If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-127-25787 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Country: United States | |
State: Ohio | |
County: Perry | |
Municipality: Hopewell Township | |
Operator Name: R C POLING CO INC | |
Well Pad ID: | |
Farm/Lease Name: SATTERFIELD RALPH | |
License Status: Final Restoration | |
License Date: 2013-06-21 | |
Spud Date: 1982-12-21 | |
Spud Drilling Contractor: SNIDER BROS. DRLG | |
Final Drill Date: 1983-01-16 | |
Well Total Depth: 3016.00 ft | |
Configuration: Vertical | |
Latitude: 39.830000 | |
Longitude: -82.280000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1982-11-26 | Issued Date 11/26/82 Expired Date 5/25/83 Acres 0164000 Tool Type CT Proposed Formation CLINTON Proposed Depth 03016 Proposed Drill Depth 03016 |
Original Spud | 1982-12-21 | |
Completed | 1983-01-16 | |
Reached Total Depth | 1983-01-16 | |
CO | 1983-01-29 | 286 McKEE DON DRILL CO INC GeoDate 11/26/82 |
Completion Report Received | 1983-02-04 | |
Change of Owner | 2002-11-12 | Operator changed from 286, McKEE DON DRILL CO INC to 236, POLING R C CO INC |
APP | 2013-06-21 | Proposed Formations:CLINTON, Issued Date:6/21/2013, Expired Date:6/21/2015 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:HAD, Proposed Well Class: |
Plugged/Abandoned | 2013-10-28 | |
Construction Permit Expires | 2015-06-21 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 2980 | 3011 | 0 |
2980 | 3011 | 0 | |
2980 | 3011 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1850 Bbl | 40000 | FRAC;1850BBL H2O,40M# SAND,100G ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | McKEE DON DRILL CO INC | 1637.00 | 670.00 | 0 |
1985 | McKEE DON DRILL CO INC | 1257.00 | 407.00 | 365 |
1986 | McKEE DON DRILL CO INC | 1016.00 | 290.00 | 365 |
1987 | McKEE DON DRILL CO INC | 740.00 | 227.00 | 365 |
1988 | McKEE DON DRILL CO INC | 1198.00 | 582.00 | 365 |
1990 | McKEE DON DRILL CO INC | 719.00 | 295.00 | 365 |
1991 | McKEE DON DRILL CO INC | 650.00 | 350.00 | 365 |
1992 | McKEE DON DRILL CO INC | 639.00 | 332.00 | 365 |
1993 | McKEE DON DRILL CO INC | 573.00 | 305.00 | 365 |
1994 | McKEE DON DRILL CO INC | 372.00 | 207.00 | 365 |
1995 | McKEE DON DRILL CO INC | 321.00 | 170.00 | 365 |
1997 | McKEE DON DRILL CO INC | 213.00 | 108.00 | 365 |
1998 | McKEE DON DRILL CO INC | 192.00 | 177.00 | 365 |
1999 | McKEE DON DRILL CO INC | 230.00 | 190.00 | 365 |
2000 | McKEE DON DRILL CO INC | 111.00 | 134.00 | 365 |
2001 | McKEE DON DRILL CO INC | 90.00 | 181.00 | 365 |
2002 | McKEE DON DRILL CO INC | 0.00 | 130.00 | 303 |
2003 | R C POLING CO INC | 0.00 | 478.00 | 365 |
2004 | R C POLING CO INC | 0.00 | 409.00 | 365 |
2005 | R C POLING CO INC | 0.00 | 538.00 | 365 |
2006 | R C POLING CO INC | 0.00 | 318.00 | 365 |
2007 | R C POLING CO INC | 0.00 | 81.00 | 365 |
2009 | R C POLING CO INC | 0.00 | 54.00 | 365 |
2013 | R C POLING CO INC | 0.00 | 50.00 | 365 |
2014 | R C POLING CO INC | 0.00 | 45.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | McKEE DON DRILL CO INC | Brine | 0 | 0 |
1985 | McKEE DON DRILL CO INC | Brine | 16 | 365 |
1986 | McKEE DON DRILL CO INC | Brine | 16 | 365 |
1987 | McKEE DON DRILL CO INC | Brine | 0 | 365 |
1988 | McKEE DON DRILL CO INC | Brine | 0 | 365 |
1990 | McKEE DON DRILL CO INC | Brine | 0 | 365 |
