If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-129-20251 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.6,"lon":-83.03,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Pickaway | |
| Municipality: Wayne Township | |
| Operator Name: CHUCK HENRY ENERGY LLC | |
| Well Pad ID: | |
| Farm/Lease Name: GIFFORD C & B (SWIW #10) | |
| License Status: Active Injection | |
| License Date: 2015-09-23 | |
| Spud Date: 2015-01-02 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2015-01-12 | |
| Well Total Depth: 3815.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.600000 | |
| Longitude: -83.030000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2014-12-31 | Proposed Formations:BLACK RIVER, TREMPEALEAU, ROME, Issued Date:12/31/2014, Expired Date:12/30/2016 12:00:00 PM, Drilling unit acres:163.909, Proposed Well Type:OG, Proposed Well Class:EDPW |
| Reached Total Depth | 2015-01-12 | BASED ON CHIEF'S ORDER 2016-203 AUTHORIZATION TO INJECT AS OF 5/25/2016. CHANGE STATUS TO AI ON 7/5/2016 |
| Completion Report Received | 2015-04-20 | BASED ON CHIEF'S ORDER 2016-203 AUTHORIZATION TO INJECT AS OF 5/25/2016. CHANGE STATUS TO AI ON 7/5/2016 |
| APP | 2015-09-23 | Proposed Formations:KNOX TO MT SIMON, Issued Date:9/23/2015, Expired Date:9/22/2017 12:00:00 PM, Drilling unit acres:163.909, Proposed Well Type:SWD, Proposed Well Class:SWIW |
| Last Compliance Report | 2016-02-04 | BASED ON CHIEF'S ORDER 2016-203 AUTHORIZATION TO INJECT AS OF 5/25/2016. CHANGE STATUS TO AI ON 7/5/2016 |
| Change of Owner | 2017-06-28 | Operator changed from 5755, HOCKING HILLS ENERGY WELL SERV to 9919, CHUCK HENRY ENERGY LLC |
| Record Last Modified | 2017-06-28 | BASED ON CHIEF'S ORDER 2016-203 AUTHORIZATION TO INJECT AS OF 5/25/2016. CHANGE STATUS TO AI ON 7/5/2016 |
| Construction Permit Expires | 2017-09-22 | BASED ON CHIEF'S ORDER 2016-203 AUTHORIZATION TO INJECT AS OF 5/25/2016. CHANGE STATUS TO AI ON 7/5/2016 |
For data sources see[2]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1027659682 | 2020-7-27 0:00: | SW | No Violations | 2.00 |
| -1053754982 | 2019-2-11 0:00: | SW | No Violations | |
| -1126073824 | 2016-11-30 0:00 | SW | No Violations | 2.50 |
| -1193693489 | 2017-7-26 0:00: | SW | No Violations | 2.70 |
| -1260963192 | 2018-10-17 0:00 | SW | No Violations | |
| -1288246677 | 2016-1-25 0:00: | PW | No Violations | 3.50 |
| -1380221034 | 2016-4-20 0:00: | PW | No Violations | 3.00 |
| -1394440620 | 2016-1-5 0:00:0 | PB | No Violations | 8.00 |
| -1397167303 | 2016-3-17 0:00: | SC | No Violations | 5.50 |
| -1411905854 | 2017-1-26 0:00: | SW | No Violations | 3.00 |
| -1457571713 | 2016-8-30 0:00: | SW | No Violations | 2.50 |
| -1628947817 | 2016-5-9 0:00:0 | PL | No Violations | 1.00 |
| -1680537534 | 2015-1-8 0:00:0 | DD | No Violations | 0.60 |
| -1694279984 | 2016-1-26 0:00: | PW | No Violations | 10.00 |
| -1745286350 | 2017-9-6 0:00:0 | SW | No Violations | |
| -1749574341 | 2019-3-13 0:00: | SW | No Violations | |
| -1833773600 | 2016-1-14 0:00: | PW | No Violations | 4.50 |
| -1929070593 | 2016-6-20 0:00: | SW | No Violations | 5.50 |
| -1946943445 | 2016-4-1 0:00:0 | PW | No Violations | 1.00 |
| -2062427552 | 2017-8-2 0:00:0 | SW | No Violations | 4.00 |
| -213407752 | 2016-11-15 0:00 | SW | No Violations | 1.00 |
| -217416453 | 2016-11-29 0:00 | SW | No Violations | 8.00 |
| -250179834 | 2016-3-18 0:00: | SC | No Violations | 7.50 |
| -328088757 | 2018-9-20 0:00: | SW | No Violations | 2.00 |
| -441549210 | 2015-10-14 0:00 | PW | No Violations | 2.00 |
| -460674828 | 2015-1-3 0:00:0 | CS | No Violations | 4.00 |
| -498767420 | 2016-3-24 0:00: | SW | No Violations | 3.00 |
| -645851963 | 2016-1-6 0:00:0 | PB | No Violations | 9.00 |
| -81838465 | 2016-11-22 0:00 | SW | No Violations | 0.50 |
| -965211182 | 2018-5-30 0:00: | SW | No Violations | 2.00 |
| 0081838465 | 2016-11-22 | Salt Water Injection Well | No Violations | Compliance Notice # 213407752 follow up inspection. The injection tubing master valve is closed. Annulus is on vacuum. A service rig has been scheduled for 11-23-16. |
