34-121-24609

Well Details

Well ID: 34-121-24609
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Beaver Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001402
Farm/Lease Name: SLASH UNIT
License Status: Producing
License Date: 2016-09-27
Spud Date: 2016-09-08
Spud Drilling Contractor: FRONTIER DRILLING
Final Drill Date: 2016-12-01
Well Total Depth: 19670.00 ft
Configuration: Horizontal
Latitude: 39.890000
Longitude: -81.270000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-08-26 Proposed Formations:POINT PLEASANT, Issued Date:8/26/2016, Expired Date:8/26/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2016-09-27 Proposed Formations:POINT PLEASANT, Issued Date:9/27/2016, Expired Date:9/27/2018 12:00:00 PM, Drilling unit acres:393.253, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2016-12-01
Correction to Well 2017-03-03 UPDATE TAKEPOINT/TARGET/ACREAGE PER AS-DRILLED PLAT RCVD 2/13/17-ALE
Completion Report Received 2017-07-20
Record Last Modified 2018-02-27
Construction Permit Expires 2018-09-27

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-08-03 8439 8606 36
2017-08-03 19403 19568 36
19403 19568 36
8439 8606 36
8439 8606 36

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/29/2017 05/22/2017 8402 19,905,100.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Antero Resources Carrier/Base Fluid Water 7732-18-5 100 86.3704 166,008,000.0
WFRA-500 U.S. Well Services, LLC Friction Reducer 2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.02713 52154.2
Hydrated light distillate (petroleum) 64742-47-8 30 0.02184 41984.1
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 13.242 25,451,900.0
SI-1200s U.S. Well Services, LLC Scale Inhibitor Alkyl Phosphonic Acid Proprietary 5 0.00062 1183.03
Ammonia 7664-41-7 0.5 0.00009000 181.003
AI-303 U.S. Well Services, LLC Acid Corrosion Inhibitors Formic acid 64-18-6 20 0.00002000 45.036
Ethylene glycol 107-21-1 40 0.00007000 128.803
Cinnamaldehyde 104-55-2 20 0.00002000 46.5672
Acetophenone,thiourea,formaldehyde polymer 68527-49-1 5 0.00001000 11.259
Butyl cellosolve 111-76-2 20 0.00002000 40.5774
Polyether 60828-78-6 10 0.00001000 22.518
AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00156 2996
HCL Acid (12.6%-17.5%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 17.5 0.04757 91423.1
Water 7732-18-5 87.4 0.20458 393221
LGC-15 U.S. Well Services, LLC Gelling Agents Suspending agent (solid) 14808-60-7 3 0.00549 10544.3
Petroleum Distillates 64742-47-8 60 0.03397 65293.4
Guar Gum 9000-30-0 50 0.03587 68943.4
Surfactant 68439-51-0 3 0.00215 4136.6
Bioclear 2000 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.00416 8004.83
Deionized Water 7732-18-5 28 0.00238 4572.32

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-04-29 H2O 7 10775 Bbl 499460 US Well Services Inc STAGE 1/52

