X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-127-25955

Well Details

Well ID: 34-127-25955
Loading map...
Country: United States
State: Ohio
County: Perry
Municipality: Madison Township
Operator Name: GARBER URA C
Well Pad ID:
Farm/Lease Name: EMBREY UNIT
License Status: Domestic Well
License Date: 1989-04-27
Spud Date: 1983-04-23
Spud Drilling Contractor: CO TOOLS
Final Drill Date: 1983-05-27
Well Total Depth: 3251.00 ft
Configuration: Vertical
Latitude: 39.850000
Longitude: -82.210000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1983-04-22 281 McKENZIE VICTOR DRILL INC GeoDate 4/22/83
Oil and Gas 1983-04-22 Issued Date 4/22/83 Expired Date 10/19/83 Acres 0020000 Tool Type CT Proposed Formation CLINTON Proposed Depth 03251 Proposed Drill Depth 03251
Original Spud 1983-04-23
Completed 1983-05-27
Reached Total Depth 1983-05-27
Completion Report Received 1983-06-07
CO 1989-04-27 281 McKENZIE VICTOR DRILL INC GeoDate 4/27/89
Unknown 1989-04-27 Issued Date 4/27/89 Expired Date 4/27/90 Proposed Purpose OG Was Plug Supervised Who Superivsed Plug and Abandon Date
Construction Permit Expires 1990-04-27
Change of Owner 2015-12-03 Operator changed from 281, VICTOR MCKENZIE DRILL CO INC to 5384, GARBER URA C - CHANGE OF OWNER FORM 7 IN SURETY FILE DATED 1/24/1996 NEVER PROCESSED 12/3/2015 CM.
Record Last Modified 2015-12-03

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 0 0
0 0
2006-09-11 3170 3198 2
3170 3198 2
0 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 0 0 FRAC: WATER, SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 VICTOR MCKENZIE DRILLING CO I 436.00 73.00 365
1991 VICTOR MCKENZIE DRILLING CO I 0.00 0.00 180
1993 VICTOR MCKENZIE DRILLING CO I 0.00 0.00 180
1994 VICTOR MCKENZIE DRILLING CO I 0.00 0.00 180
1995 VICTOR MCKENZIE DRILLING CO I 0.00 0.00 0
1996 VICTOR MCKENZIE DRILLING CO I 0.00 33.00 180
2000 VICTOR MCKENZIE DRILLING CO I 0.00 0.00 180

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 VICTOR MCKENZIE DRILLING CO I Brine 0 365
1991 VICTOR MCKENZIE DRILLING CO I Brine 0 180
1993 VICTOR MCKENZIE DRILLING CO I Brine 0 180
1994 VICTOR MCKENZIE DRILLING CO I Brine 0 180
1995 VICTOR MCKENZIE DRILLING CO I Brine 0 0
1996 VICTOR MCKENZIE DRILLING CO I Brine 0 180
2000 VICTOR MCKENZIE DRILLING CO I Brine 0 180

For data sources see[7] [8]

References