| 0150249310 | 2017-12-13 | Salt Water Injection Well | No Violations | My inspection revealed the salt water injection well had 452 psi on the annulus and the injection tubing was on vacuum. The containment dike was free of fluids. Legible identification was posted. |
| 0213407752 | 2016-11-15 | Salt Water Injection Well | Violations Noted | Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. The annulus was on a strong vacuum. I called Shawn Maynard and told him the well has mechanical failure and they need to shut in the well and test the annulus. I also talked to Doug Kitchen who said that they are going to schedule a service rig. |
| 0217416453 | 2016-11-29 | Salt Water Injection Well | No Violations | Witnessed repairs to injection line connections with in the containment dike area, flanged gaskets and 1/4 inch fittings that were corroded. Larry Howdyshell and Shawn Maynard on site. Collected a brine sample from the filter skid drain. Sample to be taken to the ODNR Lab. Inspected the injection and annulus pressure. The containment dike is free of fluids. |
| 0250179834 | 2016-03-18 | Surface Facility Construction | No Violations | Containment dike walls were assembled. A 4 layer of sand was applied to the inside of the containment prior the liner installation. The 30 mil liner was installed and small diameter washed gravel was placed on top of the liner. Gravel is approximately 4 to 5 thick. 30 tons of sand and 15 tons of washed gravel were used on the containment construction. |
| 0328088757 | 2018-09-20 | Salt Water Injection Well | No Violations | Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification is posted at the well and facility. The containment dike is free of fluids. The two pen recorder chart is past due for changing the data is being wrote over. I contacted Larry Howdyshell and told him to change the chart. |
| 0399489207 | 2016-04-12 | Surface Facility Construction | No Violations | Injection line test. Test at 605 psi. at 5 minutes 602psi, at 15 minutes 598 psi. Company was unable to demonstrate a successful test on the 4 gathering line flowing to the surface facility from the production tanks. |
| 0441549210 | 2015-10-14 | Production Wells | No Violations | Permit to convert to SWIW. Kilbarger service rig is on location. Rig is not set up on the well. Access road has a gravel stream crossing that doesnt have a culvert installed. The water is backing upstream of the crossing. Proposed location for the surface facility has been disked up recently. |
| 0451637177 | 2018-08-29 | Salt Water Injection Well | No Violations | Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification is posted at the facility and the well. The containment dike is free of fluids. |
| 0460674828 | 2015-01-03 | Casing String Witnessed | No Violations | -
- Spud date 1/2/2015, - - Good circulation when pumping cement, cement return to surface. 145 sacks of class A cement used. |
| 0498767420 | 2016-03-24 | Salt Water Injection Well | No Violations | Hocking Hills Energy has placed the 2 injection tubing inside the 4 seamless conduit. The are waiting on the manufacture of the injection tubing to apply factory ends on the tubing before making any connections. |
| 0645851963 | 2016-01-06 | Plug / Plug Back | No Violations | Rig tools tagged top of cement plug at 3424. Service rig installed 2387.60 of 4.5 casing with a packer. Pumped 50 sacks cement through packer ports. Tested the 4.5 casing at 950 psi for 5 minutes with no loss in pressure. Well is shut in with a swedge and a valve. |
| 0765945029 | 2016-11-23 | Salt Water Injection Well | No Violations | Compliance Notice # 213407752 follow up inspection. Berry Well Service rig on the well. Released the packer and extracted the injection tubing. The injection tubing had a hole at approximately 2036. The tubing and packer job is scheduled for 11-28-16. |
| 0913363599 | 2017-06-01 | Salt Water Injection Well | No Violations | Salt water injection well inspection. The injection pressure was 0 PSI, the annulus pressure was 520 PSI. No violations noted. |
