Well Details

Well ID: 34-133-24341
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Freedom Township
Operator Name: CEDAR VALLEY ENERGY INC
Well Pad ID:
Farm/Lease Name: VISOCAN/SCHWENK
License Status: Producing
License Date: 2007-06-12
Spud Date: 2007-07-10
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 2007-07-15
Well Total Depth: 4505.00 ft
Configuration: Vertical
Latitude: 41.240000
Longitude: -81.100000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2007-06-12 Proposed Formations:CLINTON, Issued Date:6/12/2007, Expired Date:6/11/2008 6:00:00 AM, Drilling unit acres:173.42, Proposed Well Type:OG, Proposed Well Class:POOL
Completed 2007-07-15
Reached Total Depth 2007-07-15
Completion Report Received 2007-11-23
Construction Permit Expires 2008-06-11
Correction to Well 2010-01-22 UNIT SIZE DECREASED TO 4O ACRES.
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-03-13 4315 4408 42
4315 4408 42
4315 4408 42

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 82295 Gal 50000 FRAC ALSO USED 75 MSCF OF N2

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2007 CEDAR VALLEY ENERGY INC 0.00 729.00 90
2008 CEDAR VALLEY ENERGY INC 2238.00 1110.00 365
2009 CEDAR VALLEY ENERGY INC 869.00 600.00 365
2010 CEDAR VALLEY ENERGY INC 826.00 640.00 365
2011 CEDAR VALLEY ENERGY INC 224.00 481.00 365
2012 CEDAR VALLEY ENERGY INC 583.00 495.00 366
2013 CEDAR VALLEY ENERGY INC 402.00 479.00 365
2014 CEDAR VALLEY ENERGY INC 370.00 310.00 365
2015 CEDAR VALLEY ENERGY INC 605.00 423.00 365
2016 CEDAR VALLEY ENERGY INC 166.00 317.00 365
2017 CEDAR VALLEY ENERGY INC 0.00 278.00 365
2018 CEDAR VALLEY ENERGY INC 0.00 337.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2007 CEDAR VALLEY ENERGY INC Brine 868 90
2008 CEDAR VALLEY ENERGY INC Brine 2591 365
2009 CEDAR VALLEY ENERGY INC Brine 816 365
2010 CEDAR VALLEY ENERGY INC Brine 607 365
2011 CEDAR VALLEY ENERGY INC Brine 396 365
2012 CEDAR VALLEY ENERGY INC Brine 368 366
2013 CEDAR VALLEY ENERGY INC Brine 395 365
2014 CEDAR VALLEY ENERGY INC Brine 286 365
2015 CEDAR VALLEY ENERGY INC Brine 442 365
2016 CEDAR VALLEY ENERGY INC Brine 607 365
2017 CEDAR VALLEY ENERGY INC Brine 521 365
2018 CEDAR VALLEY ENERGY INC Brine 410 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-736194324 2008-1-23 0:00: PW No Violations
0511794096 2008-09-23 Preliminary Restoration No Violations Preliminary restoration is approved.
0736194324 2008-01-23 Production Wells No Violations Status check inspection. Preliminary restoration will be approved as soon as the vegetation establishes and the pile of rods and joints of tubing are removed.
1523887714 2018-04-06 Production Wells No Violations Follow-up to Complaint #5816 concerning erosion in an agricultural field on location. It was determined on 3/23/18 that the erosion occurring 600 east of the lease road was not caused by oil & gas activity at this site. I met on location today with Regional Supervisor Tom Hill and Cedar Valley Field Superintendent Tim Cosma. We walked the lease road and discussed the instability issues along the road both north and south of the low drainage area that are causing sedimentation. The lease road is shared by Cedar Valley and Northwood Energy Corp. for access to the wellheads on this property. Tim agreed that the furrowed areas of unbound soil and rock on both sides of the road need to be graded out and seeded. He is willing to work with Northwood to address these issues and agreed that the road should not be driven on during the spring thaw out. This work should be done when the area dries out in May or early June. I have spoken with Northwood about the issue and they will meet with me on location at the end of April to go over what needs to be done. I will continue to follow-up on progress when the work begins.
1528300541 2018-06-06 Production Wells No Violations Status check inspection of this Clinton Sandstone well. My inspection found the wellhead equipped with 2.375 rods and tubing and operating with the aid of an electric powered pumping unit. This well produces to a diked tank battery to the south at the lease road entrance. The battery contains one (1) 210 barrel tank, one (1) 100 barrel tank, and a horizontal separator with an associated meter run. The required ID is posted at the wellhead and at the tank battery. The lease road is now stable and the erosion issues in the agricultural field (not oil & gas related) have been mitigated. No violations.
1573559560 2007-07-31 Drill / Deepen / Reopen No Violations The drilling pits have been closed. No violations at this time.
511794096 2008-9-23 0:00: PL No Violations

For data sources see[9]