Well ID: 34-121-24629 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.87,"lon":-81.33,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Beaver Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001276 | |
Farm/Lease Name: HANNAH UNIT | |
License Status: Producing | |
License Date: 2017-09-11 | |
Spud Date: 2017-09-13 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2017-12-29 | |
Well Total Depth: 19808.00 ft | |
Configuration: Horizontal | |
Latitude: 39.870000 | |
Longitude: -81.330000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-07-31 | Proposed Formations:POINT PLEASANT, Issued Date:7/31/2017, Expired Date:7/31/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-09-11 | Proposed Formations:POINT PLEASANT, Issued Date:9/11/2017, Expired Date:9/11/2019 12:00:00 PM, Drilling unit acres:685.745, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-12-29 | |
Completion Report Received | 2018-10-04 | |
Record Last Modified | 2018-10-20 | |
Construction Permit Expires | 2019-09-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-10-19 | 8099 | 8267 | 0 |
2018-10-19 | 19641 | 19697 | 0 |
19641 | 19697 | 0 | |
8099 | 8267 | 0 | |
8099 | 8267 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 04/10/2018 | 05/07/2018 | 8049 | 18,437,000.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Bioclear 2000 | U.S. Well Services, LLC | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.003774 | 6729.29 |
Deionized Water | 7732-18-5 | 28 | 0.002156 | 3843.74 | ||||
LGC-15 | U.S. Well Services, LLC | Gelling Agents | Guar Gum | 9000-30-0 | 50 | 0.04818 | 85897.4 | |
Petroleum Distillates | 64742-47-8 | 60 | 0.045629 | 81349.9 | ||||
Suspending agent (solid) | 14808-60-7 | 3 | 0.007369 | 13137.3 | ||||
Surfactant | 68439-51-0 | 3 | 0.002891 | 5153.84 | ||||
SI-1200 | U.S. Well Services, LLC | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 40 | 0.002569 | 4579.66 | |
Proprietary Scale Inhibitor | Proprietary | 10 | 0.000687 | 1224.98 | ||||
WFRA-405 | U.S. Well Services, LLC | Friction Reducer | Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.018976 | 33831 | |
2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.023572 | 42026.1 | ||||
Water | Antero Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.2466 | 153,764,000.0 | |
AI-303 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Butyl cellosolve | 111-76-2 | 20 | 0.00001500 | 26.0297 | |
Acetophenone,thiourea,formaldehyde polymer | 68527-49-1 | 5 | 0.00000400 | 7.22244 | ||||
Polyether | 60828-78-6 | 10 | 0.00000800 | 14.4449 | ||||
Ethylene glycol | 107-21-1 | 40 | 0.00004600 | 82.6247 | ||||
Formic acid | 64-18-6 | 20 | 0.00001600 | 28.8898 | ||||
Cinnamaldehyde | 104-55-2 | 20 | 0.00001700 | 29.872 | ||||
AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.001898 | 3383 | |
SI-1200s | U.S. Well Services, LLC | Scale Inhibitor | Proprietary Scale Inhibitor | Proprietary | 10 | 0.000802 | 1429.39 | |
HCL Acid (12.6%-17.5%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 17.5 | 0.032762 | 58409.2 | |
Water | 7732-18-5 | 87.4 | 0.140912 | 251225 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 13.4211 | 23,927,700.0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-04-10 | H2O | 15 | 4376 Bbl | 154960 | US Well Services Inc | STAGE 1/59
STAGES 2-58 SEE IMAGES |
2018-05-07 | H2O | 15 | 6444 Bbl | 417880 | US Well Services Inc | STAGE 59/59
STAGES 2-58 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ANTERO RESOURCES CORPORATION | 1611052 | 24671 | 184 |
2019 | ANTERO RESOURCES CORPORATION | 845386 | 7947 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ANTERO RESOURCES CORPORATION | Brine | 18089 | 184 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 7660 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1096274418 | 2017-9-25 0:00: | DD | No Violations | 0.50 |
-1139584598 | 2018-9-18 0:00: | PW | No Violations | 0.10 |
-1161377193 | 2017-10-25 0:00 | CS | No Violations | 7.00 |
-1587392124 | 2019-8-20 0:00: | PW | No Violations | 0.50 |
-1824609435 | 2018-2-22 0:00: | PL | No Violations | 0.50 |
-745862780 | 2020-2-10 0:00: | PW | No Violations | |
1096274418 | 2017-09-25 | Drill / Deepen / Reopen | No Violations | My inspection today found a 100 foot deep 26 inch diameter conductor cemented into a 32 inch diameter borehole. Containment was laid on the pad and sound barriers surrounded the pad. HP Drilling Rig 519 is scheduled to arrive on the pad in October. |
1139584598 | 2018-09-18 | Production Wells | No Violations | The Troyer Pad has 6 wells. The well was equipped with a production tree style wellhead. The wells on the pad were in the process of flowing back through Enercorp Sand solutions. The production equipment consisted of six indirect line heaters, six sand traps, six gas production units, a gas buster, fourteen 400-barrel tanks, three vapor recovery towers, and four combustors. Teksolv was on location monitoring gas metering stations and Antero well tenders were monitoring flowback. |
1161377193 | 2017-10-25 | Casing String Witnessed | No Violations | The purpose of my inspection today was to witness the cementing of the Surface casing. Schlumberger was on location to cement 397 feet of the 18.625 inch diameter casing within a 24 inch diameter borehole. A pre-job safety meeting was held with all personnel on location. Schlumberger pumped 215 barrels of fresh water to load the hole, 30 barrels of gel spacer, 10 barrels water, and 130 barrels of cement at 15.6 pound per gallon. Cement sample was pulled and weighed in pressurized scales and the results were 15.2 pounds per gallon. I witnessed Schlumberger bump the density up to 15.6 pounds per gallon on the pump truck. The plug was dropped and displaced with 110.4 barrels of water. Gel spacer circulated to surface 120 barrels into pumping cement. Cement circulated to surface 70 barrels into displacement. The plug was bumped and held for 15 minutes and the floats held. |
1824609435 | 2018-02-22 | Preliminary Restoration | No Violations | The purpose of my inspection was a status check on a preliminary restoration. During my inspection 6 wells had been drilled to total depth and are awaiting completion. The drilling rig has moved off of location. The area affected by pad construction had been remediated. Location has met 1509.072 (A) requirements. |