STAGES 2-51 SEE IMAGES

2017-05-22 H2O 7 8996 Bbl 474640 US Well Services Inc STAGE 52/52

STAGES 2-51 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 ANTERO RESOURCES CORPORATION 1655397 8444 184
2018 ANTERO RESOURCES CORPORATION 3411506 3680 363
2019 ANTERO RESOURCES CORPORATION 461368 353 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 ANTERO RESOURCES CORPORATION Brine 23726 184
2018 ANTERO RESOURCES CORPORATION Brine 24454 363
2019 ANTERO RESOURCES CORPORATION Brine 3545 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1217819069 2017-7-11 0:00: CT No Violations 0.50
-1293588227 2018-9-18 0:00: PW No Violations 0.20
-1776692561 2018-1-4 0:00:0 PW No Violations 0.50
-1994937414 2017-6-3 0:00:0 CT No Violations 0.20
0194749785 2017-06-03 Completion Testing No Violations Status check inspection found the well stimulation process complete and the well shut in and awaiting the final completion process to be conducted by a service rig at a later date. All other completion phases have been stopped on the well pad.
0580635228 2017-10-11 Production Wells No Violations The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead. Production valves were in the open position. The production equipment consisted of twelve 400 barrel tanks within steel line containment, six sand traps, and six gas production units. The sand traps were flowing back into a 400 barrel gas buster tank. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Two Myers trucks were hauling produced fluids from the tank battery during inspection.
1110420821 2017-08-31 Production Wells No Violations The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead. Production valves were in the open position. The production equipment consisted of twelve 400 barrel tanks within steel line containment, six sand traps, and six gas production units. The sand traps were flowing back into a 400 barrel gas buster tank. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Two Myers trucks were hauling produced fluids from the tank battery and one Antero Company man was on location.
1217819069 2017-07-11 Completion Testing No Violations The purpose of my inspection was a status check on completion operations. During my inspection the well was shut in and equipped with a production tree style wellhead. Multiple contractors are on location installing production lines, fittings, and valves to the wellhead.
1293588227 2018-09-18 Production Wells No Violations The Wehr pad has a total of 7 wells, 6 production wells, and 1 well that has not been completed. The purpose of my inspection was a status check. The well was equipped with a production tree style wellhead. Production valves were in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of twelve 400-barrel tanks, six sand traps, and six gas production units. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Myers Trucking was hauling produced fluids from the tank battery.
1301653415 2016-11-23 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Frontier Drilling Rig #32 was drilling ahead with an 8.75 inch diameter bit at 8319 feet on 11.0 pound per gallon (ppg) mud simulating 11.6 ppg. Frontier Drilling Rig #32 is planning on landing the curve at 8675 feet with a projected total depth of 19500 feet. I completed walk around with Antero Consultant Brandon Jeffcoat revealing proper containment was in place and the 5.5 inch production casing was being offloaded.
1473691086 2016-09-08 Casing String Witnessed No Violations I arrived on location to witness Express Energy Services set conductor casing on the SLASH UNIT 2H. Prior to my arrival Inspector Conrad had approved them to set the conductor to 80 feet. We set the conductor using 257 sacks of class A cement with 2% NaCl and about a half a pound of flake. The weight of the cement was 15.6 pounds and had a 1.18 yield with a 32.19 mix. We used a total of 43.35 barrels of fluid for displacement. When we finished setting the casing we had a 10 foot shoe. After we had finished setting the conductor we had about 15 barrels of cement come back to surface and 55 barrels of water come to surface giving us a total of 70 barrels total to surface.
1479248331 2016-11-15 Casing String Witnessed No Violations On the day of my inspection I witnessed that Frontier Drilling Rig #32 had drilled a 17.5 inch diameter hole to the depth of 1049 feet. Wyoming Casing Crew ran 1039 feet of 13.375 inch 54.5 pound per foot J-55 casing. Frontier Drilling Rig #32 had to wash down the last 2 joints of casing. C & J Energy Services was on site and gained circulation with 231 barrels of fresh water, pumped 25 barrels of gel, 10 barrels of fresh water and cemented casing with 980 sacks of Class A cement weighing 15.6 pounds per gallon and a yield of 1.19 cubic foot per sack cement. Cement additives included 2% calcium chloride and .25 pound per sack of cello-<31 parts per million, pH 7 and 60 degrees.
1480254462 2016-11-27 Drill / Deepen / Reopen No Violations I received a call on 11/26/16 at 2235 from Antero Consultant Chad Francois stating that at 2035 while tripping back in the wellbore they experienced a kick and drilling mud made it to their flare stack resulting less than a barrel release and that crews were in place cleaning up. Upon arrival on 11/27/16 at 0915 I met with Consultant Brandon Jeffcoat who stated that they had tripped out the wellbore to repair their directional tool. They were down approximately 18 hours for repairs and they experienced the kick with 8000 units of gas forcing diesel based drilling mud past their separator into the flare stack. They were at 13600 feet reaming the wellbore down to 14337 feet with 11.1 pounds per gallon mud, simulating 12.4 pounds per gallon. The flare stack is on containment with a calculated 11.9 gallons inside, 1.8 gallons surrounding the stack and .3 gallons outside the berm. Inspection revealed they were currently drilling on 11.3 pounds per gallon mud, simulating 12.0 pounds per gallon at depth of 15702 feet with a planned total depth of 19566 feet. Minimal drilling mud residue was found near the flare stack. Antero will complete the clean-up today with additional scraping around the flare stack and micro-blaze being applied in the general area.
1488837393 2017-03-06 Preliminary Restoration No Violations Preliminary Restoration status check inspection accompanied by ODNR County Inspector Austin Gutridge. The area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is stoned and in good repair. Signage is posted at the well pad entrance. Halliburton crews are on site preparing to begin the well stimulation 5.5 diameter production casing toe preparations.
1776692561 2018-01-04 Production Wells No Violations The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead. Production valves were in the open position. The production equipment consisted of twelve 400 barrel tanks within steel line containment, six sand traps, and six gas production units. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Three Antero workers were maintenance production equipment and Myers Trucking were hauling produced fluids from the tank battery.
1807450280 2019-12-24 0:00 PW No Violations 1.00
194749785 2017-6-3 0:00:0 CT No Violations 0.50
1994937414 2017-06-03 Completion Testing No Violations All stimulation operations are complete on the said well.
580635228 2017-10-11 0:00 PW No Violations 0.50
952648265 2020-10-19 0:00 PW No Violations 0.20

For data sources see[10]