If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24589 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.69,"lon":-81.39,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Jefferson Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001279 | |
Farm/Lease Name: FOGLE UNIT | |
License Status: Producing | |
License Date: 2015-07-09 | |
Spud Date: 2015-09-16 | |
Spud Drilling Contractor: PATTEN DRLG | |
Final Drill Date: 2016-02-25 | |
Well Total Depth: 16717.00 ft | |
Configuration: Horizontal | |
Latitude: 39.690000 | |
Longitude: -81.390000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-07-09 | Proposed Formations:POINT PLEASANT, Issued Date:7/9/2015, Expired Date:7/8/2017 12:00:00 PM, Drilling unit acres:217.051, Proposed Well Type:OG, Proposed Well Class:FWC |
Correction to Well | 2016-01-01 | change in target/takepoint per as-drilled plat-ALE |
Reached Total Depth | 2016-02-25 | Status based on as-drilled plat/survey 12-28-15 ALE |
Completion Report Received | 2016-04-28 | Status based on as-drilled plat/survey 12-28-15 ALE |
Construction Permit Expires | 2017-07-08 | Status based on as-drilled plat/survey 12-28-15 ALE |
Record Last Modified | 2018-07-24 | Status based on as-drilled plat/survey 12-28-15 ALE |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-04-27 | 8364 | 16630 | 0 |
8364 | 16630 | 0 | |
8364 | 16630 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 12/21/2015 | 01/04/2016 | 8228 | 12,500,800.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 87.5 | 0.15731 | 180454 |
Hydrogen Chloride | 7647-01-0 | 18 | 0.03758 | 43104.7 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 8.54648 | 9,803,710.0 | |
LGC-15 | U.S. Well Services | Gelling Agents | Surfactant | 68439-51-0 | 3 | 0.0066 | 7566.54 | |
Petroleum Distillates | 64742-47-8 | 60 | 0.10412 | 119433 | ||||
Guar Gum | 9000-30-0 | 50 | 0.10994 | 126109 | ||||
Suspending agent (solid) | 14808-60-7 | 3 | 0.01681 | 19287.3 | ||||
Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 90.8865 | 104,256,000.0 | |
SI-1100 | U.S. Well Services | Scale Inhibitor | Phosphino carboxylic acid polymer | 71050-62-9 | 5 | 0.00085 | 973.069 | |
Potassium salt of diethylene triamine
penta (methylene phosphonic acid) |
15827-60-8 | 7.5 | 0.00132 | 1515.74 | ||||
Hexamethylene diamine penta (methylene phosphonic acid) | 23605-74-5 | 2 | 0.00034 | 389.228 | ||||
Copolymer of Maleic and Acrylic acid | 52255-49-9 | 10 | 0.00154 | 1766.5 | ||||
Ethylene Glycol | 107-21-1 | 25 | 0.00369 | 4229.11 | ||||
Water | 7732-18-5 | 80 | 0.01044 | 11976.2 | ||||
Hexamethylene tramine penta (methylene phosphonic acid) | 34690-00-1 | 5 | 0.00085 | 973.069 | ||||
WFRA-405 | U.S. Well Services | Friction Reducer | 2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.02678 | 30719.6 | |
Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.02156 | 24729.2 | ||||
Ethoxylated alcohol blend | 68002-97-1 | 4 | 0.00357 | 4095.94 | ||||
Water | 7732-18-5 | 60 | 0.05356 | 61439.1 | ||||
K-BAC 1020 | U.S. Well Services | Anti-Bacterial Agent | Deionized Water | 7732-18-5 | 28 | 0.00251 | 2876.97 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00439 | 5036.75 | ||||
AP One | U.S. Well Services | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00252 | 2892 | |
AI-302 | U.S. Well Services | Acid Corrosion Inhibitors | 2-Propyn-1-olcompound with methyloxirane | 38172-91-7 | 15 | 0.00011 | 123.849 | |
Water | 7732-18-5 | 95 | 0.00068 | 784.377 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-12-29 | H2O | 0 | 5953 Bbl | 232910 | US Well Services Inc | Company refused to provide the volumes of Gel, inhibitor, friction reducer and biocide for this stage. |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ANTERO RESOURCES CORPORATION | 2545399 | 29937 | 366 |
2017 | ANTERO RESOURCES CORPORATION | 1401358 | 4453 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 931844 | 3909 | 365 |
2019 | ANTERO RESOURCES CORPORATION | 197761 | 443 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ANTERO RESOURCES CORPORATION | Brine | 21328 | 366 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 8321 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 10038 | 365 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 1667 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1085397342 | 2015-11-2 0:00: | DD | No Violations | 2.00 |
-1171446364 | 2018-9-24 0:00: | PW | No Violations | 0.50 |
-1171611905 | 2016-6-16 0:00: | PL | No Violations | 1.00 |
-162278622 | 2018-9-24 0:00: | PW | No Violations | 0.50 |
-384209426 | 2015-12-18 0:00 | CT | No Violations | 2.00 |
-915032098 | 2018-10-30 0:00 | PW | No Violations | 0.80 |
