If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-127-27406 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.67,"lon":-82.24,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Perry | |
Municipality: Pike Township | |
Operator Name: R C POLING CO INC | |
Well Pad ID: | |
Farm/Lease Name: CINMARK | |
License Status: Producing | |
License Date: 2013-05-10 | |
Spud Date: 2013-07-24 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2013-07-28 | |
Well Total Depth: 3314.00 ft | |
Configuration: Vertical | |
Latitude: 39.670000 | |
Longitude: -82.240000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-10 | Proposed Formations:CLINTON, Issued Date:5/10/2013, Expired Date:5/10/2015 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2013-07-28 | |
Completion Report Received | 2013-11-29 | |
Construction Permit Expires | 2015-05-10 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-12-02 | 3212 | 3232 | 41 |
3212 | 3232 | 41 | |
3212 | 3232 | 41 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 7534 Gal | 11600 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | R C POLING CO INC | 0.00 | 28.00 | 33 |
2014 | R C POLING CO INC | 0.00 | 41.00 | 365 |
2015 | R C POLING CO INC | 2003.00 | 0.00 | 365 |
2016 | R C POLING CO INC | 1242.00 | 0.00 | 365 |
2017 | R C POLING CO INC | 579.00 | 0.00 | 365 |
2018 | R C POLING CO INC | 265.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | R C POLING CO INC | Brine | 88 | 33 |
2014 | R C POLING CO INC | Brine | 195 | 365 |
2015 | R C POLING CO INC | Brine | 55 | 365 |
2016 | R C POLING CO INC | Brine | 90 | 365 |
2017 | R C POLING CO INC | Brine | 0 | 365 |
2018 | R C POLING CO INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-115890375 | 2013-9-5 0:00:0 | CT | No Violations | 8.00 |
-2014829164 | 2013-7-24 0:00: | CS | No Violations | 5.00 |
-20870364 | 2013-10-9 0:00: | PL | No Violations | 1.00 |
-280187147 | 2018-9-12 0:00: | PL | No Violations | 0.50 |
-29370857 | 2013-8-27 0:00: | AM | No Violations | 0.50 |
-948061315 | 2015-10-22 0:00 | PW | No Violations | 1.00 |
0020870364 | 2013-10-09 | Preliminary Restoration | No Violations | I did the preliminary restoration on this well. The pumping unit has been set and the well is plumbed into the tank pad. There is a dike around the tank pad. The pumper was onsite during my inspection. He started the well while I was there. |
0029370857 | 2013-08-27 | Administrative Inspection | No Violations | I talked with Dick Poling to see what the status of this well is. He informed me that they will be fracking the well next week on 9/5/2013 at 8:00 A.M. |
0115890375 | 2013-09-05 | Completion Testing | No Violations | Universal was on sit to frac this well. They used 116 sacks of sand, and 179 barrels of water. Shut in pressure was 1532lbs. The well went on vacuum as soon as they started pumping on it. It broke right down. The job went good. Mr. Poling said they would start setting the tanks and getting the well plumbed in. |
0280187147 | 2018-09-12 | Preliminary Restoration | No Violations | Im on location today to do the preliminary inspection on this well today. The well is in production and everything has been reclaimed. There are no violations at this time. |
0948061315 | 2015-10-22 | Production Wells | No Violations | This well was pumping at the time of my inspection. There are no violations to report at this time. |
1374841841 | 2013-07-25 | Casing String Witnessed | No Violations | I was on site to test the water before they mixed cement to make sure it was fresh. They cemented the 8 to surface. They ran in 633ft of 8. The pipe was brand new and weighed 23lb per foot. |
1375455110 | 2013-07-28 | Casing String Witnessed | No Violations | The rig crew drilled to 3366. The 5.5 was ran to 3339ft. Formation cementing came out to well and cemented 5.5 in. They used 80 sacks of cement. We had good returns on the cement. |
2014829164 | 2013-07-24 | Casing String Witnessed | No Violations | I was on location to witness the conductor being cemented in. There was 84ft of 11 ran in the hole. The returns were good. The rig crew is going to wait 8hrs before they begin to drill again. I tested the water before they mixed the cement and it was fresh water. |
For data sources see[9]