| 0953064122 | 2017-07-13 | Salt Water Injection Well | No Violations | Quarterly UIC inspection. The annulus pressure was 225 PSI, the injection tubing was on vacuum. Legible identification was posted. No violations noted. |
| 0959113957 | 2015-01-05 | Casing String Witnessed | No Violations | -
- - 80 sacks of class A cement used. - Did not witness cement job. - inspection late afternoon and operator has Formation Cementing on site to fill annulus of casing, trying to place tubing in the annulus for placement of cement. Off-site due to time. |
| 0965211182 | 2018-05-30 | Salt Water Injection Well | No Violations | Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. The containment dike is free of fluids. Identification is posted at the facility and the well. |
| 1008922650 | 2015-05-05 | Production Wells | No Violations | Site Evaluation for a salt water injection well permit. Access road crosses Lick Run. The crossing has been built up with stone. The crossing is 612 feet South West of the well at GPS N39.60084 / W083.03631. There are 9 water wells with-in the 1/2 mile area of review. Water well Log Numbers: 20829, 833949,781836,983767, 69685,69684,757146, 971276, 831168. The well is located 993 feet North West of the Access road entrance (GPS N39.60031/W083.03759). The Gilford C&B#3 # 251 is located in a flat agricultural field. The well is not equipped with production lines or equipment. The well is shut in with two valves and a plug. |
| 1053754982 | 2019-02-11 | Salt Water Injection Well | Violations Noted | The Division has not received the 1st, 2nd, 3rd, & 4th quarter brine disposal fees for 2018. Please forward disposal fees and sheets to the Division by 3/12/2019. |
| 1126073824 | 2016-11-30 | Salt Water Injection Well | No Violations | Witnessed the start up of injection operations. All surface connections are water tight. The containment dike is free of fluids. Shawn Maynard and Doug Kitchen on site. |
| 1193693489 | 2017-07-26 | Salt Water Injection Well | No Violations | I met with well owner Chuck Henry Energy. The purpose of the meeting was to ensure the well is in compliance with the permit conditions. The well was being operated by Hocking Hills Energy. Hocking Hills Energy monitoring systems have been disable. Chuck Henry Energy is now the operator of this well. They have decided to eliminate the system Hocking Hills Energy had installed and replace with conventional float switches, Murphy gauge and any other component of the monitoring equipment. This change is to simplify the system with less chance of failure. |
| 1222392147 | 2016-02-04 | Production Wells | No Violations | Permit to convert to salt water injection well. Install new DL Shear tension packer (DL-412-4500-087) and 2336 feet of used 2 3/8 tubing. Pulled 14,000 lbs. over string weight. Fill annulus with 24.52 barrels fresh water and inhibitor. Unable to pressure up the annulus above 450 psi. (Test pressure is 545psi) Multiple attempts to tighten the wellhead were not successful. The annulus test was canceled and a new wellhead has been ordered. |
| 1232364877 | 2019-04-29 | Salt Water Injection Well | Violations Noted | Our records indicate that the Division has not received the Salt Water Injection Well Annual Report (Form 204) that was due on April 15th for 2018, Please submit the Form 204 to the Division by 5/29/2019. |
| 1260963192 | 2018-10-17 | Salt Water Injection Well | No Violations | My inspection revealed the salt water injection well had 8 psi on the annulus and the tubing was on vacuum. The containment dike was fee of fluids and the well had legible identification. Chuck Henry Energy had a representative on site during my inspection repairing one of the needle valves at the wellhead. |
| 1288246677 | 2016-01-25 | Production Wells | No Violations | Permit to convert to salt water injection well. Formation packer on the bottom of the 4.5 casing was drilled out on 1-22-16. Currently cleaning out the open portion of the well below the 4.5 casing at 2861. Circulating shale cuttings and gel to surface. Drilling with a 3 7/8 bit. |
