS |
2016-06-16 | H2O | 15 | 276106 Gal | 275600 | Halliburton | STAGE 1/33
50 SHOTS STAGES 2-32 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | GULFPORT ENERGY CORPORATION | 1729922 | 5058 | 147 |
2017 | GULFPORT ENERGY CORPORATION | 1936753 | 802 | 364 |
2018 | GULFPORT ENERGY CORPORATION | 950164 | 0 | 363 |
2019 | GULFPORT ENERGY CORPORATION | 173689 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | GULFPORT ENERGY CORPORATION | Brine | 16221 | 147 |
2017 | GULFPORT ENERGY CORPORATION | Brine | 15339 | 364 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 7560 | 363 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 1454 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-30096152 | 2017-2-14 0:00: | PW | No Violations | 0.50 |
-312637636 | 2015-5-13 0:00: | DD | No Violations | 2.00 |
-805850253 | 2015-5-3 0:00:0 | CS | No Violations | 5.00 |
-823958510 | 2017-6-7 0:00:0 | PW | No Violations | 0.50 |
0030096152 | 2017-02-14 | Production Wells | No Violations | The purpose of my inspection is a status check. During my inspection the well was equipped with a production tree with valves in the open position. Gauges present read 1100 pounds per square inch on the casing and 500 pounds per square inch on the tubing. Annular pressure monitoring was present. The production equipment included three gas production units, three sand traps, two gas combustors, one 50 barrel tank, and four 400 barrel tanks within containment. All production equipment is shared with 3412124550, 3412124551, and 3412124552. Identification was present and production records were current. I was accompanied by ODNR inspector Doug Bennett. |
0312637636 | 2015-05-13 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling contractor Patterson Drilling 257 is drilling 12.25 hole at a depth of 4738. No violations were noted. |
0611636283 | 2018-09-18 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges were present on all casing strings. The cellar was full of water and was bubbling. The production equipment consisted of three sand traps, three gas production units, and four 400-barrel tanks. Two combustors are decommissioned laying on the side of the pad. Gulfport Production Superintendent Robert Coots notified ODNR of a small wellhead leak on the Brown 1A. Gulfport is working on a plan for remediation. |
0724985617 | 2015-08-13 | Preliminary Restoration | No Violations | I am accompanied by Inspector Brian Sefcik on my inspection today. The well site meets the preliminary restoration requirements of 1509.072(A). |
0805850253 | 2015-05-03 | Casing String Witnessed | No Violations | My inspection today finds the drilling rig, Patterson 257, drilled 359 of 24 hole then with the assistance of Wyoming Casing ran 357.5 of J-55 18.625 casing. Ten centralizers were utilized to provide adequate stand off. Stingray cemented the casing in place by circulating 116 barrels of cement on the backside of the casing. |
0823958510 | 2017-06-07 | Production Wells | No Violations | The purpose of my inspection was a status check on a producing well. The pad is named Brown and there are a total of three wells on this pad. During my inspection the well was equipped with a production tree style wellhead with production valves in the open position. Gauges present read 800 pounds per square inch on the casing and 500 pounds per square inch on the tubing. Annular pressure monitoring was present. The production equipment consists of one 50 barrel tank, four 400 barrel tanks within a lined steel containment, three gas production units, three sand traps, and two combustors. The pipeline tie in is located on the east side of the pad. The production records are current, the identification was located at the wellhead, and there were no violations present. |
1272205698 | 2015-05-06 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling contractor, Patterson Drilling 257, is pulling drill pipe out of the well after reaching a total depth of 1971 of 17.5 hole. |
1470417131 | 2016-08-05 | Production Wells | No Violations | On August 4, at 9:27 AM, I received a telephone call from George Muller who stated that he lived adjacent to the Brown well pad. Mr. Muller stated that he could see a fifty to sixty foot flare burning on the pad and he was concerned about his safety. At the time of my inspection I found the pad in the initial production phase. A flare no more than ten feet tall was burning at the flare stack. While speaking to the Gulfport representative I was able to determine that the cause for the large flare on the previous day was high line pressure due to a Mark West facility mechanical problem. For now, the company is producing the well trough their flow back equipment due to high pressures and flow rates. The company representative stated that he did not anticipate the flare stack being utilized for more than two weeks. |
1532705923 | 2018-07-27 | Production Wells | No Violations | Status check inspection found the well in production and flowing through a production tree into a 3 sales line with 200 psi currently showing on the production flow line. There is an emergency shut down device on the production flow line with multiple control points on the well pad. Annular pressure monitoring is in place on the 13.375 and 9.625 well head sections with zero pressure showing between the 5.5 diameter production casing and 9.625 diameter intermediate casing. There is 250 psi between the 9.625 casing and 13.375 casing strings. Also on this day I contacted Gulfports production foreman Eric Intermale and asked him to address a small leak that appears to be coming from the well head from under the fluid level inside the cellar. There are 3 active wells on the site with proper well identification posted on each well head. The production equipment consists of 3 gas processing units along with 4 steel construction 400 barrel capacity production tanks situated inside a polymer lined steel containment dike area. |
1603124109 | 2020-10-19 0:00 | PW | No Violations | 0.20 |
1892022947 | 2019-12-24 0:00 | PW | No Violations | 0.80 |
2056542228 | 2017-02-14 | Production Wells | No Violations | On the day of my inspection I accompanied ODNR Inspector Austin Gutridge, please see Inspector Gutridge report for details. |
611636283 | 2018-9-18 0:00: | PW | No Violations | 0.20 |
724985617 | 2015-8-13 0:00: | PL | No Violations | 0.20 |
For data sources see[10]