Well Details

Well ID: 34-127-20806
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Country: United States
State: Ohio
County: Perry
Municipality: Reading Township
Operator Name: ELLEN P SHARP LLC
Well Pad ID:
Farm/Lease Name: CAITO-WHITE
License Status: Final Restoration
License Date: 2013-08-16
Spud Date: 1985-09-01
Spud Drilling Contractor: SNIDER BROS. DRLG
Final Drill Date: 1985-10-07
Well Total Depth: 3125.00 ft
Configuration: Vertical
Latitude: 39.820000
Longitude: -82.270000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1985-01-15 Issued Date 12/31/84 Expired Date 6/29/85 Acres 0020000 Tool Type CT Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000
CO 1985-07-25 458 SHARP GEORGE W GeoDate 7/25/85
Oil and Gas 1985-07-25 Issued Date 7/25/85 Expired Date 7/25/86 Acres 0020000 Tool Type CT Proposed Formation CLINTON Proposed Depth 03125 Proposed Drill Depth 03125
Original Spud 1985-09-02 REOPEN 12-30-84, R.I./RO 7-27-85
Completed 1985-10-07 REOPEN 12-30-84, R.I./RO 7-27-85
Reached Total Depth 1985-10-07 REOPEN 12-30-84, R.I./RO 7-27-85
CO 1985-10-16 458 SHARP GEORGE W GeoDate 1/15/85
Completion Report Received 1986-01-01 REOPEN 12-30-84, R.I./RO 7-27-85
APP 2013-08-16 Proposed Formations:CLINTON, Issued Date:8/16/2013, Expired Date:8/16/2015 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:HAD, Proposed Well Class:
Plugged/Abandoned 2014-06-12 REOPEN 12-30-84, R.I./RO 7-27-85
Construction Permit Expires 2015-08-16 REOPEN 12-30-84, R.I./RO 7-27-85
Record Last Modified 2017-02-15 REOPEN 12-30-84, R.I./RO 7-27-85

