X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-129-20261

Well Details

Well ID: 34-129-20261
Loading map...
Country: United States
State: Ohio
County: Pickaway
Municipality: Wayne Township
Operator Name: MARKSMEN ENERGY USA INC
Well Pad ID:
Farm/Lease Name: DAVIS-HOLBROOK
License Status: Producing
License Date: 2016-01-20
Spud Date: 2016-06-16
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2016-06-21
Well Total Depth: 2475.00 ft
Configuration: Vertical
Latitude: 39.600000
Longitude: -83.040000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-01-20 Proposed Formations:TRENTON, BLACK RIVER, TREMPEALEAU, Issued Date:1/20/2016, Expired Date:1/19/2018 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2016-06-21 STATUS CHANGED FROM WP TO PR PER PRODUCTION RECEIVED/INSPECTION/CEMENT TICKET, PREVIOUS STATUS DATE 01/20/16-ALE 04/18/2017. TD DATE PER INSPECTION NOTES, NO FORM 8 RCVD AS OF 05/08/20017-ALE. FORM 8 /8 A RCVD, STILL NEED RECORD FROM PRODUCERS SERVICE CORPORATION AND INVOICE, CONTACTED COMPANY VIA EMAIL, SCANNED INTO FILE 6/23/17
Completion Report Received 2017-06-16 STATUS CHANGED FROM WP TO PR PER PRODUCTION RECEIVED/INSPECTION/CEMENT TICKET, PREVIOUS STATUS DATE 01/20/16-ALE 04/18/2017. TD DATE PER INSPECTION NOTES, NO FORM 8 RCVD AS OF 05/08/20017-ALE. FORM 8 /8 A RCVD, STILL NEED RECORD FROM PRODUCERS SERVICE CORPORATION AND INVOICE, CONTACTED COMPANY VIA EMAIL, SCANNED INTO FILE 6/23/17
Construction Permit Expires 2018-01-19 STATUS CHANGED FROM WP TO PR PER PRODUCTION RECEIVED/INSPECTION/CEMENT TICKET, PREVIOUS STATUS DATE 01/20/16-ALE 04/18/2017. TD DATE PER INSPECTION NOTES, NO FORM 8 RCVD AS OF 05/08/20017-ALE. FORM 8 /8 A RCVD, STILL NEED RECORD FROM PRODUCERS SERVICE CORPORATION AND INVOICE, CONTACTED COMPANY VIA EMAIL, SCANNED INTO FILE 6/23/17
Record Last Modified 2019-06-11 STATUS CHANGED FROM WP TO PR PER PRODUCTION RECEIVED/INSPECTION/CEMENT TICKET, PREVIOUS STATUS DATE 01/20/16-ALE 04/18/2017. TD DATE PER INSPECTION NOTES, NO FORM 8 RCVD AS OF 05/08/20017-ALE. FORM 8 /8 A RCVD, STILL NEED RECORD FROM PRODUCERS SERVICE CORPORATION AND INVOICE, CONTACTED COMPANY VIA EMAIL, SCANNED INTO FILE 6/23/17

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 MARKSMEN ENERGY USA INC 0.00 13223.00 170
2017 MARKSMEN ENERGY USA INC 0.00 20595.00 365
2018 MARKSMEN ENERGY USA INC 0.00 13670.00 365

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 MARKSMEN ENERGY USA INC Brine 13 170
2017 MARKSMEN ENERGY USA INC Brine 6301 365
2018 MARKSMEN ENERGY USA INC Brine 10502 365

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1139423272 2016-6-8 0:00:0 SC No Violations 4.00
-1222424829 2016-6-16 0:00: DD No Violations 8.00
-1717291334 2019-3-8 0:00:0 PW No Violations 0.30
-1950679237 2016-6-17 0:00: DD No Violations 4.30
-2009483865 2019-4-29 0:00: PW No Violations 0.30
-656491800 2016-7-7 0:00:0 DD No Violations 5.50
-976358533 2018-2-6 0:00:0 PW No Violations 0.50
0308835914 2016-06-15 Drill / Deepen / Reopen No Violations Polsun Drilling has moved the rig in. The pits are dug and they have mixed mud in preparation of spudding the well on 06/16/16.
0656491800 2016-07-07 Drill / Deepen / Reopen No Violations Contractor on site today to solidify the pit. The majority of the water was removed from the pit and taken to an injection well. Limestone dust was blown into the pit and stirred using a track hoe. The liner was cut at fluid level and removed. The pit will sit until 7-8-2016 to allow the cutting to solidify. At that time the pit will be closed.
0961986492 2017-12-07 Production Wells No Violations My inspection revealed the is owned by Marksman Energy. The well consists of a pumping unit, 2-201 barrel tanks and 1-100 barrel tank. Legible identification was posted.
0976358533 2018-02-06 Production Wells No Violations My inspection revealed the well was in production during my inspection. The well consists of a pumping unit, 2-210 barrel tanks and 1-100 barrel tank. Legible identification was posted.
1139423272 2016-06-08 Surface Facility Construction No Violations Marksmans Energy has built the lease road and the pad. The rig will be moved in on 6-9-16. They plan on spudding on 6-13-16.
1158014134 2016-06-20 Drill / Deepen / Reopen No Violations Poulson Drilling has reached 1911 by 0730 today. The mud loggers are on site. The 80 steel blow line is secured. No violations noted.
1222424829 2016-06-16 Drill / Deepen / Reopen No Violations Poulson Drilling spudded today at 0730 hours. They have reached 166 by 1030 hours. They are drilling for conducor pipe. The conductor will be set at 250.
1273197012 2016-06-21 Drill / Deepen / Reopen No Violations Poulson Drilling reached total depth of 2475 at 0430. Good show of oil. Appalachian Well Survey logged the hole. 4.5 production casing was ran and cemented. The well will be completed on 06/29/2016.
1465224339 2016-06-06 Surface Facility Construction No Violations Marksman Energy has began construction of the lease road and drill pad. The pits will be constructed 6-10-2016.
1466258857 2016-06-18 Drill / Deepen / Reopen No Violations Poulson Drilling has reached 680 by 1021 hours. The permit called for the surface casing to be set 50 below the lime. Samples taken during drilling showed the bottom of the lime to be 599. I checked several offset wells and confirmed the bottom of the lime was consistent in this area. The permit called for approx. 760 of 7 surface casing or 50 below the lime. The surface casing was set at 650. 160 sacks of class A cement was used with 10 barrels returned.
1717291334 2019-03-08 Production Wells No Violations My inspection revealed this well consisted of a pumping unit. The caing wellhead valves were in the closed position. The tubing wellhead valves were in the open position. The well was in operation during my inspection. The tank battery consisted of 2-210 barrel tanks and 1-100 barrel tank. Legible identification was posted.
1950679237 2016-06-17 Drill / Deepen / Reopen No Violations Poulson Drilling set 250 of 9.62 conductor. The drilling bit was 14.75. 250 sacks of class A cement with 2% Gel was used with good cement returns. The cement was allowed to set for 8 hours before drilling commenced.
2009483865 2019-04-29 Production Wells No Violations My inspection revealed this well consisted of a pumping unit that was in operation during my inspection. The valves on the tubing wellhead was in the open position. The tank battery consisted of 2-210 barrel tanks and 1-50 barrel tank with legible identification.
308835914 2016-6-15 0:00: DD No Violations 6.00
961986492 2017-12-7 0:00: PW No Violations 0.40

For data sources see[7]

References