If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-133-20620 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.01,"lon":-81.16,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Portage | |
| Municipality: Atwater Township | |
| Operator Name: PIN OAK ENERGY PARTNERS LLC | |
| Well Pad ID: | |
| Farm/Lease Name: WHITTLESEY LEOLA | |
| License Status: Producing | |
| License Date: 1974-11-22 | |
| Spud Date: 1975-04-30 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 1975-07-09 | |
| Well Total Depth: 4843.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.010000 | |
| Longitude: -81.160000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1974-11-22 | 2050 ORION PETRO CORP GeoDate 11/22/74 |
| Original Spud | 1975-04-30 | 4BOPH |
| Completed | 1975-07-09 | 4BOPH |
| Reached Total Depth | 1975-07-09 | 4BOPH |
| Change of Owner | 1999-09-01 | Operator changed from 2050, ORION PETRO CORP to 169, SMAIL JAMES R INC |
| Correction to Well | 2001-08-31 | CHANGE IN DRILL UNIT FROM 112.92 ACRES TO 78.23 ACRES. |
| Change of Owner | 2018-11-29 | Operator changed from 169, JAMES R SMAIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
| Record Last Modified | 2019-06-14 | 4BOPH |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2006-09-11 | 4700 | 4713 | 0 |
| 4700 | 4713 | 0 | |
| 4700 | 4713 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 1690 Bbl | 39000 | BD @ 2500# ISIP 1100# |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1984 | ORION ENERGY CORP | 1448.00 | 182.00 | 365 |
| 1985 | ORION PETRO CORP | 2079.00 | 498.00 | 365 |
| 1986 | ORION PETRO CORP | 2073.00 | 464.00 | 365 |
| 1987 | ORION PETRO CORP | 1380.00 | 452.00 | 365 |
| 1988 | ORION PETRO CORP | 2544.00 | 557.00 | 330 |
| 1989 | ORION PETRO CORP | 3.00 | 457.00 | 365 |
| 1990 | ORION PETRO CORP | 2867.00 | 365.00 | 365 |
| 1991 | ORION PETRO CORP | 3209.00 | 289.00 | 365 |
| 1992 | ORION PETRO CORP | 3820.00 | 331.00 | 365 |
| 1993 | ORION PETRO CORP | 1546.00 | 321.00 | 365 |
| 1994 | ORION PETRO CORP | 1560.00 | 302.00 | 365 |
| 1995 | ORION PETRO CORP | 1440.00 | 229.00 | 0 |
| 1996 | ORION PETRO CORP | 1400.00 | 242.00 | 0 |
| 1997 | ORION PETRO CORP | 806.00 | 213.00 | 0 |
| 1998 | ORION PETRO CORP | 821.00 | 190.00 | 365 |
| 1999 | JAMES R SMAIL INC | 41.00 | 90.00 | 60 |
| 2000 | JAMES R SMAIL INC | 649.00 | 57.00 | 365 |
| 2001 | JAMES R SMAIL INC | 176.00 | 171.00 | 365 |
| 2002 | JAMES R SMAIL INC | 1512.00 | 209.00 | 365 |
| 2003 | JAMES R SMAIL INC | 2856.00 | 467.00 | 365 |
| 2004 | JAMES R SMAIL INC | 2298.00 | 301.00 | 365 |
| 2005 | JAMES R SMAIL INC | 1634.00 | 272.00 | 365 |
| 2006 | JAMES R SMAIL INC | 1544.00 | 278.00 | 365 |
| 2007 | JAMES R SMAIL INC | 1580.00 | 215.00 | 365 |
| 2008 | JAMES R SMAIL INC | 1093.00 | 39.00 | 365 |
| 2009 | JAMES R SMAIL INC | 971.00 | 141.00 | 365 |
| 2010 | JAMES R SMAIL INC | 1226.00 | 268.00 | 365 |
| 2011 | JAMES R SMAIL INC | 855.00 | 124.00 | 365 |
| 2012 | JAMES R SMAIL INC | 1067.00 | 188.00 | 366 |
| 2013 | JAMES R SMAIL INC | 924.00 | 150.00 | 365 |
| 2014 | JAMES R SMAIL INC | 610.00 | 135.00 | 365 |
