If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-121-24600 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.77,"lon":-81.32,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Noble | |
| Municipality: Stock Township | |
| Operator Name: ECLIPSE RESOURCES I LP | |
| Well Pad ID: US-OH-000888 | |
| Farm/Lease Name: DUANE WEISEND EAST | |
| License Status: Producing | |
| License Date: 2017-01-05 | |
| Spud Date: 2017-01-20 | |
| Spud Drilling Contractor: H&P DRILLING | |
| Final Drill Date: 2017-03-09 | |
| Well Total Depth: 18644.00 ft | |
| Configuration: Horizontal | |
| Latitude: 39.770000 | |
| Longitude: -81.320000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2015-11-20 | Proposed Formations:TRENTON, Issued Date:11/20/2015, Expired Date:11/19/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
| APP | 2017-01-05 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:1/5/2017, Expired Date:1/5/2019 12:00:00 PM, Drilling unit acres:540.342, Proposed Well Type:OG, Proposed Well Class:POOL |
| Correction to Well | 2017-02-10 | CORRECTION TO SURFACE, TARGET AND TAKE-POINT INFORMATION. UNIT SIZE CHANGED TO 441.868 ACRES. |
| Reached Total Depth | 2017-03-09 | |
| Completion Report Received | 2017-08-14 | |
| Correction to Well | 2017-10-20 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
| Record Last Modified | 2018-02-27 | |
| Construction Permit Expires | 2019-01-05 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2017-08-22 | 8567 | 8888 | 60 |
| 2017-08-22 | 18383 | 18578 | 9 |
| 18383 | 18578 | 9 | |
| 8567 | 8888 | 60 | |
| 8567 | 8888 | 60 |
For data sources see[3]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 05/02/2017 | 05/22/2017 | 8229 | 20,856,700.0 | 0 |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 |
| HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
| OILPERM A | Halliburton | Non-ionic Surfactant | Listed Below | Listed Below | 0 | 0 | 0 | |
| Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,
branched |
127087-87-0 | 5 | 0.00001463 | 29 | ||||
| Crystalline silica, quartz | 14808-60-7 | 100 | 10.4168 | 20,378,000.0 | ||||
| Hydrochloric acid | 7647-01-0 | 15 | 0.01193 | 23329 | ||||
| Ammonium persulfate | 7727-54-0 | 100 | 0.00168434 | 3295 | ||||
| Distillates (petroleum, hydrotreated
light) (petroleum, hydrotreated light |
64742-47-8 | 18 | 0.00681457 | 13332 | ||||
| 1,2,4 Trimethylbenzene | 95-63-6 | 1 | 0.00000293 | 6 | ||||
| Ethoxylated alcohols | Proprietary | 30 | 0.00008636 | 169 | ||||
| Olefins | Proprietary | 5 | 0.00003455 | 70 | ||||
| Fatty acids, tall oil | Proprietary | 30 | 0.00008636 | 169 | ||||
| Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.00008636 | 169 | ||||
| Distillates (petroleum, hydrotreated light( | 64742-47-8 | 45 | 0.000168442 | 330 | ||||
| Propargyl alcohol | 107-19-7 | 10 | 0.00002879 | 57 | ||||
| Methanol | 67-56-1 | 60 | 0.000172725 | 338 | ||||
| Ethanol | 64-17-5 | 60 | 0.000175523 | 344 | ||||
| Sodium hydroxide | 1310-73-2 | 11.25 | 0.000902293 | 1766 | ||||
| Poly(oxy-1,2-ethanediyl), a-tridecyl-w-hydroxy-, branched | 69011-36-5 | 5 | 0.00001872 | 37 | ||||
| Naphthalene | 91-20-3 | 5 | 0.00001463 | 29 | ||||
| Organic phosphate copolymer | 71050-62-9 | 25 | 0.00357169 | 6988 | ||||
| Acetic acid | 64-19-7 | 60 | 0.00104428 | 2043 | ||||
| Oxyalkylated phenolic resin | Proprietary | 30 | 0.000117015 | 230 | ||||
| Tetrahydro-3,5-dimethyl-2H-1,3,5-thadiazine-2-thione | 533-74-4 | 24 | 0.000147615 | 289 | ||||
| Acetic anhydride | 108-24-7 | 100 | 0.00174046 | 3405 | ||||
| Ammonium chloride | 12125-02-9 | 1.5 | 0.000567881 | 1111 | ||||
| Dazomet | 533-74-4 | 24 | 0.00499859 | 9779 | ||||
| Heavy aromatic petroleum naphtha | 64742-94-5 | 30 | 0.00008776 | 172 | ||||
| FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
| Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 83.4903 | 163,329,000.0 | |
| Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 0.159001 | 311049 | |
| SAND-COMMON WHITE - 100 MESH | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
| HP-2814 | One AquaSource | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
| MB-7532 | One AquaSource | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
| HP-2220 | One AquaSource | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
| MB-7530 | One AquaSource | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
