If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-133-24341 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.24,"lon":-81.1,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Portage | |
| Municipality: Freedom Township | |
| Operator Name: CEDAR VALLEY ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: VISOCAN/SCHWENK | |
| License Status: Producing | |
| License Date: 2007-06-12 | |
| Spud Date: 2007-07-10 | |
| Spud Drilling Contractor: CAPSTAR DRILLING | |
| Final Drill Date: 2007-07-15 | |
| Well Total Depth: 4505.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.240000 | |
| Longitude: -81.100000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2007-06-12 | Proposed Formations:CLINTON, Issued Date:6/12/2007, Expired Date:6/11/2008 6:00:00 AM, Drilling unit acres:173.42, Proposed Well Type:OG, Proposed Well Class:POOL |
| Completed | 2007-07-15 | |
| Reached Total Depth | 2007-07-15 | |
| Completion Report Received | 2007-11-23 | |
| Construction Permit Expires | 2008-06-11 | |
| Correction to Well | 2010-01-22 | UNIT SIZE DECREASED TO 4O ACRES. |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2008-03-13 | 4315 | 4408 | 42 |
| 4315 | 4408 | 42 | |
| 4315 | 4408 | 42 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 82295 Gal | 50000 | FRAC ALSO USED 75 MSCF OF N2 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2007 | CEDAR VALLEY ENERGY INC | 0.00 | 729.00 | 90 |
| 2008 | CEDAR VALLEY ENERGY INC | 2238.00 | 1110.00 | 365 |
| 2009 | CEDAR VALLEY ENERGY INC | 869.00 | 600.00 | 365 |
| 2010 | CEDAR VALLEY ENERGY INC | 826.00 | 640.00 | 365 |
| 2011 | CEDAR VALLEY ENERGY INC | 224.00 | 481.00 | 365 |
| 2012 | CEDAR VALLEY ENERGY INC | 583.00 | 495.00 | 366 |
| 2013 | CEDAR VALLEY ENERGY INC | 402.00 | 479.00 | 365 |
| 2014 | CEDAR VALLEY ENERGY INC | 370.00 | 310.00 | 365 |
| 2015 | CEDAR VALLEY ENERGY INC | 605.00 | 423.00 | 365 |
| 2016 | CEDAR VALLEY ENERGY INC | 166.00 | 317.00 | 365 |
| 2017 | CEDAR VALLEY ENERGY INC | 0.00 | 278.00 | 365 |
| 2018 | CEDAR VALLEY ENERGY INC | 0.00 | 337.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2007 | CEDAR VALLEY ENERGY INC | Brine | 868 | 90 |
| 2008 | CEDAR VALLEY ENERGY INC | Brine | 2591 | 365 |
| 2009 | CEDAR VALLEY ENERGY INC | Brine | 816 | 365 |
| 2010 | CEDAR VALLEY ENERGY INC | Brine | 607 | 365 |
| 2011 | CEDAR VALLEY ENERGY INC | Brine | 396 | 365 |
| 2012 | CEDAR VALLEY ENERGY INC | Brine | 368 | 366 |
| 2013 | CEDAR VALLEY ENERGY INC | Brine | 395 | 365 |
| 2014 | CEDAR VALLEY ENERGY INC | Brine | 286 | 365 |
| 2015 | CEDAR VALLEY ENERGY INC | Brine | 442 | 365 |
| 2016 | CEDAR VALLEY ENERGY INC | Brine | 607 | 365 |
| 2017 | CEDAR VALLEY ENERGY INC | Brine | 521 | 365 |
| 2018 | CEDAR VALLEY ENERGY INC | Brine | 410 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -736194324 | 2008-1-23 0:00: | PW | No Violations | |
| 0511794096 | 2008-09-23 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
| 0736194324 | 2008-01-23 | Production Wells | No Violations | Status check inspection. Preliminary restoration will be approved as soon as the vegetation establishes and the pile of rods and joints of tubing are removed. |
| 1523887714 | 2018-04-06 | Production Wells | No Violations | Follow-up to Complaint #5816 concerning erosion in an agricultural field on location. It was determined on 3/23/18 that the erosion occurring 600 east of the lease road was not caused by oil & gas activity at this site. I met on location today with Regional Supervisor Tom Hill and Cedar Valley Field Superintendent Tim Cosma. We walked the lease road and discussed the instability issues along the road both north and south of the low drainage area that are causing sedimentation. The lease road is shared by Cedar Valley and Northwood Energy Corp. for access to the wellheads on this property. Tim agreed that the furrowed areas of unbound soil and rock on both sides of the road need to be graded out and seeded. He is willing to work with Northwood to address these issues and agreed that the road should not be driven on during the spring thaw out. This work should be done when the area dries out in May or early June. I have spoken with Northwood about the issue and they will meet with me on location at the end of April to go over what needs to be done. I will continue to follow-up on progress when the work begins. |
| 1528300541 | 2018-06-06 | Production Wells | No Violations | Status check inspection of this Clinton Sandstone well. My inspection found the wellhead equipped with 2.375 rods and tubing and operating with the aid of an electric powered pumping unit. This well produces to a diked tank battery to the south at the lease road entrance. The battery contains one (1) 210 barrel tank, one (1) 100 barrel tank, and a horizontal separator with an associated meter run. The required ID is posted at the wellhead and at the tank battery. The lease road is now stable and the erosion issues in the agricultural field (not oil & gas related) have been mitigated. No violations. |
| 1573559560 | 2007-07-31 | Drill / Deepen / Reopen | No Violations | The drilling pits have been closed. No violations at this time. |
| 511794096 | 2008-9-23 0:00: | PL | No Violations |
For data sources see[9]