If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-133-22959 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.33,"lon":-81.26,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Portage | |
| Municipality: Mantua Township | |
| Operator Name: PETROX, INC | |
| Well Pad ID: | |
| Farm/Lease Name: HUGO SAND CO INC | |
| License Status: Producing | |
| License Date: 1985-10-16 | |
| Spud Date: 1985-11-14 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 1985-11-22 | |
| Well Total Depth: 4223.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.330000 | |
| Longitude: -81.260000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Oil and Gas | 1982-11-04 | Issued Date 11/4/82 Expired Date 5/3/83 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
| CO | 1985-10-16 | 182 BELDEN & BLAKE CO GeoDate 10/16/85 |
| Oil and Gas | 1985-10-16 | Issued Date 10/16/85 Expired Date 10/16/86 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 04223 Proposed Drill Depth 04223 |
| Original Spud | 1985-11-14 | R.I. 10-19-85 |
| Completed | 1985-11-22 | R.I. 10-19-85 |
| Reached Total Depth | 1985-11-22 | R.I. 10-19-85 |
| CO | 1986-03-21 | 182 BELDEN & BLAKE CO GeoDate 11/4/82 |
| Completion Report Received | 1986-08-04 | R.I. 10-19-85 |
| Construction Permit Expires | 1986-10-16 | R.I. 10-19-85 |
| Change of Owner | 2002-08-09 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 1966, PETROX INC |
| Record Last Modified | 2017-02-15 | R.I. 10-19-85 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2006-09-11 | 4016 | 4100 | 22 |
| 4016 | 4100 | 22 | |
| 4016 | 4100 | 22 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 110000 Gal | 55000 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1986 | BELDEN & BLAKE CORPORATION | 3434.00 | 911.00 | 365 |
| 1987 | BELDEN & BLAKE CORPORATION | 4434.00 | 709.00 | 365 |
| 1988 | BELDEN & BLAKE CORPORATION | 2832.00 | 503.00 | 332 |
| 1990 | BELDEN & BLAKE CORPORATION | 2091.00 | 319.00 | 341 |
| 1991 | BELDEN & BLAKE CORPORATION | 1758.00 | 293.00 | 365 |
| 1992 | BELDEN & BLAKE CORPORATION | 1821.00 | 229.00 | 349 |
| 1993 | BELDEN & BLAKE CORPORATION | 1539.00 | 0.00 | 348 |
| 1994 | BELDEN & BLAKE CORPORATION | 1279.00 | 277.00 | 356 |
| 1995 | BELDEN & BLAKE CORPORATION | 1533.00 | 160.00 | 344 |
| 1996 | BELDEN & BLAKE CORPORATION | 1425.00 | 162.00 | 301 |
| 1997 | BELDEN & BLAKE CORPORATION | 1518.00 | 0.00 | 344 |
| 1998 | BELDEN & BLAKE CORPORATION | 1199.00 | 296.00 | 323 |
| 1999 | BELDEN & BLAKE CORPORATION | 827.00 | 0.00 | 344 |
| 2000 | BELDEN & BLAKE CORPORATION | 788.00 | 238.00 | 293 |
| 2001 | BELDEN & BLAKE CORPORATION | 725.00 | 116.00 | 346 |
| 2002 | BELDEN & BLAKE CORPORATION | 445.00 | 142.00 | 194 |
| 2003 | PETROX, INC | 780.00 | 94.00 | 365 |
| 2004 | PETROX, INC | 722.00 | 127.00 | 365 |
| 2005 | PETROX, INC | 765.00 | 102.00 | 365 |
| 2006 | PETROX, INC | 990.00 | 0.00 | 365 |
| 2007 | PETROX, INC | 1378.00 | 0.00 | 365 |