| 2015 | JAMES R SMAIL INC | 723.00 | 173.00 | 365 |
| 2016 | JAMES R SMAIL INC | 580.00 | 125.00 | 365 |
| 2017 | JAMES R SMAIL INC | 498.00 | 103.00 | 365 |
| 2018 | JAMES R SMAIL INC | 415.00 | 154.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1984 | ORION ENERGY CORP | Brine | 0 | 365 |
| 1985 | ORION PETRO CORP | Brine | 7 | 365 |
| 1986 | ORION PETRO CORP | Brine | 6 | 365 |
| 1987 | ORION PETRO CORP | Brine | 37 | 365 |
| 1988 | ORION PETRO CORP | Brine | 114 | 330 |
| 1989 | ORION PETRO CORP | Brine | 95 | 365 |
| 1990 | ORION PETRO CORP | Brine | 35 | 365 |
| 1991 | ORION PETRO CORP | Brine | 40 | 365 |
| 1992 | ORION PETRO CORP | Brine | 40 | 365 |
| 1993 | ORION PETRO CORP | Brine | 0 | 365 |
| 1994 | ORION PETRO CORP | Brine | 40 | 365 |
| 1995 | ORION PETRO CORP | Brine | 40 | 0 |
| 1996 | ORION PETRO CORP | Brine | 0 | 0 |
| 1997 | ORION PETRO CORP | Brine | 50 | |
| 1998 | ORION PETRO CORP | Brine | 0 | 365 |
| 1999 | ORION PETRO CORP | Brine | 0 | 365 |
| 2000 | JAMES R SMAIL INC | Brine | 365 | |
| 2001 | JAMES R SMAIL INC | Brine | 365 | |
| 2002 | JAMES R SMAIL INC | Brine | 95 | 365 |
| 2003 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2004 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2005 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2006 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2007 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2008 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2009 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2010 | JAMES R SMAIL INC | Brine | 35 | 365 |
| 2011 | JAMES R SMAIL INC | Brine | 0 | 365 |
| 2012 | JAMES R SMAIL INC | Brine | 35 | 366 |
| 2013 | JAMES R SMAIL INC | Brine | 68 | 365 |
| 2014 | JAMES R SMAIL INC | Brine | 35 | 365 |
| 2015 | JAMES R SMAIL INC | Brine | 45 | 365 |
| 2016 | JAMES R SMAIL INC | Brine | 50 | 365 |
| 2017 | JAMES R SMAIL INC | Brine | 85 | 365 |
| 2018 | PIN OAK ENERGY PARTNERS LLC | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0414182223 | 2018-04-23 | Production Wells | No Violations | Status check inspection of this Clinton Sandstone well. My inspection found the well equipped with 1.5 rods and tubing and operating with the aid of a natural gas powered pumping unit. There is a domestic tap with a line heater plumbed to the 4.5 production casing and charged at 13psi. This well produces to a diked tank battery at the lease road entrance and is shared with the Roliff #1 (PN#24265). This well produces through a dedicated horizontal separator and into one (1) 100 barrel tank. Both well share a buried steel brine tank (size unknown). The chart at the meter run indicates a differential production pressure of 40psi. The required ID is posted at the wellhead and at the tank battery. No violations. |
| 1359355883 | 2005-01-11 | Production Wells | No Violations | Status check inspection indicated a release inside of the containment dike. Common tank battery with the Roliff #1 well. Contacted Smail by phone. |
| 414182223 | 2018-4-23 0:00: | PW | No Violations | 0.70 |
For data sources see[9]