If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-22492 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.19,"lon":-81.3,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Franklin Township | |
Operator Name: CRUISE ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: CRUISE | |
License Status: Producing | |
License Date: 1980-12-31 | |
Spud Date: 1981-02-24 | |
Spud Drilling Contractor: | |
Final Drill Date: 1981-03-03 | |
Well Total Depth: 4318.00 ft | |
Configuration: Vertical | |
Latitude: 41.190000 | |
Longitude: -81.300000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1980-12-31 | 2125 EASTERN PETROLEUM CO GeoDate 12/31/80 |
Oil and Gas | 1980-12-31 | Issued Date 12/31/80 Expired Date Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
Original Spud | 1981-02-24 | |
Completed | 1981-03-03 | |
Reached Total Depth | 1981-03-03 | |
Completion Report Received | 1981-12-16 | |
CO | 1995-02-28 | 3028 CRUISE RAY,LARRY & BLAIR GeoDate 12/31/80 |
Record Last Modified | 2013-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4140 | 4170 | 16 |
4140 | 4170 | 16 | |
4140 | 4170 | 16 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1490 Bbl | 40000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | GASEARCH INC | 3520.00 | 0.00 | 365 |
1985 | GASEARCH INC | 1135.00 | 0.00 | 365 |
1986 | EASTERN PETROLEUM CO | 11204.00 | 96.00 | 365 |
1987 | EASTERN PETROLEUM CO | 12739.00 | 138.00 | 365 |
1988 | EASTERN PETROLEUM CO | 7531.00 | 75.00 | 365 |
1989 | EASTERN PETROLEUM CO | 5330.00 | 100.00 | 365 |
1990 | EASTERN PETROLEUM CO | 6303.00 | 94.00 | 365 |
1992 | EASTERN PETROLEUM CO | 3474.00 | 131.00 | 365 |
1993 | EASTERN PETROLEUM CO | 1390.00 | 0.00 | 365 |
1995 | CRUISE ENERGY INC | 5151.00 | 54.00 | 188 |
1996 | CRUISE ENERGY INC | 5691.00 | 142.00 | 365 |
1997 | CRUISE ENERGY INC | 3499.00 | 104.00 | 365 |
1998 | CRUISE ENERGY INC | 2163.00 | 21.00 | 365 |
2006 | CRUISE ENERGY INC | 4721.00 | 99.00 | 219 |
2007 | CRUISE ENERGY INC | 5626.00 | 88.00 | 365 |
2008 | CRUISE ENERGY INC | 2464.00 | 0.00 | 365 |
2009 | CRUISE ENERGY INC | 1744.00 | 0.00 | 365 |
2010 | CRUISE ENERGY INC | 3019.00 | 78.00 | 365 |
2011 | CRUISE ENERGY INC | 4387.00 | 97.00 | 365 |
2012 | CRUISE ENERGY INC | 2495.00 | 63.00 | 366 |
2014 | CRUISE ENERGY INC | 1962.00 | 73.00 | 365 |
2015 | CRUISE ENERGY INC | 52.00 | 0.00 | 30 |
2016 | CRUISE ENERGY INC | 0.00 | 0.00 | 0 |
2017 | CRUISE ENERGY INC | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | GASEARCH INC | Brine | 0 | 365 |
1985 | GASEARCH INC | Brine | 105 | 365 |
1986 | EASTERN PETROLEUM CO | Brine | 1410 | 365 |
1987 | EASTERN PETROLEUM CO | Brine | 835 | 365 |
1988 | EASTERN PETROLEUM CO | Brine | 1160 | 365 |
1989 | EASTERN PETROLEUM CO | Brine | 830 | 365 |
1990 | EASTERN PETROLEUM CO | Brine | 1180 | 365 |
1992 | EASTERN PETROLEUM CO | Brine | 667 | 365 |
1993 | EASTERN PETROLEUM CO | Brine | 320 | 365 |
1995 | CRUISE ENERGY INC | Brine | 95 | 188 |
1996 | CRUISE ENERGY INC | Brine | 830 | 365 |
1997 | CRUISE ENERGY INC | Brine | 745 | 365 |
1998 | CRUISE ENERGY INC | Brine | 526 | 365 |
2006 | CRUISE ENERGY INC | Brine | 875 | 219 |
2007 | CRUISE ENERGY INC | Brine | 535 | 365 |
2008 | CRUISE ENERGY INC | Brine | 380 | 365 |
2009 | CRUISE ENERGY INC | Brine | 590 | 365 |
2010 | CRUISE ENERGY INC | Brine | 715 | 365 |
2011 | CRUISE ENERGY INC | Brine | 655 | 365 |
2012 | CRUISE ENERGY INC | Brine | 645 | 366 |
2014 | CRUISE ENERGY INC | Brine | 678 | 365 |
2015 | CRUISE ENERGY INC | Brine | 423 | 30 |
2016 | CRUISE ENERGY INC | Brine | 249 | 0 |
2017 | CRUISE ENERGY INC | Brine | 246 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1129649085 | 2005-10-03 | Production Wells | Violations Noted | During a status check inspection of this well it was apparent that the owner had overfilled the stock tank and impacted ground surface underlying the tank battery. Oil and brine were ponded on the surface. Action had been initiated to remediate the spill by cutting collection channels in the surface and removing the accumulated oil. Additional work needs to be completed to finish the job. Once the free oil has been recovered, impacted soil will need to be removed and replaced. |
1471305189 | 2005-10-03 | Production Wells | No Violations | FOLLOW UP TO NOV # 1129649085 During a status check inspection of this well it was apparent that the owner had overfilled the stock tank and impacted ground surface underlying the tank battery. Oil and brine were ponded on the surface. Action had been initiated to remediate the spill by cutting collection channels in the surface and removing the accumulated oil. Additional work needs to be completed to finish the job. Once the free oil has been recovered, impacted soil will need to be removed and replaced. |
1489559377 | 2012-08-01 | Production Wells | No Violations | FOLLOW UP TO NOV # 1471305189. The impacted area has been reclaimed. Ray and Larry Cruise joined me during the inspection. The well is equipped with a pumping unit and has a domestic hook up on the 8.625 annulus. The tank battery consists of 1-100 barrel stock tank, a 50 barrel poly tank, and a cement brine vault. Both tanks and the vault were full and I told the Cruise brothers that they needed to be emptied immediately to avoid having them overflow containment. The top of the pressure gauge on the domestic feed was blown out and venting gas and they were told to correct the problem immediately. The well was shut-in at the time of inspection as they were waiting on parts to address some issues with the well. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1129649085 | US-OH-103288 | 2005-10-18 | Well operation causing pollution and contamination |
For data sources see[9]