If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24631 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.87,"lon":-81.33,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Beaver Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001276 | |
Farm/Lease Name: MCVICKERS UNIT | |
License Status: Producing | |
License Date: 2017-09-06 | |
Spud Date: 2017-09-15 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2018-01-22 | |
Well Total Depth: 17600.00 ft | |
Configuration: Horizontal | |
Latitude: 39.870000 | |
Longitude: -81.330000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-07-31 | Proposed Formations:POINT PLEASANT, Issued Date:7/31/2017, Expired Date:7/31/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-09-06 | Proposed Formations:POINT PLEASANT, Issued Date:9/6/2017, Expired Date:9/6/2019 12:00:00 PM, Drilling unit acres:671.01, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-01-22 | |
Completion Report Received | 2018-10-04 | |
Record Last Modified | 2019-05-23 | |
Construction Permit Expires | 2019-09-06 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-10-19 | 8173 | 8343 | 0 |
2018-10-19 | 17429 | 17483 | 0 |
17429 | 17483 | 0 | |
8173 | 8343 | 0 | |
8173 | 8343 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/16/2018 | 04/08/2018 | 8034 | 14,812,800.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Antero Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.2389 | 123,539,000.0 |
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 13.4065 | 19,205,000.0 | |
AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.001754 | 2513 | |
WFRA-405 | U.S. Well Services, LLC | Friction Reducer | Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.01974 | 28278.1 | |
2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.024522 | 35128.1 | ||||
Bioclear 2000 | U.S. Well Services, LLC | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.004195 | 6009.75 | |
Deionized Water | 7732-18-5 | 28 | 0.002396 | 3432.74 | ||||
AI-303 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Acetophenone,thiourea,formaldehyde polymer | 68527-49-1 | 5 | 0.00000400 | 6.18828 | |
Cinnamaldehyde | 104-55-2 | 20 | 0.00001800 | 25.5947 | ||||
Butyl cellosolve | 111-76-2 | 20 | 0.00001600 | 22.3026 | ||||
Ethylene glycol | 107-21-1 | 40 | 0.00004900 | 70.7939 | ||||
Formic acid | 64-18-6 | 20 | 0.00001700 | 24.7531 | ||||
Polyether | 60828-78-6 | 10 | 0.00000900 | 12.3766 | ||||
SI-1200 | U.S. Well Services, LLC | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 40 | 0.006823 | 9774.71 | |
Proprietary Scale Inhibitor | Proprietary | 10 | 0.001825 | 2614.56 | ||||
HCL Acid (12.6%-17.5%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 17.5 | 0.034865 | 49944.1 | |
Water | 7732-18-5 | 87.4 | 0.149956 | 214815 | ||||
LGC-15 | U.S. Well Services, LLC | Gelling Agents | Petroleum Distillates | 64742-47-8 | 60 | 0.047551 | 68117.2 | |
Suspending agent (solid) | 14808-60-7 | 3 | 0.007679 | 11000.3 | ||||
Guar Gum | 9000-30-0 | 50 | 0.050209 | 71925 | ||||
Surfactant | 68439-51-0 | 3 | 0.003013 | 4315.5 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-03-16 | H2O | 15 | 4423 Bbl | 166700 | US Well Services Inc | STAGE 1/47
STAGES 2-46 SEE IMAGES |
2018-04-08 | H2O | 15 | 6464 Bbl | 416100 | US Well Services Inc | STAGE 47/47
STAGES 2-46 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ANTERO RESOURCES CORPORATION | 1431698 | 20677 | 184 |
2019 | ANTERO RESOURCES CORPORATION | 737230 | 6401 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ANTERO RESOURCES CORPORATION | Brine | 10487 | 184 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 6235 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1390462823 | 2019-8-20 0:00: | PW | No Violations | 0.50 |
-368272558 | 2020-2-10 0:00: | PW | No Violations | |
0269105767 | 2018-09-18 | Production Wells | No Violations | The Troyer Pad has 6 wells. The well was equipped with a production tree style wellhead. The wells on the pad were in the process of flowing back through Enercorp Sand solutions. The production equipment consisted of six indirect line heaters, six sand traps, six gas production units, a gas buster, fourteen 400-barrel tanks, three vapor recovery towers, and four combustors. Teksolv was on location monitoring gas metering stations and Antero was monitoring flowback. |
0631011896 | 2018-01-24 | Casing String Witnessed | No Violations | During my inspection HP Drilling Rig 519 was circulating the 5.5 inch diameter production casing in preparation for a cement job. The 5.5 inch diameter production casing was landed at 17583 feet in depth in the lateral. Schlumberger Cementing was rigging up on location. Job calculations were discussed with Antero Company Man and Schlumberger. Schlumberger conditioned the wellbore, pumped 551 barrels of cement at 15.2 pounds per gallon with a yield of 1.6, and displaced with 371 barrels. Partial job witnessed. |
0729889516 | 2017-09-25 | Drill / Deepen / Reopen | No Violations | My inspection today found a 100 foot deep 26 inch diameter conductor cemented into a 32 inch diameter borehole. Containment was laid on the pad and sound barriers surrounded the pad. HP Drilling Rig 519 is scheduled to arrive on the pad in October. |
1242133531 | 2018-02-22 | Preliminary Restoration | No Violations | The purpose of my inspection was a status check on a preliminary restoration. During my inspection 6 wells had been drilled to total depth and are awaiting completion. The drilling rig has moved off of location. The area affected by pad construction had been remediated. Location has met 1509.072 (A) requirements. |
1510679869 | 2017-11-13 | Casing String Witnessed | No Violations | The purpose of my inspection today was to witness the cementing of the Surface casing. Schlumberger was on location to cement 400 feet of the 18.625 inch diameter casing within a 24 inch diameter borehole. A pre-job safety meeting was held with all personnel on location. Schlumberger pumped 215 barrels of fresh water to load the hole, 30 barrels of gel spacer, 10 barrels water, and 130 barrels of cement at 15.6 pound per gallon. Cement sample was pulled and weighed in pressurized scales and the results were 15.6 pounds per gallon. The plug was dropped and displaced with 113 barrels of water. Cement circulated to surface 90 barrels into displacement. The plug was bumped and held for 15 minutes and the floats held. .5 barrels were bled back to the pump truck. |
1631521135 | 2017-11-14 | Drill / Deepen / Reopen | No Violations | During my inspection H&P Drilling Rig 519 had the 17.5 inch diameter intermediate number one borehole to a depth of 922 feet. At 922 feet the 17.5 inch diameter hammer bit failed and a 10 inch by 16 inch piece of the hammer bit broke off within the borehole. While utilizing a magnetic fishing tool they attempted to recover the broken piece of the bit but all attempts failed. Schlumberger Cementing arrived on location and set a cement plug from 922 feet to 322 feet through the drill pipe. The plug weighed 16.6 pounds per gallon, consisted of both class A and class D cement, and was displaced with 9.4 barrels of fresh water. Antero Company Man stated that they are going to wait the appropriate amount of time for the cement to cure and then kick off and go around the plug with a new 17.5 inch diameter hammer bit. |
269105767 | 2018-9-18 0:00: | PW | No Violations | 0.10 |
631011896 | 2018-1-24 0:00: | CS | No Violations | 5.00 |
729889516 | 2017-9-25 0:00: | DD | No Violations | 0.50 |
For data sources see[10]