| 1380221034 | 2016-04-20 | Production Wells | No Violations | Permit to convert to salt water injection well. Preparing for the pressure fall off test. A slick line truck is on the well installing down hole gauges. Fluid level is at 290 feet. Tested injection line due to the removal of the master valve and the installation of a frac valve. Injection line was tested at 420 psi due to the pressure pop off valve on the injection pump. Held 420 psi for 15 minutes with no loss. |
| 1394440620 | 2016-01-05 | Plug / Plug Back | No Violations | Permit to convert to SWIW plug back. Pumped 80 sack plug through 3820 of 2 3/8 tubing. Plug from 3830 to 3400 . |
| 1397167303 | 2016-03-17 | Surface Facility Construction | No Violations | Constructing the containment dike walls. Approved plan calls for 32 by 32 by 4 containment with two 300 barrel tanks and one 100 barrel tank. The containment as built is 38 7.5 by 29 2.75 by 35 with two 300 barrel tanks and one 210 barrel tank. I told Shawn Maynard that they need to submit the revised plan to the UIC section for approval, prior to proceeding with construction. |
| 1411905854 | 2017-01-26 | Salt Water Injection Well | No Violations | Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted. The containment dike is free of fluids. |
| 1421172639 | 2014-12-30 | Not Drilled | No Violations | - On site to review propose well location, operator is cutting in lease road and small stream crossing.
- The operator has applied for drilling permits, none have been issued as of this date. |
| 1452109439 | 2016-01-04 | Plug / Plug Back | No Violations | Permit to convert to SWIW. Plug back. Kilbarger service rig is running 2 3/8 tubing for the plug back. |
| 1452696752 | 2016-01-11 | Production Wells | No Violations | Permit to convert to salt water injection well. Appalachian Well Survey wire line truck ran a cement bond log on the 4.5 casing. |
| 1454417937 | 2016-02-01 | Production Wells | No Violations | Permit to convert to saltwater injection well. Baker Hughes and Producers service company on site to run a spinner survey. Accompanied by UIC Geologist. Two 500 barrel tanks are on site and filled with brine for the survey. |
| 1456879632 | 2016-03-01 | Production Wells | Violations Noted | An inspection of the well site revealed Brine and Oil contamination on the ground. The total area is approximately 72 feet by 33 feet. High Range Quantabs were used at 5 locations along the boundary of the contamination. Three of the Quantabs were maxed out at above 6215 ppm Cl. The remaining Quantabs were 4429 ppm Cl and 3993 ppm Cl. Residual products that were contained in the lined pit are now on the ground, such as gel, lost circulation material, oil and brine. All contaminated soil and water must be removed from the location. The brine must be disposed of at a class 2 disposal well. The contaminated soil must go to an EPA approved land fill. A detailed remediation plan must be submitted to the UIC Section for approval prior to remediation of the site. |
| 1457446345 | 2016-03-07 | Production Wells | No Violations | Compliance notice # 1456879632 follow up inspection. Meet with Shawn Maynard on site to review the progress of the ongoing remediation. High Range Quantabs were used to delineate remaining areas of contamination. |
| 1457571713 | 2016-08-30 | Salt Water Injection Well | No Violations | Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted on the facility and the well. The containment dike was free of fluids. |
| 1458156062 | 2016-03-16 | Salt Water Injection Well | No Violations | Secondary containment inspection. Hocking Hills Energy has began installing the secondary containment for the 2-210 barrel tanks. Approx. half of the posts have been driven and the walls have been attached. Once the walls are complete. The walls will be backfilled prior to the sand layer being installed. After the sand layer is installed the liner will be installed. Picture were taken of the wall construction. |
