If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-129-20257 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.57,"lon":-82.98,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Pickaway | |
| Municipality: Wayne Township | |
| Operator Name: DART OIL & GAS OHIO LLC | |
| Well Pad ID: | |
| Farm/Lease Name: RICHARDS LAND CO | |
| License Status: Final Restoration | |
| License Date: 2015-05-12 | |
| Spud Date: 2015-06-03 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2015-06-07 | |
| Well Total Depth: 2567.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.570000 | |
| Longitude: -82.980000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2015-05-12 | Proposed Formations:KNOX, Issued Date:5/12/2015, Expired Date:5/11/2017 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2015-06-07 | |
| Plugged/Abandoned | 2015-06-09 | |
| Completion Report Received | 2015-08-03 | |
| Record Last Modified | 2017-02-10 | |
| Construction Permit Expires | 2017-05-11 |
For data sources see[2]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1063502140 | 2015-6-16 0:00: | FR | No Violations | 1.00 |
| -1158016240 | 2015-6-8 0:00:0 | DD | No Violations | 2.00 |
| -145726830 | 2015-6-8 0:00:0 | FR | No Violations | 3.00 |
| -1687927248 | 2015-6-3 0:00:0 | DD | No Violations | 2.50 |
| 0145726830 | 2015-06-08 | Final Restoration | No Violations | Final restoration inspection. The pits are closed and the topsoil is respread over the disturbed area. Final restoration passed. |
| 1063502140 | 2015-06-16 | Final Restoration | No Violations | Final restortion inspection. The topsoil has been respread. |
| 1158016240 | 2015-06-08 | Drill / Deepen / Reopen | No Violations | Kilbarger rig number reached total depth at 12:30. The well is a dry hole. They will be plugging the well tonight. |
| 1433530485 | 2015-06-05 | Drill / Deepen / Reopen | No Violations | Kilbarger rig number 1 has reached 843. They ran 811 7 surface casing. Petroset Cementing on site at 1630 hours. The pump truck broke down before any cement was pumped. A replacement truck was sent and arrived at 1700 hours. Surface casing cement was pumped and had good cement returns. |
| 1687927248 | 2015-06-03 | Drill / Deepen / Reopen | No Violations | Kilbarger rig number 1 has moved on site. Pits are being dug and the site is being prepped. Kilbarger will spud sometime today. |
| 2063822782 | 2015-06-08 | Plug / Plug Back | No Violations | The well reached total depth today at 1300 hours. The well was a dry hole. Petroset on site to plug the well. Plugs circulated. |
For data sources see[3]