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 3089 3119 0
3089 3119 0
3089 3119 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 2100 Bbl 27000 FRAC: H2O,SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 ELLEN P SHARP LLC 0.00 77.00 0
1986 ELLEN P SHARP LLC 1826.00 1413.00 365
1987 ELLEN P SHARP LLC 730.00 774.00 365
1988 ELLEN P SHARP LLC 0.00 526.00 365
1989 ELLEN P SHARP LLC 0.00 387.00 365
1992 ELLEN P SHARP LLC 0.00 154.00 365
1994 ELLEN P SHARP LLC 0.00 79.00 0
1995 ELLEN P SHARP LLC 0.00 236.00 0
1996 ELLEN P SHARP LLC 0.00 79.00 0
1997 ELLEN P SHARP LLC 0.00 148.00 0
1998 ELLEN P SHARP LLC 0.00 155.00 365
1999 ELLEN P SHARP LLC 0.00 73.00 365
2000 ELLEN P SHARP LLC 0.00 143.00 365
2001 ELLEN P SHARP LLC 0.00 141.00 365
2002 ELLEN P SHARP LLC 0.00 0.00 365
2003 ELLEN P SHARP LLC 0.00 0.00 365
2004 ELLEN P SHARP LLC 0.00 33.00 365
2005 ELLEN P SHARP LLC 0.00 0.00 365
2006 ELLEN P SHARP LLC 0.00 0.00 365
2007 ELLEN P SHARP LLC 0.00 0.00 365
2008 ELLEN P SHARP LLC 0.00 0.00 365
2009 ELLEN P SHARP LLC 0.00 0.00 365
2010 ELLEN P SHARP LLC 0.00 0.00 365
2011 ELLEN P SHARP LLC 0.00 0.00 365
2012 ELLEN P SHARP LLC 0.00 0.00 366
2013 ELLEN P SHARP LLC 0.00 0.00 365
2014 ELLEN P SHARP LLC 0.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 ELLEN P SHARP LLC Brine 76 0
1986 ELLEN P SHARP LLC Brine 0 365
1987 ELLEN P SHARP LLC Brine 0 365
1988 ELLEN P SHARP LLC Brine 0 365
1989 ELLEN P SHARP LLC Brine 35 365
1992 ELLEN P SHARP LLC Brine 0 365
1994 ELLEN P SHARP LLC Brine 0 0
1995 ELLEN P SHARP LLC Brine 140 0
1996 ELLEN P SHARP LLC Brine 0 0
1997 ELLEN P SHARP LLC Brine 0
1998 ELLEN P SHARP LLC Brine 0 365
1999 ELLEN P SHARP LLC Brine 0 365
2000 ELLEN P SHARP LLC Brine 60 365
2001 ELLEN P SHARP LLC Brine 0 365
2002 ELLEN P SHARP LLC Brine 0 365
2003 ELLEN P SHARP LLC Brine 0 365
2004 ELLEN P SHARP LLC Brine 70 365
2005 ELLEN P SHARP LLC Brine 0 365
2006 ELLEN P SHARP LLC Brine 0 365
2007 ELLEN P SHARP LLC Brine 0 365
2008 ELLEN P SHARP LLC Brine 0 365
2009 ELLEN P SHARP LLC Brine 140 365
2010 ELLEN P SHARP LLC Brine 0 365
2011 ELLEN P SHARP LLC Brine 0 365
2012 ELLEN P SHARP LLC Brine 0 366
2013 ELLEN P SHARP LLC Brine 0 365
2014 ELLEN P SHARP LLC Brine 130 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1440556201 2014-4-23 0:00: PW No Violations 1.00
-2043609187 2013-3-8 0:00:0 AM No Violations 0.50
-2125139494 2014-6-26 0:00: PB No Violations 2.50
-39028619 2014-3-13 0:00: PW No Violations 1.00
-96648831 2013-6-27 0:00: PW No Violations 1.00
0000PL7208 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0039028619 2014-03-13 Production Wells No Violations I talked with Mr. Sharp to see if he still plans on plugging this well. He let me know that he has Kenny Wright lined up to plug it. As soon as he is free he will be moving in on the well to plug it. I told him that would be fine.
0096648831 2013-06-27 Production Wells No Violations I did a follow up on this well with Sharp Ellen LLC to see what they have decided to do with this well. They informed me that they have talk with their investors and have agreed to plug the well. He told me he has already filed the paperwork for the permit to Columbus. He said the check just cleared the other day so it should be on its way.
0302019266 2014-09-15 Plug / Plug Back No Violations I returned to this well to do a final restoration on it. The production tanks and pumping unit are still on location at this time. I contacted Foutain Sharp and he told me that someone was coming to look at them this week to buy the equipment. If they do not buy the equipment he will have the stuff removed.
0693880342 2014-11-13 Final Restoration No Violations The final restoration meets 1509.072.
1134979924 2014-05-09 Production Wells No Violations I talked with Mr. Sharp today to see if he had a rig lined up yet to plug the well. He said he has talked with MFC to see if they can plug it. They said they would be able to. They are on another well right now then should be moving to this well. He was going to contact them today to make sure they still would be able to.
1149734644 2014-10-01 Plug / Plug Back No Violations I returned to this well to see if I could do the final restoration. The pumping unit and production tanks have been removed but the ladders and 4 pieces of pipe is still on location. I will contact Foutain Sharp to see when he plans on removing this stuff.
1362754444 2013-03-07 Production Wells Violations Noted Make well capable of commercial production within 120 days; or plugging is required within 150 days. Failure to comply may result in Forfeiture of Bond.
1402410590 2014-06-09 Plug / Plug Back No Violations Kenny Wright has moved his rig in on location to plug this well. They are working on pulling the rods and tubing at this time. The clay will be delivered in the morning.
1403189646 2014-06-18 Plug / Plug Back No Violations I received a phone call from Keith the pumper for Stonebridge. He was contacting me to let me know that he had a flow line bust. I went out to inspect the situation of the spill. The flow line busted approximately 100ft away from the production tank. A small hole was pierced somehow in the line. There is approximately 1 barrel of contamination or less on the ground. I told Keith to bring out some materials to soak up the contamination and remove the contaminated soil from the location. The area contaminated is approximately a 8-10ft square radius. Keith said they would get to work on it and get it cleaned up. Keith stated he would contact me after it was cleaned up for me to check it.
1404312118 2014-07-01 Plug / Plug Back No Violations I stopped by this well to check to see if the clay was still at the surface. The clay was at the top of the well still. I let the company know that they can start to reclaim the location.
1440556201 2014-04-23 Production Wells No Violations I talked with Fountain Sharp about plugging this well. He said Kenny Wright should be moving in on the well. He has had him scheduled to do it. He said he would call him to see when he would be able to move in on the well. I told him if he could not do it he would have to get someone else. I told him That Mark Hines has a rig and could plug the well. He was going to contact him.
1590881635 2013-08-29 Production Wells No Violations I received the plug permit for this well. The permit was issued 8/16/2013. I contacted the company to see when they would be planning on plugging the well. The woman I talked to was not sure and her husband was out on a service job. She was going to let him know that I called and tell him to call me.
1935138010 2014-06-02 Production Wells No Violations Kenny Wright is supposed to be moving a service rig in on this well this week to plug the well. I talked with Mr. Sharp again and he said he has been trying to get a rig but everyone has been busy. Kenny Wright contacted him back and told him he should be able to move in on the well this week.
2007980106 2014-06-11 Plug / Plug Back No Violations I was onsite to witness the plugging of this well. The rig crew finished pulling out the 4 pipe. Then we set the pre-cast plug at 1000ft. Clay was washed in the well to the bottom of the 8. The rig crew then set up to retrieve the 8. They were able to rip the 8 at 160ft. It was cemented in. We then washed in more clay up to where the pipe was ripped. The rig crew then pulled out the 8 and topped the well off with plugging clay to surface. The well will be left open to make sure the clay does not settle. It will be topped off if it does.
2043609187 2013-03-08 Administrative Inspection No Violations I talked with Mr. Sharp about this well and he is going to inform his investors. They are going to put a packer in the well or plug it.
2124630029 2014-06-10 Plug / Plug Back No Violations I was onsite today during the plugging of this well. We set the bottom plug with clay then the rig crew set up to rip the 4. They were able to get the 4 ripped at 2400ft. We pulled out 190ft of pipe so the pipe would free up. Then they set the lime plug. They washed in another 500ft of clay. The rig crew worked on pulling out the 4 when I left. We will be setting the pre-cast plug tomorrow and filling the hole to surface.
2125139494 2014-06-26 Plug / Plug Back No Violations I returned to this well today to check the status of the plugging. Fountain Sharp got more clay to top the well off. When I showed up at the well today he was there washing clay in the well. They topped the well off while I was onsite. We are going to leave the well open over the weekend and see if it settles. I will check back next week before giving them the ok to cut the pipe of and reclaim.
302019266 2014-9-15 0:00: PB No Violations 1.00
693880342 2014-11-13 0:00 FR No Violations 1.00
PL7208 PL No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1362754444 US-OH-110605 2014-06-12 Well shall be plugged
1362754444 US-OH-110606 2014-06-12 Nonproduction; well shall be plugged or placed in temporary inactive status

For data sources see[9]