| HP-2816 | One AquaSource | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
| SAND-PREMIUM WHITE-40/70 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
| HP-9601 | One AquaSource | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
| Produced Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 5.85588 | 11,455,600.0 |
For data sources see[4]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2017-05-02 | H2O | 15 | 497029 Gal | 386900 | Halliburton | STAGE 1/63
STAGES 2-62 SEE IMAGES |
| 2017-05-22 | H2O | 15 | 333178 Gal | 340500 | Halliburton | STAGE 63/63
STAGES 2-62 SEE IMAGES |
For data sources see[5]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2017 | ECLIPSE RESOURCES I LP | 1797966 | 0 | 194 |
| 2018 | ECLIPSE RESOURCES I LP | 1070483 | 0 | 358 |
| 2019 | ECLIPSE RESOURCES I LP | 197417 | 0 | 90 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2017 | ECLIPSE RESOURCES I LP | Brine | 55768 | 194 |
| 2018 | ECLIPSE RESOURCES I LP | Brine | 22637 | 358 |
| 2019 | ECLIPSE RESOURCES I LP | Brine | 3764 | 90 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1526349153 | 2017-1-21 0:00: | CS | No Violations | 4.00 |
| -1916482828 | 2017-4-25 0:00: | PL | No Violations | 1.00 |
| 0712585641 | 2017-02-27 | Drill / Deepen / Reopen | No Violations | During my inspection the H&P Drilling Rig 531 was drilling the 8.75 inch diameter borehole at a depth of 11,445 feet. |
| 1484923044 | 2017-01-20 | Drill / Deepen / Reopen | No Violations | Precision Drilling equipment was on location with two rotary auger rigs, one is drilling the 6H and the other is drilling the 8H. During my inspection Precision was drilling the 30 inch conductor hole at a depth of 71 feet. The proposed depth of the hole is 120 feet. According to Precision personnel the casing will be ran today 1/20/17 and cemented tomorrow 1/21/17. |
| 1486743965 | 2017-02-10 | Casing String Witnessed | No Violations | The purpose of my inspection today is to witness the cementing of the surface casing. Halliburton was on location to cement 1750 feet of the 13.375 inch diameter surface casing within a 17.5 inch diameter borehole. A pre-job safety meeting was held with all personnel on location. Haliburton pumped 300 barrels of fresh water, 25 barrels of gel spacer, 10 barrels water, and 315 barrels of cement at 15.8 pound per gallon. Top plug was dropped and displaced with 262 barrels of water. 60 barrels of cement returns were witnessed in the cellar. |
| 1503329967 | 2017-08-21 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. During my inspection the well was equipped with a workover hand wheel gate valve at the base of a production tree style wellhead with valves in the open position. Pressure monitoring was present on the tubing, casing, and the annulus. The production equipment consisted of six 400 barrel tanks, triethylene glycol dehydration unit, three sand traps, three gas production units, and one gas combustor. Acadian Contractors were on location working on production equipment. Deep Well Services and ST&E were loading produced fluids from tank battery. |
| 1526349153 | 2017-01-21 | Casing String Witnessed | No Violations | The purpose of my inspection today is to witness the 24 inch diameter conductor being cemented into a 30 inch diameter hole that is 120 feet in depth. Water was encountered at 35 feet during the drilling process. Stingray Cementing, Precision Rathole, Petta, and Eclipse are all on location. A pre-job safety meeting was held with all personnel on location. Stingray pumped to break circulation then 15 barrels of gel spacer, 10 barrels of fresh water, 62.5 barrels of cement weighing 15.6 pounds per gallon, and 58 barrels of displacement. 19 barrels of cement returns were established. |
| 1895589889 | 2017-02-02 | Drill / Deepen / Reopen | No Violations | During my inspection HP Drilling Rig 531 was rigging up on location. I spoke with Eclipse Company man to discuss a timeline for spudding. He believes to start the surface borehole in seven days. |
| 1916482828 | 2017-04-25 | Preliminary Restoration | No Violations | The purpose of my inspection was a status check on a preliminary restoration. During my inspection Halliburton was setting up on location to preform completion operations. There were no violations present and location has met 1509.072 A requirements. |
| 712585641 | 2017-2-27 0:00: | DD | No Violations | 1.00 |
For data sources see[10]