X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24600

Well Details

Well ID: 34-121-24600
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Stock Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-000888
Farm/Lease Name: DUANE WEISEND EAST
License Status: Producing
License Date: 2017-01-05
Spud Date: 2017-01-20
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2017-03-09
Well Total Depth: 18644.00 ft
Configuration: Horizontal
Latitude: 39.770000
Longitude: -81.320000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-11-20 Proposed Formations:TRENTON, Issued Date:11/20/2015, Expired Date:11/19/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-01-05 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:1/5/2017, Expired Date:1/5/2019 12:00:00 PM, Drilling unit acres:540.342, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2017-02-10 CORRECTION TO SURFACE, TARGET AND TAKE-POINT INFORMATION. UNIT SIZE CHANGED TO 441.868 ACRES.
Reached Total Depth 2017-03-09
Completion Report Received 2017-08-14
Correction to Well 2017-10-20 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Record Last Modified 2018-02-27
Construction Permit Expires 2019-01-05

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-08-22 8567 8888 60
2017-08-22 18383 18578 9
18383 18578 9
8567 8888 60
8567 8888 60

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/02/2017 05/22/2017 8229 20,856,700.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
OILPERM A Halliburton Non-ionic Surfactant Listed Below Listed Below 0 0 0
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,

branched

127087-87-0 5 0.00001463 29
Crystalline silica, quartz 14808-60-7 100 10.4168 20,378,000.0
Hydrochloric acid 7647-01-0 15 0.01193 23329
Ammonium persulfate 7727-54-0 100 0.00168434 3295
Distillates (petroleum, hydrotreated

light) (petroleum, hydrotreated light

64742-47-8 18 0.00681457 13332
1,2,4 Trimethylbenzene 95-63-6 1 0.00000293 6
Ethoxylated alcohols Proprietary 30 0.00008636 169
Olefins Proprietary 5 0.00003455 70
Fatty acids, tall oil Proprietary 30 0.00008636 169
Reaction product of acetophenone,

formaldehyde, thiourea and oleic acid in dimethyl formamide

68527-49-1 30 0.00008636 169
Distillates (petroleum, hydrotreated light( 64742-47-8 45 0.000168442 330
Propargyl alcohol 107-19-7 10 0.00002879 57
Methanol 67-56-1 60 0.000172725 338
Ethanol 64-17-5 60 0.000175523 344
Sodium hydroxide 1310-73-2 11.25 0.000902293 1766
Poly(oxy-1,2-ethanediyl), a-tridecyl-w-hydroxy-, branched 69011-36-5 5 0.00001872 37
Naphthalene 91-20-3 5 0.00001463 29
Organic phosphate copolymer 71050-62-9 25 0.00357169 6988
Acetic acid 64-19-7 60 0.00104428 2043
Oxyalkylated phenolic resin Proprietary 30 0.000117015 230
Tetrahydro-3,5-dimethyl-2H-1,3,5-thadiazine-2-thione 533-74-4 24 0.000147615 289
Acetic anhydride 108-24-7 100 0.00174046 3405
Ammonium chloride 12125-02-9 1.5 0.000567881 1111
Dazomet 533-74-4 24 0.00499859 9779
Heavy aromatic petroleum naphtha 64742-94-5 30 0.00008776 172
FE-1A ACIDIZING COMPOSITION Halliburton Additive Listed Below Listed Below 0 0 0
Fresh Water Operator Base Fluid Water 7732-18-5 100 83.4903 163,329,000.0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.159001 311049
SAND-COMMON WHITE - 100 MESH Halliburton Proppant Listed Below Listed Below 0 0 0
HP-2814 One AquaSource Friction Reducer Listed Below Listed Below 0 0 0
MB-7532 One AquaSource Biocide Listed Below Listed Below 0 0 0
HP-2220 One AquaSource Scale Inhibitor Listed Below Listed Below 0 0 0
MB-7530 One AquaSource Biocide Listed Below Listed Below 0 0 0
HP-2816 One AquaSource Friction Reducer Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-40/70 Halliburton Proppant Listed Below Listed Below 0 0 0
HP-9601 One AquaSource Additive Listed Below Listed Below 0 0 0
Produced Water Operator Base Fluid Water 7732-18-5 100 5.85588 11,455,600.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-05-02 H2O 15 497029 Gal 386900 Halliburton STAGE 1/63

