If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-133-24313 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.25,"lon":-81.12,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Portage | |
| Municipality: Freedom Township | |
| Operator Name: CEDAR VALLEY ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: HURLEY/DZURILLA UNIT | |
| License Status: Producing | |
| License Date: 2006-05-12 | |
| Spud Date: 2006-06-21 | |
| Spud Drilling Contractor: CAPSTAR DRILLING | |
| Final Drill Date: 2006-06-28 | |
| Well Total Depth: 4519.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.250000 | |
| Longitude: -81.120000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2006-05-12 | Proposed Formations:CLINTON, Issued Date:5/12/2006, Expired Date:5/12/2007 6:00:00 AM, Drilling unit acres:180.484, Proposed Well Type:OG, Proposed Well Class:POOL |
| Original Spud | 2006-06-21 | RBDMS Rec |
| Completed | 2006-06-28 | RBDMS Rec |
| Reached Total Depth | 2006-06-28 | RBDMS Rec |
| Completion Report Received | 2006-10-24 | RBDMS Rec |
| Construction Permit Expires | 2007-05-12 | RBDMS Rec |
| Correction to Well | 2008-09-19 | UNIT SIZE DECREASED TO 179.654 ACRES. |
| Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2007-01-04 | 4302 | 4407 | 32 |
| 4302 | 4407 | 32 | |
| 4302 | 4407 | 32 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 15 | 71747 Gal | 75000 | 500 GALLONS HCL ACID |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2006 | CEDAR VALLEY ENERGY INC | 63.00 | 590.00 | 28 |
| 2007 | CEDAR VALLEY ENERGY INC | 2765.00 | 1584.00 | 365 |
| 2008 | CEDAR VALLEY ENERGY INC | 2495.00 | 1389.00 | 365 |
| 2009 | CEDAR VALLEY ENERGY INC | 1748.00 | 873.00 | 365 |
| 2010 | CEDAR VALLEY ENERGY INC | 1666.00 | 833.00 | 365 |
| 2011 | CEDAR VALLEY ENERGY INC | 1780.00 | 772.00 | 365 |
| 2012 | CEDAR VALLEY ENERGY INC | 1506.00 | 565.00 | 366 |
| 2013 | CEDAR VALLEY ENERGY INC | 1207.00 | 608.00 | 365 |
| 2014 | CEDAR VALLEY ENERGY INC | 1288.00 | 573.00 | 365 |
| 2015 | CEDAR VALLEY ENERGY INC | 1107.00 | 523.00 | 365 |
| 2016 | CEDAR VALLEY ENERGY INC | 1013.00 | 362.00 | 365 |
| 2017 | CEDAR VALLEY ENERGY INC | 992.00 | 389.00 | 365 |
| 2018 | CEDAR VALLEY ENERGY INC | 876.00 | 377.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2006 | CEDAR VALLEY ENERGY INC | Brine | 523 | 28 |
| 2007 | CEDAR VALLEY ENERGY INC | Brine | 1062 | 365 |
| 2008 | CEDAR VALLEY ENERGY INC | Brine | 1582 | 365 |
| 2009 | CEDAR VALLEY ENERGY INC | Brine | 904 | 365 |
| 2010 | CEDAR VALLEY ENERGY INC | Brine | 959 | 365 |
| 2011 | CEDAR VALLEY ENERGY INC | Brine | 986 | 365 |
| 2012 | CEDAR VALLEY ENERGY INC | Brine | 803 | 366 |
| 2013 | CEDAR VALLEY ENERGY INC | Brine | 957 | 365 |
| 2014 | CEDAR VALLEY ENERGY INC | Brine | 1131 | 365 |
| 2015 | CEDAR VALLEY ENERGY INC | Brine | 1089 | 365 |
| 2016 | CEDAR VALLEY ENERGY INC | Brine | 729 | 365 |
| 2017 | CEDAR VALLEY ENERGY INC | Brine | 1236 | 365 |
| 2018 | CEDAR VALLEY ENERGY INC | Brine | 733 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -693453500 | 2017-10-2 0:00: | PW | No Violations | 0.60 |
| -934666307 | 2006-6-19 0:00: | DD | No Violations | |
| 0693453500 | 2017-10-02 | Production Wells | No Violations | Status check inspection of this Clinton Sandstone well. My inspection found the wellhead equipped with 2.375 production tubing and operating with the aid of an electric powered pumping unit. The required ID is posted on the pumping unit. The well produces to a diked tank battery to the east and is shared with the #s 1, 3, & 4 (PN#s 4302, 4337, & 4339). The battery contains two (2) 210 barrel tanks, one (1) 100 barrel tank, and a horizontal separator. The chart at the separator indicates a differential production pressure of 60psi and the required ID is posted at the battery. No violations. |
| 0934666307 | 2006-06-19 | Drill / Deepen / Reopen | No Violations | The location has been built and the pits dug and lined. Waiting for the drilling rig. No violations at this time. |
| 1152102871 | 2006-06-26 | Drill / Deepen / Reopen | No Violations | Capstar is drilling ahead. The pits are lined and in good condition. No violations at this time. |
| 1681609917 | 2009-05-21 | Production Wells | No Violations | The quality of the restoration after completing a stripping job on this well is poor. I will contact Cedar Valley for an on site meeting. |
| 2088795246 | 2007-01-09 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
For data sources see[9]