If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-20911 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.28,"lon":-81.14,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Hiram Township | |
Operator Name: EQUITY OIL & GAS FUNDS INC | |
Well Pad ID: | |
Farm/Lease Name: SPROGIS G& I | |
License Status: Producing | |
License Date: 1976-10-08 | |
Spud Date: 1976-10-14 | |
Spud Drilling Contractor: | |
Final Drill Date: 1976-10-21 | |
Well Total Depth: 4250.00 ft | |
Configuration: Vertical | |
Latitude: 41.280000 | |
Longitude: -81.140000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1976-10-08 | 9 EDC GeoDate 10/8/76 |
Original Spud | 1976-10-14 | |
Completed | 1976-10-21 | |
Reached Total Depth | 1976-10-21 | |
Change of Owner | 2007-06-13 | Operator changed from 9, POWER GAS MARKETING & TRANS to 1171, EQUITY OIL & GAS FUNDS IN |
Record Last Modified | 2019-06-04 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4120 | 4164 | 88 |
4120 | 4164 | 88 | |
4120 | 4164 | 88 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 58500 Gal | 77500 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0944408739 | 2018-08-06 | Production Wells | No Violations | Status check inspection of this Clinton Sandstone well. My inspection found the wellhead equipped with 2.375 tubing and operating with the aid of a plunger lift system. Gauges indicate 400psi on the tubing and 510psi on the 4.5 production casing. There is a domestic tap and meter plumbed to the casing port and is charged at 19psi. This well produces to a diked tank battery on location and contains one (1) 210 barrel tank, a 50 barrel poly tank, and a horizontal separator. The required ID is posted at the tank battery. No violations. |
944408739 | 2018-8-6 0:00:0 | PW | No Violations | 0.40 |
For data sources see[9]