If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24582 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.8,"lon":-81.49,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Center Township | |
Operator Name: NORTHWOOD ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: QUEST | |
License Status: Producing | |
License Date: 2015-06-01 | |
Spud Date: 2016-05-31 | |
Spud Drilling Contractor: DECKER WELL SERVICE | |
Final Drill Date: 2016-06-04 | |
Well Total Depth: 3560.00 ft | |
Configuration: Vertical | |
Latitude: 39.800000 | |
Longitude: -81.490000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-06-01 | Proposed Formations:BEREA THRU DEVONIAN SHALE, Issued Date:6/1/2015, Expired Date:5/31/2017 12:00:00 PM, Drilling unit acres:36, Proposed Well Type:OG, Proposed Well Class:ENPW |
Reached Total Depth | 2016-06-04 | |
Completion Report Received | 2016-10-04 | |
Construction Permit Expires | 2017-05-31 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-10-05 | 2578 | 3498 | 214 |
2578 | 3498 | 214 | |
2578 | 3498 | 214 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-07-11 | H2O | 8 | 6030 Bbl | 60000 | Producers Service Corporation | STAGE 1 |
2016-07-14 | H2O | 0 | 6024 Bbl | 54500 | Producers Service Corporation | STAGE 2 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | NORTHWOOD ENERGY CORP | 844.00 | 0.00 | 115 |
2017 | NORTHWOOD ENERGY CORP | 2431.00 | 256.00 | 365 |
2018 | NORTHWOOD ENERGY CORP | 1312.00 | 404.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | NORTHWOOD ENERGY CORP | Brine | 3873 | 115 |
2017 | NORTHWOOD ENERGY CORP | Brine | 1013 | 365 |
2018 | NORTHWOOD ENERGY CORP | Brine | 221 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1527761470 | 2017-7-10 0:00: | PW | No Violations | 2.00 |
-1885631286 | 2020-7-29 0:00: | PW | No Violations | 0.50 |
-1896802054 | 2020-4-23 0:00: | PW | No Violations | |
-1937735826 | 2020-10-21 0:00 | PW | No Violations | 1.00 |
-1960871425 | 2020-3-4 0:00:0 | PW | No Violations | 1.00 |
-391059463 | 2020-5-12 0:00: | PW | No Violations | |
-776578271 | 2020-3-9 0:00:0 | PW | No Violations | 1.00 |
-878121354 | 2017-7-6 0:00:0 | PW | No Violations | 3.00 |
0878121354 | 2017-07-06 | Production Wells | No Violations | |
1181375975 | 2020-3-4 0:00:0 | PW | No Violations | 0.50 |
1276397952 | 2020-3-20 0:00: | PW | No Violations | 0.50 |
1422565138 | 2018-07-09 | Preliminary Restoration | No Violations | The purpose of my inspection was a status check on a preliminary restoration. The location had been graded with vegetation growth. No erosion issues were noticed. The well was equipped with 4.5 inch diameter production casing with a tubing head, 2.375 inch diameter tubing, rods, and a pumping unit powered by natural gas. The production valve on the tubing was in the open position. The line feeding the natural gas motor was connected to the 4.5 inch casing. The production equipment consisted of one 210 barrel tank, one 100 barrel tank, one horizontal separator, and one sales meter. The sales meter had a 2 inch diameter sales line, .375 inch orifice plate, and a chart recorder with a current chart. Northwood Energy has submitted reports of production for the year 2017. The identification was located on the 210 barrel tank. The location has met Preliminary Restoration requiments. |
1464719081 | 2016-05-31 | Casing String Witnessed | No Violations | 05/31/2016 -Decker Drilling rig #9 is rigged up on the hole and drilled a 120 x 15 conductor borehole and set 107 of 11.750 conductor pipe. Formation cementing cemented the conductor using 90 sacks of class A cement with cement returns witnessed to surface and circulation established prior to and maintained throughout the cement job. |
1464823101 | 2016-06-01 | Casing String Witnessed | No Violations | On site inspection to witness the running and cementing of the surface casing. Decker Drilling is on the hole and has drilled a 11 surface borehole to 1,340, the hole was dusted to 740 and misted past that point. 1,280 of 8.625 24LB/FT casing was ran with a guide shoe - 5 centralizers installed along with a cement basket at 300. Formation Cementing was on location to cement the casing using a lead and tail cement mix with 160 sacks of class A-3% calcium -3% gel ran as the lead cement and a class A 3% calcium 2% gel tail cement mix ran. Circulation was established prior to cementing and the cement was displaced with 81 barrels of fresh water with the casing pressure tested to 500 psi over cement displacement lift pressure and cement returns witnessed to surface. |
1527761470 | 2017-07-10 | Production Wells | No Violations | The purpose of my inspection today is a status check on a small oil release within a lined earthen dike surrounding the wellhead. During my inspection today the oil saturated oil absorbent pads have been removed from location and new oil absorbent pads have been placed in the dike. Follow ups will be completed until the oil absorbent pads and contamination have been removed. |
1585753064 | 2020-4-1 0:00:0 | PW | No Violations | 0.50 |
1643593561 | 2020-5-5 0:00:0 | PW | No Violations | 0.50 |
For data sources see[9]