| 1458755366 | 2016-03-23 | Salt Water Injection Well | No Violations | Hocking Hills Energy is on digging a trench from the containment dike to the well head. The trench is approx. 3 deep and 1.5 wide. 4 black seamless pipe was placed in the trench along with 1.25 jointed conduit. The trench was backfilled and the injection line will be installed inside the 4 pipe at a later date. |
| 1459533074 | 2016-04-01 | Surface Facility Construction | No Violations | Two 300 barrel fiberglass tanks and one 210 barrel steel tank have been set in the containment dike. A filter skid and injection pump are also in the containment dike. The 2 injection line has been installed in a 4 plastic line from the well to the out side of the containment dike. |
| 1461070332 | 2016-04-15 | Surface Facility Construction | No Violations | Test the brine transfer line from the Lutz Delong tank battery GPS N39.61133/W083.04930 to the Gifford surface facility. Tested at 202 psi for 15 minutes with a loss of 2psi. |
| 1461251471 | 2016-04-21 | Salt Water Injection Well | No Violations | I witnessed the pressure fall off test. The test began at 0600 hours. The pressure was 0 for the duration of the test. The well is on vacuum. The test lasted for 12 hours. |
| 1461338825 | 2016-04-20 | Production Wells | No Violations | Compliance Notice # 1456879632 Follow up inspection. Contaminated material has been removed from location. Site has been rough graded and seed and mulch are being applied to bare areas. The access road has had a Geo fabric liner and gravel applied from the paved county road to the surface facility. |
| 1462218385 | 2016-05-02 | Production Wells | No Violations | Permit to convert to salt water injection well. Injection line test. Tested the injection line from the facility to the wellhead master valve at 570 psi, at five minutes 565psi, at fifteen minutes 560 psi. Test passed. Continuous monitoring sensors for the injection line and annulus have not been installed. The injection line leak sensor has not been installed. The well is not equipped with 1/4 fittings on the annulus or injection tubing. I talked to Shawn Maynard about the items that need to be installed prior to requesting the Chief Order to inject. |
| 1463145005 | 2016-05-10 | Surface Facility Construction | No Violations | Inspected the containment dike, tanks, injection pump, injection pressure sensor installation, annulus pressure sensor installation, Pressure cut off switch (Murphy Switch), Flow meter (currently reading 327 barrels) I asked Shawn Maynard why they have injected 327 barrels. Shawn stated that it was during testing of the facility sensors and tank level sensors. I told him that they do not have authorization to inject. All valves from the facility to the well are open including the injection tubing master valve. The injection line leak sensor is connected to the 4 plastic conduit. The sensor is not vented to the tank as described in the submitted plans. The rubber transition fitting from the 4 plastic conduit to the 2 injection line is not installed on the facility side. It is also not connected on the well side. The injection pressure sensor has been installed at the facility on the injection line between the pump and the flow meter. Identification was not posted at the well or facility. 1/4 injection fitting and 1/4 annulus fitting has been installed. |
| 1466428107 | 2016-06-16 | Surface Facility Construction | No Violations | Permit to convert to salt water injection well issued 9-23-2015. Inspected the facility, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. The tanks are full of brine. All valves are open(including the injection tubing master valve and the injection line valves). The electric service is connected and all switches are on. New filter socks are on top of the filter housing. The flow meter read out is contained in a locked metal cabinet at the facility. I was not able to access the flow meter display. The containment dike is free of fluids. Identification is posted at the facility and the well. The injection line leak sensor is not bolted to the housing. The leak sensor housing is also not vented to the tank. The leak sensor housing is vented into the containment dike. |
