If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-127-23436 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.73,"lon":-82.32,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Perry | |
Municipality: Jackson Township | |
Operator Name: DAVID R HILL INC | |
Well Pad ID: | |
Farm/Lease Name: C E FOLK | |
License Status: Final Restoration | |
License Date: 2012-09-10 | |
Spud Date: 1974-10-01 | |
Spud Drilling Contractor: | |
Final Drill Date: 1974-10-24 | |
Well Total Depth: 2890.00 ft | |
Configuration: Vertical | |
Latitude: 39.730000 | |
Longitude: -82.320000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1974-07-23 | 1056 SOUTHERN TRIANGLE OIL CO GeoDate 7/23/74 |
Original Spud | 1974-10-01 | RE-ISS. 7-24-74 |
Completed | 1974-10-24 | RE-ISS. 7-24-74 |
Reached Total Depth | 1974-10-24 | RE-ISS. 7-24-74 |
Change of Owner | 2012-08-29 | Operator changed from 1056, SOUTHERN TRIANGLE OIL CO to 490, HILL DAVID R INC |
APP | 2012-09-10 | Proposed Formations:CLINTON, Issued Date:9/10/2012, Expired Date:9/10/2014 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2013-06-26 | RE-ISS. 7-24-74 |
Record Last Modified | 2014-07-25 | RE-ISS. 7-24-74 |
Construction Permit Expires | 2014-09-10 | RE-ISS. 7-24-74 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 8000 Bbl | 0 | |||
ACID | 0 | 1000 Gal | 0 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | DAVID R HILL INC | 0.00 | 0.00 | 0 |
2004 | DAVID R HILL INC | 0.00 | 0.00 | 0 |
2005 | DAVID R HILL INC | 0.00 | 0.00 | 0 |
2006 | DAVID R HILL INC | 0.00 | 0.00 | 0 |
2007 | DAVID R HILL INC | 0.00 | 0.00 | 0 |
2008 | DAVID R HILL INC | 0.00 | 0.00 | 0 |
2009 | DAVID R HILL INC | 0.00 | 0.00 | 0 |
2010 | DAVID R HILL INC | 0.00 | 0.00 | 0 |
2011 | DAVID R HILL INC | 0.00 | 0.00 | 0 |
2012 | DAVID R HILL INC | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2003 | DAVID R HILL INC | Brine | 0 | 0 |
2004 | DAVID R HILL INC | Brine | 0 | 0 |
2005 | DAVID R HILL INC | Brine | 0 | 0 |
2006 | DAVID R HILL INC | Brine | 0 | 0 |
2007 | DAVID R HILL INC | Brine | 0 | 0 |
2008 | DAVID R HILL INC | Brine | 0 | 0 |
2009 | DAVID R HILL INC | Brine | 0 | 0 |
2010 | DAVID R HILL INC | Brine | 0 | 0 |
2011 | DAVID R HILL INC | Brine | 0 | 0 |
2012 | DAVID R HILL INC | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1065482273 | 2013-6-25 0:00: | PB | No Violations | 6.00 |
-1921023061 | 2003-10-2 0:00: | FR | No Violations | |
1023200549 | 2013-06-26 | Plug / Plug Back | No Violations | Appalachian was on location to run the bonalog down hole to see where the 4 is free at. It showed a free spot at 450ft. We then ran down to 1050ft and shot holes in the 4. The rig crew ran tubing in the well to that point and we set a 350ft plug. They pulled the tubing back out then Appalachian ran in and cut the 4 off at 450ft. The rig crew pulled out the 4 then ran tubing back in the well. They set a 450ft surface plug. The cement stayed at the top of the hole. |
1065482273 | 2013-06-25 | Plug / Plug Back | No Violations | The rig crew is back on location. They are bailing the fluid out of the hole this morning to get in more clay. We got the rest of the clay in the hole then we tried to rip the 4. We ripped it at 1203ft and it was still hung. They pulled up to 65,000lbs on it. It only moved 3 inches. I told the rig crew to shut down for the day and set up Appalachian to come tomorrow to run a bonalog to see where the pipe is free at. |
1161616266 | 2013-10-28 | Final Restoration | No Violations | The final restoration meets 1509.072. |
1372428937 | 2013-06-24 | Plug / Plug Back | No Violations | Berry Well Service was on site to plug this well. They ripped the 4 at 2314ft, 2110ft, and at 1991ft. The 4 is hung in the hole. I had the rig crew wash in another 4 ton of clay to cover the lime. The hole filled up with water so they shut down for the day and are going to bring the baylor with them tomorrow. |
1582386188 | 2013-08-27 | Plug / Plug Back | Violations Noted | The final restoration could not be completed because there is still pipe on the location. I contacted Benny and he said he was just waiting on it to get dry enough to get a skid steerer in there. The tanks have already been removed. |
1921023061 | 2003-10-02 | Final Restoration | No Violations | Final Restoration meets 1509.072(B) requirements. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1582386188 | US-OH-115481 | 2014-04-23 | Failure to proceed with due diligence until completed |
For data sources see[8]