If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24596 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.88,"lon":-81.27,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Beaver Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001330 | |
Farm/Lease Name: QUINTEL UNIT | |
License Status: Producing | |
License Date: 2015-10-20 | |
Spud Date: 2015-11-12 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2016-03-09 | |
Well Total Depth: 18539.00 ft | |
Configuration: Horizontal | |
Latitude: 39.880000 | |
Longitude: -81.270000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-10-20 | Proposed Formations:POINT PLEASANT, Issued Date:10/20/2015, Expired Date:10/19/2017 12:00:00 PM, Drilling unit acres:548.101, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2016-03-09 | |
Correction to Well | 2016-05-20 | CHANGE IN TARGET/TAKEPOINT PER AS-DRILLED PLAT-ALE |
Completion Report Received | 2017-01-23 | |
Construction Permit Expires | 2017-10-19 | |
Record Last Modified | 2019-01-18 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-11-15 | 8638 | 18428 | 0 |
8638 | 18428 | 0 | |
8638 | 18428 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 08/03/2016 | 09/24/2016 | 8275 | 17,644,300.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SI-1100s | U.S. Well Services, LLC | Scale Inhibitor | Copolymer of Maleic and Acrylic acid | 52255-49-9 | 10 | 0.00146 | 2444.55 |
Phosphino carboxylic acid polymer | 71050-62-9 | 3 | 0.00048 | 807.946 | ||||
Potassium salt of diethylene triamine
penta (methylene phosphonic acid) |
15827-60-8 | 3 | 0.0005 | 839.021 | ||||
Hexamethylene tramine penta (methylene phosphonic acid) | 34690-00-1 | 3 | 0.00048 | 807.946 | ||||
AI-302 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Water | 7732-18-5 | 95 | 0.00033 | 554.61 | |
2-Propyn-1-olcompound with methyloxirane | 38172-91-7 | 15 | 0.00005000 | 87.57 | ||||
WFRA-405 | U.S. Well Services, LLC | Friction Reducer | Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.02598 | 43502.8 | |
2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.03227 | 54040.7 | ||||
LGC-15 | U.S. Well Services, LLC | Gelling Agents | Petroleum Distillates | 64742-47-8 | 60 | 0.03958 | 66268.2 | |
Suspending agent (solid) | 14808-60-7 | 3 | 0.00639 | 10701.7 | ||||
Guar Gum | 9000-30-0 | 50 | 0.04179 | 69972.7 | ||||
Surfactant | 68439-51-0 | 3 | 0.00251 | 4198.36 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 11.7721 | 19,712,000.0 | |
HCL Acid (12.6%-17.5%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 87.4 | 0.15221 | 254865 | |
Hydrogen Chloride | 7647-01-0 | 17.5 | 0.03539 | 59255.7 | ||||
AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00157 | 2629 | |
K-BAC 1020 | U.S. Well Services, LLC | Anti-Bacterial Agent | Deionized Water | 7732-18-5 | 28 | 0.00234 | 3911.46 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00409 | 6847.85 | ||||
Water | Antero Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 87.8805 | 147,153,000.0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-09-24 | H2O | 15 | 6819 Bbl | 356100 | US Well Services Inc | STAGE 56/56
60 SHOTS |
2016-08-29 | H2O | 15 | 7746 Bbl | 170260 | US Well Services Inc | STAGE 1/56
60 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ANTERO RESOURCES CORPORATION | 92343 | 2327 | 31 |
2017 | ANTERO RESOURCES CORPORATION | 2283039 | 28274 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 897736 | 2221 | 365 |
2019 | ANTERO RESOURCES CORPORATION | 160559 | 229 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | ANTERO RESOURCES CORPORATION | Brine | 2911 | 31 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 52224 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 14349 | 365 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 1745 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1067207886 | 2016-2-23 0:00: | DD | No Violations | |
-1187804249 | 2017-10-24 0:00 | PW | No Violations | 0.20 |
-1839987527 | 2015-12-21 0:00 | CS | No Violations | 6.00 |
-910688820 | 2015-12-21 0:00 | CS | No Violations | 2.00 |
0587668166 | 2016-02-23 | Preliminary Restoration | No Violations | My inspection today finds the well site meets the preliminary restoration requirements of 1509.72(A). |
0732471228 | 2017-03-16 | Production Wells | No Violations | The pad is named Quintel and it consists of 10 wells. The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present. The production equipment consisted of 10 sand traps, 10 gas production units, fourteen 400 barrel tanks, three compressors, and four combustors. Identification was present and production records were current. |
0775389680 | 2015-12-28 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling contractor, Patterson Drilling 342, is tripping drill pipe out of the well after reaching a depth of 7548. |
0779829675 | 2018-09-18 | Production Wells | No Violations | The Quintel Pad consists of 10 wells and 1 conductor. The purpose of my inspection was a status check. The well was equipped with a production tree style wellhead. Production valves were in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of ten gas production units, fourteen 400 barrel tanks, three compressors, and two combustors. Identification was present and production records were current. |
0910688820 | 2015-12-21 | Casing String Witnessed | No Violations | I am onsite to witness the surface casing string installation and cementing operations. 13.375 casing has been ran to 1215. While landing the casing the rig crew broke the Camron load ring system. It will be several hours before another arrives. |
1067207886 | 2016-02-23 | Drill / Deepen / Reopen | No Violations | Patterson Drilling rig 342 is drilling an 8.5 lateral borehole at a depth of 14,120. The company anticipates reaching their total depth on Thursday. |
1187804249 | 2017-10-24 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. The pad is named Quintel and it consists of 10 wells. The well was equipped with a production tree style wellhead. Production valves were in the open position. Production and annular pressure monitoring was present. Gauges were covered with plastic today due to the wellheads being recently painted. The production equipment consisted of ten gas production units, fourteen 400 barrel tanks, three compressors, and four combustors. Identification was present and production records were current. A Myers Well Services truck was on location hauling produced fluids from the tank battery and Antero well tender was on location. The pipeline tie in was located on the West side of the pad. The identification was located at the wellhead and the production records were current. |
1329441771 | 2017-05-16 | Production Wells | No Violations | The pad is named Quintel and it consists of 10 wells. The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Annular pressure monitoring was present. The production equipment consisted of 10 sand traps, 10 gas production units, fourteen 400 barrel tanks, three compressors, and four combustors. Identification was present and production records were current. Myers Well Services had four trucks on location hauling produced fluids from the tank battery. Dust suppression was recently applied on the lease road by Ramco. |
1447491620 | 2015-11-13 | Casing String Witnessed | No Violations | My inspection today finds Express Energy Services drilled a 32 borehole to a depth of 100. The rig the installed 100 of 26 weld casing. Express Energy then cemented the casing in place using 330 sacks of class A cement. I witnessed 20 barrels of cement circulate to surface. A test of the mix water with a Quantab indicated total chlorides present at 32 ppm. |
1839987527 | 2015-12-21 | Casing String Witnessed | No Violations | I am onsite to witness the surface casing string installation and cementing operations. A test of the cement mix water, with a low range Quantab, prior to the job, indicated total chlorides are present at 32 ppm. Halliburton cemented the casing in place with class A cement. I witnessed 80 barrels of cement circulate to surface. |
224108650 | 2019-8-20 0:00: | PW | No Violations | 0.50 |
587668166 | 2016-2-23 0:00: | PL | No Violations | |
732471228 | 2017-3-16 0:00: | PW | No Violations | 0.50 |
775389680 | 2015-12-28 0:00 | DD | No Violations | 2.00 |
779829675 | 2018-9-18 0:00: | PW | No Violations | 0.10 |
For data sources see[10]