STAGES 2-62 SEE IMAGES

2017-05-22 H2O 15 333178 Gal 340500 Halliburton STAGE 63/63

STAGES 2-62 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 ECLIPSE RESOURCES I LP 1797966 0 194
2018 ECLIPSE RESOURCES I LP 1070483 0 358
2019 ECLIPSE RESOURCES I LP 197417 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 ECLIPSE RESOURCES I LP Brine 55768 194
2018 ECLIPSE RESOURCES I LP Brine 22637 358
2019 ECLIPSE RESOURCES I LP Brine 3764 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1526349153 2017-1-21 0:00: CS No Violations 4.00
-1916482828 2017-4-25 0:00: PL No Violations 1.00
0712585641 2017-02-27 Drill / Deepen / Reopen No Violations During my inspection the H&P Drilling Rig 531 was drilling the 8.75 inch diameter borehole at a depth of 11,445 feet.
1484923044 2017-01-20 Drill / Deepen / Reopen No Violations Precision Drilling equipment was on location with two rotary auger rigs, one is drilling the 6H and the other is drilling the 8H. During my inspection Precision was drilling the 30 inch conductor hole at a depth of 71 feet. The proposed depth of the hole is 120 feet. According to Precision personnel the casing will be ran today 1/20/17 and cemented tomorrow 1/21/17.
1486743965 2017-02-10 Casing String Witnessed No Violations The purpose of my inspection today is to witness the cementing of the surface casing. Halliburton was on location to cement 1750 feet of the 13.375 inch diameter surface casing within a 17.5 inch diameter borehole. A pre-job safety meeting was held with all personnel on location. Haliburton pumped 300 barrels of fresh water, 25 barrels of gel spacer, 10 barrels water, and 315 barrels of cement at 15.8 pound per gallon. Top plug was dropped and displaced with 262 barrels of water. 60 barrels of cement returns were witnessed in the cellar.
1503329967 2017-08-21 Production Wells No Violations The purpose of my inspection was a status check on a production well. During my inspection the well was equipped with a workover hand wheel gate valve at the base of a production tree style wellhead with valves in the open position. Pressure monitoring was present on the tubing, casing, and the annulus. The production equipment consisted of six 400 barrel tanks, triethylene glycol dehydration unit, three sand traps, three gas production units, and one gas combustor. Acadian Contractors were on location working on production equipment. Deep Well Services and ST&E were loading produced fluids from tank battery.
1526349153 2017-01-21 Casing String Witnessed No Violations The purpose of my inspection today is to witness the 24 inch diameter conductor being cemented into a 30 inch diameter hole that is 120 feet in depth. Water was encountered at 35 feet during the drilling process. Stingray Cementing, Precision Rathole, Petta, and Eclipse are all on location. A pre-job safety meeting was held with all personnel on location. Stingray pumped to break circulation then 15 barrels of gel spacer, 10 barrels of fresh water, 62.5 barrels of cement weighing 15.6 pounds per gallon, and 58 barrels of displacement. 19 barrels of cement returns were established.
1895589889 2017-02-02 Drill / Deepen / Reopen No Violations During my inspection HP Drilling Rig 531 was rigging up on location. I spoke with Eclipse Company man to discuss a timeline for spudding. He believes to start the surface borehole in seven days.
1916482828 2017-04-25 Preliminary Restoration No Violations The purpose of my inspection was a status check on a preliminary restoration. During my inspection Halliburton was setting up on location to preform completion operations. There were no violations present and location has met 1509.072 A requirements.
712585641 2017-2-27 0:00: DD No Violations 1.00

For data sources see[10]

References