If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-129-20256 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.58,"lon":-82.96,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Pickaway | |
Municipality: Circleville Township | |
Operator Name: DART OIL & GAS OHIO LLC | |
Well Pad ID: | |
Farm/Lease Name: RICHARDS LAND CO | |
License Status: Final Restoration | |
License Date: 2015-05-12 | |
Spud Date: 2015-05-26 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2015-05-31 | |
Well Total Depth: 2654.00 ft | |
Configuration: Vertical | |
Latitude: 39.580000 | |
Longitude: -82.960000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-05-12 | Proposed Formations:KNOX, Issued Date:5/12/2015, Expired Date:5/11/2017 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:EOUT |
Plugged/Abandoned | 2015-05-31 | CHANGED STATUS FROM PA TO FR PER FACILITY REPORT DATED 5/28/2015 FROM KIP THOMPSON F_REST_PASS **SEE IMAGES** ON 5/7/2018 CM. |
Reached Total Depth | 2015-05-31 | CHANGED STATUS FROM PA TO FR PER FACILITY REPORT DATED 5/28/2015 FROM KIP THOMPSON F_REST_PASS **SEE IMAGES** ON 5/7/2018 CM. |
Completion Report Received | 2015-06-16 | CHANGED STATUS FROM PA TO FR PER FACILITY REPORT DATED 5/28/2015 FROM KIP THOMPSON F_REST_PASS **SEE IMAGES** ON 5/7/2018 CM. |
Construction Permit Expires | 2017-05-11 | CHANGED STATUS FROM PA TO FR PER FACILITY REPORT DATED 5/28/2015 FROM KIP THOMPSON F_REST_PASS **SEE IMAGES** ON 5/7/2018 CM. |
Record Last Modified | 2018-05-07 | CHANGED STATUS FROM PA TO FR PER FACILITY REPORT DATED 5/28/2015 FROM KIP THOMPSON F_REST_PASS **SEE IMAGES** ON 5/7/2018 CM. |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-2018711678 | 2015-5-28 0:00: | DD | No Violations | 3.00 |
1432228613 | 2015-05-21 | Drill / Deepen / Reopen | No Violations | Kilbarger rig number 1 has moved on site. Pits have been dug and lined. Spud date is 05/26/15. |
1432652412 | 2015-05-26 | Drill / Deepen / Reopen | No Violations | Kilbarger rig number 1 on. They have spudded the well and have reached 26 by 1100 hours. Training with Jimmy Wiles. The mud pit and blow pit are properly lined with reinforced plastic. No violations were noted. |
1433184434 | 2015-06-01 | Plug / Plug Back | No Violations | The well was a dry hole. Dart Energy decided to plug the well using drill pipe. The bottom plug was set at 300. When the rig attempted to pull up for the next plug, they found the drill pipe was hung. Appalachian Well Service was on site by 1130 hours. Three attempts were made to jar the pipe loose so the rig could unscrew the pipe at the top of cement. The pipe was unscrewed at 2316. The remainder of the plugs were set with out any problems. |
1495275927 | 2015-05-28 | Drill / Deepen / Reopen | No Violations | Kilbarger rig 1 has reached total depth for surface casing. The depth is 811. 773 of 7 surface casing ran, good cement returns. |
1768623909 | 2015-05-27 | Drill / Deepen / Reopen | No Violations | Formation cementing on site at 1210 hours. 269 9.62 conductor. Good cement returns. Kilbarger will set idle for 8 hours before drilling for surface casing. |
2018711678 | 2015-05-28 | Drill / Deepen / Reopen | No Violations | Kilbarger rig number 1 drilling thru the big lime. They reached 407 by 0930 hours. The surface casing will be set at approx. 775. The surface casing cementing will be tonight. |
For data sources see[3]