1991 | McKEE DON DRILL CO INC | Brine | 0 | 365 |
1992 | McKEE DON DRILL CO INC | Brine | 0 | 365 |
1993 | McKEE DON DRILL CO INC | Brine | 42 | 365 |
1994 | McKEE DON DRILL CO INC | Brine | 28 | 365 |
1995 | McKEE DON DRILL CO INC | Brine | 0 | 365 |
1997 | McKEE DON DRILL CO INC | Brine | 0 | 365 |
1998 | McKEE DON DRILL CO INC | Brine | 0 | 365 |
1999 | McKEE DON DRILL CO INC | Brine | 0 | 365 |
2000 | McKEE DON DRILL CO INC | Brine | 0 | 365 |
2001 | McKEE DON DRILL CO INC | Brine | 0 | 365 |
2002 | McKEE DON DRILL CO INC | Brine | 0 | 303 |
2003 | R C POLING CO INC | Brine | 345 | 365 |
2004 | R C POLING CO INC | Brine | 490 | 365 |
2005 | R C POLING CO INC | Brine | 700 | 365 |
2006 | R C POLING CO INC | Brine | 840 | 365 |
2007 | R C POLING CO INC | Brine | 25 | 365 |
2009 | R C POLING CO INC | Brine | 113 | 365 |
2013 | R C POLING CO INC | Brine | 43 | 365 |
2014 | R C POLING CO INC | Brine | 45 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1353274263 | 2013-9-17 0:00: | PB | No Violations | 5.00 |
-1408997236 | 2008-11-4 0:00: | AD | No Violations | |
-769084951 | 2013-9-23 0:00: | PB | No Violations | 3.00 |
0000PL7021 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0159461301 | 2013-10-31 | Final Restoration | No Violations | The final restoration meets 1509.072. |
0238111031 | 2013-10-30 | Plug / Plug Back | No Violations | The clay is at the surface on this plug job. I let Zack Poling know they could cut the well down and put the plate on. They are able to start reclaiming. |
0677525123 | 2013-09-16 | Plug / Plug Back | No Violations | Kenny Wright has moved rig in on location to plug well. They are pulling out rods and tubing today. |
0769084951 | 2013-09-23 | Plug / Plug Back | No Violations | Kenny Wright had his crew back on location to wash in more plugging clay for the surface plug. They washed the clay up to the surface and stopped for the day. They are going to let the plug settle and top the well off again. |
1353274263 | 2013-09-17 | Plug / Plug Back | No Violations | Kenny Wright was on location to plug well. They washed in 500ft of plugging clay for the bottom plug. The 5 was ripped at 2534ft. The rig crew then washed in another 500ft of plugging clay. They then started pulling out the rest of the 5. |
1382103623 | 2013-10-17 | Plug / Plug Back | No Violations | I stopped to check on this well. The clay was still not at the top of the hole. They are out of plugging clay at the site. I contacted Zack Poling and let him know that they would have to get more clay and top the well off. |
1408997236 | 2008-11-04 | Annular Disposal | No Violations | No violations. |
159461301 | 2013-10-31 0:00 | FR | No Violations | 1.00 |
1732097593 | 2003-01-03 | Production Wells | No Violations | |
2120393846 | 2013-09-19 | Plug / Plug Back | No Violations | Kenny Wright was on location to plug well. They finished pulling out the 5. They ran in the 7 pre-cast plug to 970ft. The rig crew washed in plugging clay up to the bottom of the 8. They were able to retrieve 114ft of the 8. They will wash in more clay to surface. |
238111031 | 2013-10-30 0:00 | PB | No Violations | 1.50 |
677525123 | 2013-9-16 0:00: | PB | No Violations | 2.00 |
PL7021 | PL | No Violations |
For data sources see[9]