X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-20717

Well Details

Well ID: 34-133-20717
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Shalersville Township
Operator Name: SARGENT HOWARD
Well Pad ID:
Farm/Lease Name: SARGENT-PULSFORD
License Status: Final Restoration
License Date: 2015-10-09
Spud Date: 1975-12-02
Spud Drilling Contractor:
Final Drill Date: 1975-12-10
Well Total Depth: 4408.00 ft
Configuration: Vertical
Latitude: 41.270000
Longitude: -81.260000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1801-01-02 277 ATWOOD ENERGY INC
Original Spud 1975-12-02
Completed 1975-12-10
Reached Total Depth 1975-12-10
CO 1991-10-23 4133 SARGENT HOWARD GeoDate
APP 2015-10-09 Proposed Formations:CLINTON, Issued Date:10/9/2015, Expired Date:10/8/2017 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2015-10-27
Construction Permit Expires 2016-10-08
Record Last Modified 2017-02-10

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 4244 4248 3
2006-09-11 4257 4299 22
4244 4248 3
4244 4248 3

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 0 500 Gal 0
H2O 0 1590 Bbl 47000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 ATWOOD ENERGY INC 3048.00 190.00 0
1985 ATWOOD ENERGY INC 1639.00 194.00 0
1986 ATWOOD ENERGY INC 1789.00 101.00 365
1987 ATWOOD ENERGY INC 999.00 184.00 365
1988 ATWOOD ENERGY INC 896.00 0.00 365
1989 ATWOOD ENERGY INC 699.00 94.00 365
1990 ATWOOD ENERGY INC 355.00 61.00 365
1991 ATWOOD ENERGY INC 810.00 82.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 ATWOOD ENERGY INC Brine 0 0
1985 ATWOOD ENERGY INC Brine 170 0
1986 ATWOOD ENERGY INC Brine 610 365
1987 ATWOOD ENERGY INC Brine 467 365
1988 ATWOOD ENERGY INC Brine 340 365
1989 ATWOOD ENERGY INC Brine 705 365
1990 ATWOOD ENERGY INC Brine 420 365
1991 ATWOOD ENERGY INC Brine 1085 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1872244818 2015-10-27 0:00 PB No Violations 5.00
0661157698 2015-11-02 Final Restoration No Violations I was on location to inspect the Final Restoration status of this recently plugged Domestic Well. The location has been graded and the area is being incorporated into the agricultural field. The production equipment was removed years ago and the lease road is the landowners access to the field. Two (2) joints of 4.5 production casing were left, at the request of the landowner, for his use and remain on location. Final Restoration is approved. No violations.
1447165825 2015-10-26 Plug / Plug Back No Violations I was on location with Nicks Well Plugging to witness the setting of the bottom plug in this Clinton Sandstone well. Nicks spotted 4.7lb/ft., 2.375 tubing at a depth of 4,300 (the hole was filled-up 10 below the bottom perforation of 4,299). Nicks rigged up to the tubing, established circulation, and then mixed and pumped 6.3 barrels of cement slurry. They displaced the slurry to a depth of 3,944 with 15.2 barrels of water and pulled the tubing from the hole. The wellhead was packed in and operations were shut down until 10/27/15. See plugging report for more details on this job. No violations.
1872244818 2015-10-27 Plug / Plug Back No Violations I was on location with Nicks Well Plugging to witness plugging operations. Nicks ran in the hole with the knife tool and ripped the 4.5 production casing at a depth of 2773. Plugs were set at the top of the Big Lime, across the Berea Sandstone-Ohio Shale interval, and across the Glacial Deposits. Good circulation was established prior to setting each plug, and good cement circulated to surface on the final plug. The hole was topped off with 5 sacks of cement and the cement held at the top of the hole. See plugging report for more details on this job. No violations.
661157698 2015-11-2 0:00: FR No Violations 1.00

For data sources see[9]

References