If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-127-26124 | |
Country: United States | |
State: Ohio | |
County: Perry | |
Municipality: Pike Township | |
Operator Name: LYONS JOSEPH | |
Well Pad ID: | |
Farm/Lease Name: LINDAMOOD MULLINS | |
License Status: Domestic Well | |
License Date: 1990-04-25 | |
Spud Date: 1984-02-19 | |
Spud Drilling Contractor: HUFFMAN & BOWERS | |
Final Drill Date: 1984-04-19 | |
Well Total Depth: 3382.00 ft | |
Configuration: Vertical | |
Latitude: 39.650000 | |
Longitude: -82.210000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1983-11-10 | Issued Date 11/10/83 Expired Date 5/8/84 Acres 0040000 Tool Type CT Proposed Formation CLINTON Proposed Depth 03382 Proposed Drill Depth 03382 |
Original Spud | 1984-02-19 | |
Completed | 1984-04-19 | |
Reached Total Depth | 1984-04-19 | |
CO | 1984-05-01 | 236 POLING R C CO INC GeoDate 11/10/83 |
Completion Report Received | 1984-10-09 | |
CO | 1990-04-25 | 236 POLING R C CO INC GeoDate 4/25/90 |
Unknown | 1990-04-25 | Issued Date 4/25/90 Expired Date 4/25/91 Proposed Purpose OG Was Plug Supervised Who Superivsed Plug and Abandon Date |
Construction Permit Expires | 1991-04-25 | |
CO | 1993-06-16 | 4577 HOLYCROSS ROBERT R GeoDate 4/25/90 |
Change of Owner | 2005-04-05 | Operator changed from 4577, HOLYCROSS ROBERT R to 7822, LYONS JOSEPH |
Record Last Modified | 2010-01-27 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 0 | 0 | |
0 | 0 | ||
0 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2100 Bbl | 30000 | FRAC;H2O,SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | R C POLING CO INC | 1747.00 | 0.00 | 365 |
1985 | R C POLING CO INC | 5650.00 | 84.00 | 365 |
1986 | R C POLING CO INC | 2809.00 | 0.00 | 365 |
1987 | R C POLING CO INC | 2481.00 | 74.00 | 365 |
1988 | R C POLING CO INC | 2433.00 | 0.00 | 365 |
1989 | R C POLING CO INC | 1678.00 | 76.00 | 365 |
1990 | R C POLING CO INC | 917.00 | 0.00 | 365 |
1991 | R C POLING CO INC | 223.00 | 0.00 | 365 |
1992 | R C POLING CO INC | 95.00 | 0.00 | 365 |
1993 | R C POLING CO INC | 36.00 | 14.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | R C POLING CO INC | Brine | 0 | 365 |
1985 | R C POLING CO INC | Brine | 50 | 365 |
1986 | R C POLING CO INC | Brine | 25 | 365 |
1987 | R C POLING CO INC | Brine | 100 | 365 |
1988 | R C POLING CO INC | Brine | 110 | 365 |
1989 | R C POLING CO INC | Brine | 75 | 365 |
1990 | R C POLING CO INC | Brine | 0 | 365 |
1991 | R C POLING CO INC | Brine | 0 | 365 |
1992 | R C POLING CO INC | Brine | 0 | 365 |
1993 | R C POLING CO INC | Brine | 0 | 365 |