| 1467381388 | 2016-06-29 | Salt Water Injection Well | No Violations | Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well and facility. The flow meter is not connected to a visual display. |
| 1469798748 | 2016-07-28 | Salt Water Injection Well | No Violations | Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well and facility. The onsite digital display for volume and pressure was not operational during the inspection. The containment dike was free of fluids. |
| 1480685346 | 2016-11-28 | Salt Water Injection Well | No Violations | Compliance Notice # 213407752 follow up inspection. Berry Well Service rig installed a rebuilt DL shear Tension Packer DL412-4500-087, with new 2 3/8 inch tubing set at 2328.65 feet. After setting the packer, 150 gallons of fresh water was placed in the annulus with corrosion inhibitor. The annulus fluid level was at the surface. The annulus was pressure tested at 620 psi for 15 minutes with no loss in pressure. |
| 150249310 | 2017-12-13 0:00 | SW | No Violations | 0.10 |
| 1502799603 | 2017-08-15 | Salt Water Injection Well | No Violations | My inspection today reveled the well is in compliance. The two pin recorder has been installed and is working. No violations noted. I did not check the annulus or tubing pressure this inspection. |
| 1518736152 | 2016-03-17 | Production Wells | No Violations | Compliance Notice # 1456879632 follow up inspection. Tested standing water with high end Quantabs. Results ranged from 2521 ppm Cl to 486 ppm Cl. Reviewed the results with Shawn Maynard on site. |
| 1527564798 | 2019-04-29 | Salt Water Injection Well | No Violations | My inspection of this well revealed the well was on vacuum and the annulus had 8 psi. The dike was relativity free of fluids. Legible identification was posted. |
| 1599664728 | 2015-10-29 | Production Wells | No Violations | Production well inspection. Kilbarger Drilling has a service rig on site. No work today. The well has been permitted to become a injection well. |
| 1628947817 | 2016-05-09 | Preliminary Restoration | No Violations | The purpose of this inspection is a status check on a preliminary restoration. During my inspection I witnessed the salt water injection well is equipped with 4.5 inch casing and tubing. The Injection equipment consists of two 300 bbl. fiberglass tanks, one 210 bbl. steel tank, a filtration system, and a 400 RPM 33 GPM reciprocation pump all within a steel dike with 30 mil liner and gravel. The lease road has gravel on top of a woven fabric liner. The site has vegetation growing up through the straw mulch. Location has met 1509.072 A requirements and preliminary restoration has passed. |
| 1670037329 | 2015-07-14 | Production Wells | No Violations | Permit application to convert to salt water injection well. I measured the access road from Smith Haus road to the stream crossing it was 440. |
| 1680537534 | 2015-01-08 | Drill / Deepen / Reopen | No Violations | - On site for drilling progress, drilling depth 2,392 well permited to 3500 |
| 1694279984 | 2016-01-26 | Production Wells | No Violations | Permit to convert to salt water injection well. Drilled out (cleanout) open portion of well with a 3 7/8 bit to 3391. Circulate well capacity to surface, flow into a plastic lined pit. Disconnect power swivel and mud pump. Start extracting tubing. |
| 1737859529 | 2017-11-28 | Work Over Reconditioning | No Violations | Berry Well Service reworked the well. The tubing and packer were tripped out of the hole on November 27, 2017. The tubing was in poor condition and was replaced. Used pressure tested and drifted 2 3/8 inch, 4.70 pound per foot, 8 round thread, EUE (upset), L80 and J55 lined pipe was utilized. The D L Shear Tension Packer DL412-4500-087 was rebuilt and utilized. On November 28, 2017 a total of 72 joints of pipe were run in the hole with a tally of 2315.15 feet in length, the packer at 2.85 feet and set at 2318.00 feet with a pup joint that was 3.45 feet. Inhibitor was mixed with 55 barrels of water in the Martindill Oilfield Service LLC truck UIC 25-344. Cemenco Services pumped the water through the tubing and circulated to the surface. The packer was set, well head completed, and pressure tested. The well lost less than one percent of the original pressure after 15 minutes. The well passed and was put back into service. |
