If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-127-24253 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.77,"lon":-82.16,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Perry | |
Municipality: Clayton Township | |
Operator Name: ANDERSON BOBBY B | |
Well Pad ID: | |
Farm/Lease Name: LEWIS-PEABODY-SNYDER | |
License Status: Not Drilled | |
License Date: 1989-07-24 | |
Spud Date: 1980-04-24 | |
Spud Drilling Contractor: | |
Final Drill Date: 1980-06-17 | |
Well Total Depth: 3434.00 ft | |
Configuration: Vertical | |
Latitude: 39.770000 | |
Longitude: -82.160000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1979-12-12 | 422 ANDERSON BOBBY B GeoDate 12/12/79 |
Original Spud | 1980-04-24 | RI 12-19-79 |
Completed | 1980-06-17 | RI 12-19-79 |
Reached Total Depth | 1980-06-17 | RI 12-19-79 |
CO | 1989-07-24 | 422 ANDERSON BOBBY B GeoDate 7/24/89 |
Unknown | 1989-07-24 | Issued Date 7/24/89 Expired Date 7/24/90 Proposed Purpose OG Was Plug Supervised Who Superivsed Plug and Abandon Date |
Construction Permit Expires | 1990-07-24 | RI 12-19-79 |
Record Last Modified | 2009-12-11 | RI 12-19-79 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 0 | 0 | |
0 | 0 | ||
0 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1000 Bbl | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | OHIO L & M CO INC | 480.00 | 27.00 | 0 |
1985 | L & M PETROLEUM CO | 447.00 | 0.00 | 0 |
1986 | L & M PETROLEUM CO | 357.00 | 0.00 | 365 |
1987 | L & M PETROLEUM CO | 330.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | OHIO L & M CO INC | Brine | 0 | 0 |
1985 | L & M PETROLEUM CO | Brine | 0 | 0 |
1986 | L & M PETROLEUM CO | Brine | 0 | 365 |
1987 | L & M PETROLEUM CO | Brine | 0 | 365 |