X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-23882

Well Details

Well ID: 34-133-23882
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Berlin Township
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: OLLIS UNIT
License Status: Producing
License Date: 1991-10-30
Spud Date: 1992-01-23
Spud Drilling Contractor: CUBBY DRLG
Final Drill Date: 1992-01-27
Well Total Depth: 5056.00 ft
Configuration: Vertical
Latitude: 41.030000
Longitude: -81.000000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1991-10-30 84 EVERFLOW EASTERN PTNS L P GeoDate 10/30/91
Oil and Gas 1991-10-30 Issued Date 10/30/91 Expired Date 10/29/92 Acres 0053160 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05056 Proposed Drill Depth 05056
Original Spud 1992-01-23
Completed 1992-01-27
Reached Total Depth 1992-01-27
CO 1992-01-31 198 VIKING RESOURCES CORP GeoDate 10/30/91
Completion Report Received 1992-02-20
CO 1992-06-01 84 EVERFLOW EASTERN PTNS L P GeoDate 10/30/91
Construction Permit Expires 1992-10-29
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4846 4976 0
4846 4976 0
2006-09-11 4863 4931 45
4863 4931 45
4846 4976 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
0 0 0 FRAC'D

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1992 EVERFLOW EASTERN PARTNERS LP 12773.00 1398.00 173
1994 EVERFLOW EASTERN PARTNERS LP 10770.00 1005.00 365
1995 EVERFLOW EASTERN PARTNERS LP 8826.00 707.00 365
1996 EVERFLOW EASTERN PARTNERS LP 7187.00 843.00 365
1997 EVERFLOW EASTERN PARTNERS LP 6671.00 682.00 365
1998 EVERFLOW EASTERN PARTNERS LP 4607.00 517.00 365
1999 EVERFLOW EASTERN PARTNERS LP 5150.00 589.00 365
2000 EVERFLOW EASTERN PARTNERS LP 4922.00 493.00 365
2001 EVERFLOW EASTERN PARTNERS LP 5646.00 475.00 365
2002 EVERFLOW EASTERN PARTNERS LP 5404.00 364.00 365
2003 EVERFLOW EASTERN PARTNERS LP 4997.00 416.00 365
2004 EVERFLOW EASTERN PARTNERS LP 6037.00 350.00 365
2005 EVERFLOW EASTERN PARTNERS LP 5520.00 487.00 365
2006 EVERFLOW EASTERN PARTNERS LP 6018.00 368.00 365
2007 EVERFLOW EASTERN PARTNERS LP 5846.00 336.00 365
2008 EVERFLOW EASTERN PARTNERS LP 3723.00 336.00 365
2009 EVERFLOW EASTERN PARTNERS LP 3531.00 370.00 365
2010 EVERFLOW EASTERN PARTNERS LP 2988.00 225.00 365
2011 EVERFLOW EASTERN PARTNERS LP 3670.00 354.00 365
2012 EVERFLOW EASTERN PARTNERS LP 3655.00 238.00 366
2013 EVERFLOW EASTERN PARTNERS LP 4312.00 357.00 365
2014 EVERFLOW EASTERN PARTNERS LP 3489.00 247.00 365
2015 EVERFLOW EASTERN PARTNERS LP 2752.00 221.00 365
2016 EVERFLOW EASTERN PARTNERS LP 2918.00 249.00 365
2017 EVERFLOW EASTERN PARTNERS LP 2722.00 355.00 365
2018 EVERFLOW EASTERN PARTNERS LP 2757.00 244.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1992 EVERFLOW EASTERN PARTNERS LP Brine 4780 173
1994 EVERFLOW EASTERN PARTNERS LP Brine 85 365
1995 EVERFLOW EASTERN PARTNERS LP Brine 215 365
1996 EVERFLOW EASTERN PARTNERS LP Brine 85 365
1997 EVERFLOW EASTERN PARTNERS LP Brine 29 365
1998 EVERFLOW EASTERN PARTNERS LP Brine 30 365
1999 EVERFLOW EASTERN PARTNERS LP Brine 30 365
2000 EVERFLOW EASTERN PARTNERS LP Brine 50 365
2001 EVERFLOW EASTERN PARTNERS LP Brine 54 365
2002 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2003 EVERFLOW EASTERN PARTNERS LP Brine 40 365
2004 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2005 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2006 EVERFLOW EASTERN PARTNERS LP Brine 50 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 49 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2011 EVERFLOW EASTERN PARTNERS LP Brine 25 365
2012 EVERFLOW EASTERN PARTNERS LP Brine 0 366
2013 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2014 EVERFLOW EASTERN PARTNERS LP Brine 60 365
2015 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-558911507 2017-11-20 0:00 PW No Violations 0.50
0000014425 Preliminary Restoration No Violations PASSED Y WITNESSED 10/9/92 INSPECTOR KEITH WHITE DATE 10/0919/92 DATA FROM OLD VAX INFO
0000PL5757 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0558911507 2017-11-20 Production Wells No Violations Status check inspection of this Clinton Sandstone well. My inspection found the wellhead fenced and locked with ID posted on the fencing. The wellhead is equipped with 2.375 rods and tubing and an electric powered pumping unit. The flow line valves off the 4.5 production casing and tubing tee are open The well produces to a fenced, locked, and diked tank battery on location. The battery contains one (1) 210 barrel tank, one (1) 50 barrel tank, and a horizontal separator. The required ID is posted on the fencing. No violations.
14425 PL No Violations
PL5757 PL No Violations

For data sources see[9]

References