| 1745286350 | 2017-09-06 | Salt Water Injection Well | No Violations | My inspection today revealed the saltwater injection well had 129 psi on the annulus. The injection tubing was on vacuum. |
| 1833773600 | 2016-01-14 | Production Wells | No Violations | Permit the convert to salt water injection well. Currently running tubing and drill bit into the 4.5 casing to drill out the packer at the bottom of the 4.5 casing. Packer set at 2387.60. |
| 1841363082 | 2016-11-21 | Salt Water Injection Well | No Violations | Compliance Notice # 213407752 follow up inspection. The injection tubing master valve is closed. Annulus is on vacuum. |
| 1929070593 | 2016-06-20 | Salt Water Injection Well | No Violations | I was asked by UIC inspector Jon Scott to witness the start up of this injection well. Per Chiefs order 2016-203, this allows the operator to begin injecting salt water. The flow meter before injecting today read 2979 barrels. During my inspection, the operator put down 8 barrels of salt water. The injection side measured 0 PSI. The annulus pressure was 168 PSI. I did not observe any leaks during the operation of the well. |
| 1946943445 | 2016-04-01 | Production Wells | No Violations | Compliance notice # 1456879632 follow up. Standing water at the well site was tested with high range Quantabs, The results ranged from 2284 ppm cl to 403 ppm cl. |
| 2039418780 | 2016-03-11 | Production Wells | No Violations | Compliance Notice # 1456879632 follow up inspection. Field tested standing water with High Range Quantabs on the previously delineated contamination area. (1) 486 ppm Cl (2)693 ppm Cl (3) 693 ppm Cl (4) 1037 ppm Cl (5) 2521 ppm Cl (6)533 ppm Cl (7) 753 ppm Cl (8) 486 ppm Cl. Meet with Shawn Maynard on site to review continued remediation. |
| 2051237981 | 2018-03-15 | Salt Water Injection Well | No Violations | My inspection revealed the salt water injection well was on vacuum on the tubing and had 20 psi on the annulus. The dike was free of fluids. Legible identification was posted. |
| 2062427552 | 2017-08-02 | Salt Water Injection Well | No Violations | The purpose of my inspection was to determine if the system that was installed to monitor the annulus and injection line and tank levels was working correctly. The sonic tank level detection system has been replaced with float switches and a murphy switch, The murphy switch is set at 300 PSI. Only two tanks are being used. The two 300 barrel fiberglass tanks are being used. The 210 barrel steel tank has been taken out of service due to the corrosion of the steel tank. The fiberglass tank that is being used to hold salt water to be pumped down the injection well is protected by a float switch. The second fiberglass tank is a over flow tank and will be protected by a float switch that will shut down the electronic valve on the production line. The two pin recorder will be installed by 8-4-2017. |
| 2087691996 | 2020-5-26 0:00: | SW | No Violations | 1.00 |
| 399489207 | 2016-4-12 0:00: | SC | No Violations | 3.00 |
| 451637177 | 2018-8-29 0:00: | SW | No Violations | 0.70 |
| 765945029 | 2016-11-23 0:00 | SW | No Violations | 8.50 |
| 913363599 | 2017-6-1 0:00:0 | SW | No Violations | 2.50 |
| 953064122 | 2017-7-13 0:00: | SW | No Violations | 0.40 |
| 959113957 | 2015-1-5 0:00:0 | CS | No Violations | 3.30 |
| Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
|---|---|---|---|---|
| 0213407752 | US-OH-121880 | 2016-12-22 | Mechanical failure/contamination | |
| 1053754982 | US-OH-100935 | 2019-04-08 | Failure to report disposal fees | |
| 1232364877 | US-OH-106247 | 2019-05-09 | Failure to file salt water injection annual report | |
| 1456879632 | US-OH-113236 | 2016-05-06 | Well operation causing pollution and contamination |
For data sources see[3]