X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-129-20256

Well Details

Well ID: 34-129-20256
Loading map...
Country: United States
State: Ohio
County: Pickaway
Municipality: Circleville Township
Operator Name: DART OIL & GAS OHIO LLC
Well Pad ID:
Farm/Lease Name: RICHARDS LAND CO
License Status: Final Restoration
License Date: 2015-05-12
Spud Date: 2015-05-26
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2015-05-31
Well Total Depth: 2654.00 ft
Configuration: Vertical
Latitude: 39.580000
Longitude: -82.960000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-05-12 Proposed Formations:KNOX, Issued Date:5/12/2015, Expired Date:5/11/2017 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:EOUT
Plugged/Abandoned 2015-05-31 CHANGED STATUS FROM PA TO FR PER FACILITY REPORT DATED 5/28/2015 FROM KIP THOMPSON F_REST_PASS **SEE IMAGES** ON 5/7/2018 CM.
Reached Total Depth 2015-05-31 CHANGED STATUS FROM PA TO FR PER FACILITY REPORT DATED 5/28/2015 FROM KIP THOMPSON F_REST_PASS **SEE IMAGES** ON 5/7/2018 CM.
Completion Report Received 2015-06-16 CHANGED STATUS FROM PA TO FR PER FACILITY REPORT DATED 5/28/2015 FROM KIP THOMPSON F_REST_PASS **SEE IMAGES** ON 5/7/2018 CM.
Construction Permit Expires 2017-05-11 CHANGED STATUS FROM PA TO FR PER FACILITY REPORT DATED 5/28/2015 FROM KIP THOMPSON F_REST_PASS **SEE IMAGES** ON 5/7/2018 CM.
Record Last Modified 2018-05-07 CHANGED STATUS FROM PA TO FR PER FACILITY REPORT DATED 5/28/2015 FROM KIP THOMPSON F_REST_PASS **SEE IMAGES** ON 5/7/2018 CM.

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-2018711678 2015-5-28 0:00: DD No Violations 3.00
1432228613 2015-05-21 Drill / Deepen / Reopen No Violations Kilbarger rig number 1 has moved on site. Pits have been dug and lined. Spud date is 05/26/15.
1432652412 2015-05-26 Drill / Deepen / Reopen No Violations Kilbarger rig number 1 on. They have spudded the well and have reached 26 by 1100 hours. Training with Jimmy Wiles. The mud pit and blow pit are properly lined with reinforced plastic. No violations were noted.
1433184434 2015-06-01 Plug / Plug Back No Violations The well was a dry hole. Dart Energy decided to plug the well using drill pipe. The bottom plug was set at 300. When the rig attempted to pull up for the next plug, they found the drill pipe was hung. Appalachian Well Service was on site by 1130 hours. Three attempts were made to jar the pipe loose so the rig could unscrew the pipe at the top of cement. The pipe was unscrewed at 2316. The remainder of the plugs were set with out any problems.
1495275927 2015-05-28 Drill / Deepen / Reopen No Violations Kilbarger rig 1 has reached total depth for surface casing. The depth is 811. 773 of 7 surface casing ran, good cement returns.
1768623909 2015-05-27 Drill / Deepen / Reopen No Violations Formation cementing on site at 1210 hours. 269 9.62 conductor. Good cement returns. Kilbarger will set idle for 8 hours before drilling for surface casing.
2018711678 2015-05-28 Drill / Deepen / Reopen No Violations Kilbarger rig number 1 drilling thru the big lime. They reached 407 by 0930 hours. The surface casing will be set at approx. 775. The surface casing cementing will be tonight.

For data sources see[3]

References