Well ID: 34-121-24617 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.91,"lon":-81.37,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Wayne Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001429 | |
Farm/Lease Name: WALLEYE UNIT | |
License Status: Producing | |
License Date: 2017-04-03 | |
Spud Date: 2017-04-19 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2017-08-15 | |
Well Total Depth: 25226.00 ft | |
Configuration: Horizontal | |
Latitude: 39.910000 | |
Longitude: -81.370000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-01-17 | Proposed Formations:POINT PLEASANT, Issued Date:1/17/2017, Expired Date:1/17/2019 12:00:00 PM, Drilling unit acres:996.253, Proposed Well Type:OG, Proposed Well Class:EOUT |
APP | 2017-04-03 | Proposed Formations:POINT PLEASANT, Issued Date:4/3/2017, Expired Date:4/3/2019 12:00:00 PM, Drilling unit acres:849.964, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-08-15 | |
Correction to Well | 2017-10-20 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2018-06-14 | |
Construction Permit Expires | 2019-04-03 | |
Record Last Modified | 2019-06-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-06-20 | 7798 | 7969 | 5 |
2018-06-20 | 25017 | 25121 | 5 |
25017 | 25121 | 5 | |
7798 | 7969 | 5 | |
7798 | 7969 | 5 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-02-05 | H2O | 15 | 6304 Bbl | 255358 | US Well Services Inc | STAGE 1/86
STAGES 2-85 SEE IMAGES |
2018-03-08 | H2O | 15 | 6600 Bbl | 425326 | US Well Services Inc | STAGE 86/86
STAGES 2-85 SEE IMAGES |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ANTERO RESOURCES CORPORATION | 2345507 | 113632 | 245 |
2019 | ANTERO RESOURCES CORPORATION | 810161 | 13968 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ANTERO RESOURCES CORPORATION | Brine | 31533 | 245 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 7828 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1185190685 | 2020-3-12 0:00: | PW | No Violations | 0.50 |
-1317150089 | 2017-4-20 0:00: | CS | No Violations | 1.50 |
-1352393662 | 2019-9-13 0:00: | PW | No Violations | 0.50 |
-1849945237 | 2017-5-23 0:00: | CS | No Violations | 3.00 |
-360334688 | 2017-8-7 0:00:0 | DD | No Violations | 3.00 |
-665100598 | 2017-10-19 0:00 | PL | No Violations | 0.50 |
-696980628 | 2017-12-11 0:00 | CT | No Violations | 0.50 |
-797263709 | 2018-5-23 0:00: | PW | No Violations | 0.20 |
0360334688 | 2017-08-07 | Drill / Deepen / Reopen | No Violations | The purpose of my inspection was a status check on drilling operations. During my inspection H P Drilling Rig 519 was preparing to drill out the shoe of the 9.625 inch diameter intermediate casing and drill the 8.5 inch diameter borehole in the curved section. The fresh water that was used in drilling of the vertical section borehole was being removed from hole and the rig was switching over to the oil base drilling mud to use to drill the curved section. |
0665100598 | 2017-10-19 | Preliminary Restoration | No Violations | The purpose of my inspection was a status check on a preliminary restoration. The pad is named Andes and it consists of 5 wells. During my inspection the lease road was paved with an asphalt surface and the well pad had a gravel surface surrounded by a berm. There were not any erosion issues within the wellsite boundary. Contactors were on location setting up the production equipment. Location has met Preliminary Restoration Requirements listed within 1509.072 (A). |
0696980628 | 2017-12-11 | Completion Testing | No Violations | The purpose of my inspection was a status check on hydraulic stimulation operations. During my inspection I witnessed US Well Services setting up on location. The well was equipped with a frac stack and goat head flange style wellhead. I received an email from the Antero stating that they will be finishing rigging up this week. |
0797263709 | 2018-05-23 | Production Wells | No Violations | Status check inspection found a total of 5 wells on the well pad. Each well has had the drilling and completion process complete and is in the initial production stages. The wells are being produced through choke manifolds and sand traps with a 3rd party flow back contractor on site monitoring the initial production process. All well bore annulis were monitored through the completion stages and the wells do have flow lines valves and monitoring points on the 13.375 and 9.625 well head sections. There is a total of 5 glycol heaters on site. Also present on the East side of the well pad is a production fluid tank farm consisting of a total of 14 steel tanks of 400 barrels fluid capacity each, the tanks are situated inside a polymer lined steel containment dike area with the well ad perimeter berm serving as the primary containment with the perimeter drain valves closed. Multiple tank trucks were on site hauling both production fluid and water. |
1317150089 | 2017-04-20 | Casing String Witnessed | No Violations | The purpose of my inspection was to witness 100 feet of the 26 inch diameter conductor being cemented in a 30 inch diameter hole that is 100 feet in depth. Express Energy Services drilled the conductor with a rotary rig and auger bit. No water was encountered during the drilling process. During my inspection Express Energy Services was on location to complete the cement operations. Job calculations were discussed with Express and Antero Company Man. A pre job safety meeting was held with all personnel on location. I witnessed Express pump fresh water and gel ahead of 330 sacks of class A cement with 2% gel, displaced with 55.74 barrels of fresh water, and cement returns were established. The cellar floor was cemented making the depth of the cellar 6 feet. |
1495912540 | 2017-05-23 | Casing String Witnessed | No Violations | The purpose of my inspection today was to witness the cementing of the Surface casing. Schlumberger was on location to cement 394 feet of the 18.625 inch diameter casing within a 24 inch diameter borehole that was 404 feet in depth. After witnessing the last joint of the 18.625 inch diameter casing land a pre-job safety meeting was held with all personnel on location. Schlumberger pumped 225 barrels of fresh water to break circulation, 30 barrels of gel spacer, 10 barrels water, and 130 barrels of cement at 15.6 pound per gallon. Cement sample was pulled and weighed in pressurized scales confirming a weight of 15.6 pound per gallon. Top plug was dropped and displaced with 110.4 barrels of water. An estimated 40 barrel of cement returns were witnessed in the half rounds. The plug was bumped and held for 15 minutes and the floats held. |
1849945237 | 2017-05-23 | Casing String Witnessed | No Violations | On site inspection to witness the surface casing installation. H&P Drilling rig 519 is on location and has drilled a 24 diameter surface borehole to a measured depth of 403 measured from a rig kelly bushing of 30. The rig then installed 393 of 18.625 diameter J-55 grade 87.5 pound per foot Buttress thread casing with a casing guide shoe ran on bottom and float collar installed in the string at a measured depth of 350.6, 4 casing centralizers were installed on the exterior of the string to provide casing stand off from the well bore. Schlumberger Cement Service is preparing to cement the casing using a proposed 130 barrel cement mix consisting of 610 sacks of class A cement. |
376107798 | 2020-2-14 0:00: | PW | No Violations | 0.50 |
76291278 | 2020-3-12 0:00: | PW | No Violations | 1.00 |