0162278622 | 2018-09-24 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with production valves in the open position. The production equipment consisted of two dual sand traps, two gas production units, triethylene glycol dehydration unit, four combustors, one vapor recovery tower, and eight 400-barrel tanks. The identification was located at the wellhead. Annular pressure monitoring was not present. |
0384209426 | 2015-12-18 | Completion Testing | No Violations | My inspection today finds the Fortis service rig is preparing to perforate the toe of the well after the toe sleeve did not properly open. Perforations will be shot from 16,636 to 16,605. |
0787013095 | 2017-08-09 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. The well was located on the Bettinger pad. During my inspection the well was equipped with a production tree style wellhead with production valves in the open position. Gauges present on the casing read 290 pounds per square inch and 280 pounds per square inch on the tubing. Annular pressure monitoring was present. Three well stakes had been driven beside the wellhead showing the proposed location of wells yet to be drilled. The production equipment consisted of eight 400 barrel tanks, one gas production unit, one compressor, and one combustor. Contractors for Antero Resources were on location setting up additional production equipment such as sand traps, gas production units, and combustors. Antero discussed the possibility of mobilizing H P Drilling Rig 519 onto the pad to drill additional wells. |
0915032098 | 2018-10-30 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with 5.5-inch diameter production casing and 2.875-inch diameter tubing that appeared to be open flowing. At the time of my inspection annular pressure monitoring was not in place. Production equipment included an 2 individual Sand Traps, and Gas Processing Unit, as well as 8 400-barrel steel production fluid tanks, and 4 combustors that were shared with the other producing wells on the pad. There was a compressor unit and midstream equipment on the Southern Corner of the pad. There was secondary containment around the production fluid tanks. The well pad was contained within an earthen dike, there were multiple Emergency Shutoff Devices on location. Identification tags were present, and production was up to date. |
1085397342 | 2015-11-02 | Drill / Deepen / Reopen | No Violations | My inspection today finds Patterson Drilling 340 is making up tools to drill the 12.25 section of the well. |
1171446364 | 2018-09-24 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with production valves in the open position. The production equipment consisted of two dual sand traps, two gas production units, triethylene glycol dehydration unit, four combustors, one vapor recovery tower, and eight 400-barrel tanks. The identification was located at the wellhead. Annular pressure monitoring was not present. |
1171611905 | 2016-06-16 | Preliminary Restoration | No Violations | My inspection today finds the well is equipped in a manner consistent with being capable of production. The tank battery consists of eight 400 barrel tanks set in a spray lined steel containment system. The well site meets the preliminary restoration requirements of 1509.072(A). |
1442500498 | 2015-09-17 | Casing String Witnessed | No Violations | My inspection today finds Express Energy Services drilled a 100 of thirty inch diameter borehole. Express then ran 100 of 26 weld casing. Express Energy Services mixed and pumped 330 sacks of class A cement. I witnessed 23 barrels of cement circulate back to surface. The cement that was circulated to surface was removed from inside the cellar and placed on the back side of the cellar to seal it in place. A mouse hole with steel base plate was also cemented in place. |
1446143057 | 2015-10-29 | Casing String Witnessed | No Violations | |
1515534260 | 2018-01-09 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. The well was located on the Bettinger pad. During my inspection the well was equipped with a production tree style wellhead with production valves in the open position. The production equipment consisted of eight 400 barrel tanks, two gas production units, one compressor, and 4 combustors. |
2085082452 | 2015-12-29 | Production Wells | No Violations | My inspection today finds U.S. Well Service is providing hydraulic stimulation services for stage 23. All volumes and pressures are recorded in the stimulation report. The bottom shot is at 12,752 and the upper most shot is at 12,603 with a total of 60 shots. |
787013095 | 2017-8-9 0:00:0 | PW | No Violations | 1.00 |
For data sources see[10]