| 2008 | PETROX, INC | 1507.00 | 118.00 | 365 |
| 2009 | PETROX, INC | 1103.00 | 95.00 | 365 |
| 2010 | PETROX, INC | 1307.00 | 100.00 | 365 |
| 2011 | PETROX, INC | 1447.00 | 112.00 | 365 |
| 2012 | PETROX, INC | 1356.00 | 108.00 | 366 |
| 2013 | PETROX, INC | 277.00 | 92.00 | 365 |
| 2014 | PETROX, INC | 139.00 | 124.00 | 365 |
| 2015 | PETROX, INC | 115.00 | 7.00 | 365 |
| 2016 | PETROX, INC | 117.00 | 100.00 | 365 |
| 2017 | PETROX, INC | 128.00 | 88.00 | 365 |
| 2018 | PETROX, INC | 31.00 | 84.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1986 | BELDEN & BLAKE CORPORATION | Brine | 4570 | 365 |
| 1987 | BELDEN & BLAKE CORPORATION | Brine | 862 | 365 |
| 1988 | BELDEN & BLAKE CORPORATION | Brine | 658 | 332 |
| 1990 | BELDEN & BLAKE CORPORATION | Brine | 366 | 341 |
| 1991 | BELDEN & BLAKE CORPORATION | Brine | 534 | 365 |
| 1992 | BELDEN & BLAKE CORPORATION | Brine | 506 | 349 |
| 1993 | BELDEN & BLAKE CORPORATION | Brine | 464 | 348 |
| 1994 | BELDEN & BLAKE CORPORATION | Brine | 235 | 356 |
| 1995 | BELDEN & BLAKE CORPORATION | Brine | 300 | 344 |
| 1996 | BELDEN & BLAKE CORPORATION | Brine | 357 | 301 |
| 1997 | BELDEN & BLAKE CORPORATION | Brine | 297 | 344 |
| 1998 | BELDEN & BLAKE CORPORATION | Brine | 135 | 323 |
| 1999 | BELDEN & BLAKE CORPORATION | Brine | 340 | 344 |
| 2000 | BELDEN & BLAKE CORPORATION | Brine | 265 | 293 |
| 2001 | BELDEN & BLAKE CORPORATION | Brine | 505 | 346 |
| 2002 | PETROX, INC | Brine | 463 | 28 |
| 2003 | PETROX, INC | Brine | 302 | 365 |
| 2004 | PETROX, INC | Brine | 332 | 365 |
| 2005 | PETROX, INC | Brine | 288 | 365 |
| 2006 | PETROX, INC | Brine | 0 | 365 |
| 2007 | PETROX, INC | Brine | 365 | |
| 2008 | PETROX, INC | Brine | 426 | 365 |
| 2009 | PETROX, INC | Brine | 402 | 365 |
| 2010 | PETROX, INC | Brine | 339 | 365 |
| 2011 | PETROX, INC | Brine | 303 | 365 |
| 2012 | PETROX, INC | Brine | 294 | 366 |
| 2013 | PETROX, INC | Brine | 310 | 365 |
| 2014 | PETROX, INC | Brine | 461 | 365 |
| 2015 | PETROX, INC | Brine | 318 | 365 |
| 2016 | PETROX, INC | Brine | 334 | 365 |
| 2017 | PETROX, INC | Brine | 466 | 365 |
| 2018 | PETROX, INC | Brine | 197 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 0523212296 | 2018-07-11 | Production Wells | No Violations | Status check inspection of this Clinton Sandstone well. My inspection found the wellhead equipped with 2,375 tubing and rods and operating with the aid of an electric powered pumping unit. The wellhead is fenced and locked and an ID placard is posted on the fencing. This well produces to a diked and fenced tank battery to the south, along the lease road, and contains one (1) 210 barrel tank, a concrete brine vault, and a vertical separator with an associated meter run. The chart at the meter box indicates a differential production pressure of 35psi and the required ID is posted on the tank. No violations. |
| 523212296 | 2018-7-11 0:00: | PW | No Violations | 0.70 |
For data sources see[9]