If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-24117 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.14,"lon":-81.23,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Ravenna Township | |
Operator Name: BECK ENERGY CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: CITY OF RAVENNA # 1 | |
License Status: Producing | |
License Date: 1997-04-30 | |
Spud Date: 1997-06-10 | |
Spud Drilling Contractor: ROSE RUN DRILLING | |
Final Drill Date: 1997-06-15 | |
Well Total Depth: 4416.00 ft | |
Configuration: Vertical | |
Latitude: 41.140000 | |
Longitude: -81.230000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1997-04-30 | Issued Date 4/30/97 Expired Date 4/30/98 Acres 0040970 Tool Type RTAF Proposed Formation CLINTON Proposed Depth Proposed Drill Depth |
Original Spud | 1997-06-10 | RBDMS Rec |
Completed | 1997-06-15 | RBDMS Rec |
Reached Total Depth | 1997-06-15 | RBDMS Rec |
Correction to Well | 1997-07-28 | Change in Drill Acres: 40.61 |
Completion Report Received | 1998-01-26 | RBDMS Rec |
Correction to Well | 2001-04-13 | CHANGE IN FOOTAGE DESCRIPTION TO "535'NL & 310'WL OF LOT 18, SOUTH DIVISION" AND CHANGE IN UNIT SIZE TO 91.71 ACRES. |
Record Last Modified | 2019-06-14 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1998-03-17 | 4256 | 4308 | 0 |
4256 | 4308 | 0 | |
4256 | 4308 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 92590 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1997 | BECK ENERGY CORPORATION | 979.00 | 1082.00 | 156 |
1998 | BECK ENERGY CORPORATION | 5059.00 | 1711.00 | 365 |
1999 | BECK ENERGY CORPORATION | 7206.00 | 1463.00 | 0 |
2000 | BECK ENERGY CORPORATION | 10482.00 | 1348.00 | 0 |
2001 | BECK ENERGY CORPORATION | 9026.00 | 1259.00 | 365 |
2002 | BECK ENERGY CORPORATION | 7989.00 | 595.00 | 365 |
2003 | BECK ENERGY CORPORATION | 9466.00 | 421.00 | 365 |
2004 | BECK ENERGY CORPORATION | 9156.00 | 483.00 | 365 |
2005 | BECK ENERGY CORPORATION | 7986.00 | 308.00 | 365 |
2006 | BECK ENERGY CORPORATION | 7201.00 | 360.00 | 365 |
2007 | BECK ENERGY CORPORATION | 6996.00 | 321.00 | 365 |
2008 | BECK ENERGY CORPORATION | 6190.00 | 363.00 | 365 |
2009 | BECK ENERGY CORPORATION | 6426.00 | 286.00 | 365 |
2010 | BECK ENERGY CORPORATION | 6105.00 | 279.00 | 365 |
2011 | BECK ENERGY CORPORATION | 5582.00 | 261.00 | 365 |
2012 | BECK ENERGY CORPORATION | 5755.00 | 266.00 | 366 |
2013 | BECK ENERGY CORPORATION | 5524.00 | 211.00 | 365 |
2014 | BECK ENERGY CORPORATION | 4577.00 | 199.00 | 365 |
2015 | BECK ENERGY CORPORATION | 3305.00 | 169.00 | 365 |
2016 | BECK ENERGY CORPORATION | 4443.00 | 122.00 | 365 |
2017 | BECK ENERGY CORPORATION | 3496.00 | 110.00 | 365 |
2018 | BECK ENERGY CORPORATION | 3237.00 | 160.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1997 | BECK ENERGY CORPORATION | Brine | 1084 | 156 |
1998 | BECK ENERGY CORPORATION | Brine | 262 | 365 |
1999 | BECK ENERGY CORPORATION | Brine | 308 | |
2000 | BECK ENERGY CORPORATION | Brine | 410 | |
2001 | BECK ENERGY CORPORATION | Brine | 305 | 365 |
2002 | BECK ENERGY CORPORATION | Brine | 338 | 365 |
2003 | BECK ENERGY CORPORATION | Brine | 222 | 365 |
2004 | BECK ENERGY CORPORATION | Brine | 155 | 365 |
2005 | BECK ENERGY CORPORATION | Brine | 110 | 365 |
2006 | BECK ENERGY CORPORATION | Brine | 101 | 365 |
2007 | BECK ENERGY CORPORATION | Brine | 122 | 365 |
2008 | BECK ENERGY CORPORATION | Brine | 100 | 365 |
2009 | BECK ENERGY CORPORATION | Brine | 95 | 365 |
2010 | BECK ENERGY CORPORATION | Brine | 50 | 365 |
2011 | BECK ENERGY CORPORATION | Brine | 61 | 365 |
2012 | BECK ENERGY CORPORATION | Brine | 72 | 366 |
2013 | BECK ENERGY CORPORATION | Brine | 52 | 365 |
2014 | BECK ENERGY CORPORATION | Brine | 43 | 365 |
2015 | BECK ENERGY CORPORATION | Brine | 50 | 365 |
2016 | BECK ENERGY CORPORATION | Brine | 40 | 365 |
2017 | BECK ENERGY CORPORATION | Brine | 27 | 365 |
2018 | BECK ENERGY CORPORATION | Brine | 40 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0234445692 | 2018-12-28 | UrbanProduction Wells | No Violations | Status check inspection of this Clinton Sandstone well. My inspection found the wellhead fenced, equipped with 1.5 tubing, and operating with the aid of a plunger lift system. The 4.5 production casing and flow line is currently disconnected and the valve is closed. This well produces to a diked, fenced, and locked tank battery on location that is shared with the City of Ravenna #2 (PN# 24248). The battery contains shared equipment consisting of one (1) 210 barrel tank, a 35 barrel poly tank, and one (1) horizontal separator. The chart indicates a differential production pressure of 50psi and the load line on the tank is locked. The lease road is gated and locked and the required ID is posted at the wellhead and at the tank battery. This well was drilled prior to the passage of HB278 and due to its remote location and the presence of a locked access gate, urban requirements will not be enforced at this time. No violations. |
234445692 | 2018-12-28 0:00 | UP | No Violations | 0.40 |
iANGE00059 | 1997-10-08 | Preliminary Restoration | No Violations | |
iANGE000594 | 1997-10-8 0:00: | PL | No Violations |
For data sources see[9]