X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-24352

Well Details

Well ID: 34-133-24352
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Franklin Township
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR
Well Pad ID:
Farm/Lease Name: FRANKLIN TOWNSHIP TRUSTEES
License Status: Producing
License Date: 2007-11-28
Spud Date: 2008-01-16
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2008-01-20
Well Total Depth: 4398.00 ft
Configuration: Directional
Latitude: 41.190000
Longitude: -81.350000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2007-11-28 Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:11/28/2007, Expired Date:11/27/2008 6:00:00 AM, Drilling unit acres:54.67, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2007-12-07 CORRECTION TO TOWNSHIP, WELL IS IN FRANKLIN TOWNSHIP NOT RAVENNA.
Reached Total Depth 2008-01-20
Correction to Well 2008-03-14 CHANGE IN TARGET INFORMATION: NEW FOOTAGE= 585'NL & 1000'WL OF LOT 67; X= 2,315,310; Y= 557,795; ELEV.= 1086'.
Completion Report Received 2008-04-03
Construction Permit Expires 2008-11-27
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-08-13 4100 4140 72
4100 4140 72
4100 4140 72

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 2619 Bbl 80000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 OHIO VALLEY ENERGY SYSTEMS COR 2574.00 201.00 73
2009 OHIO VALLEY ENERGY SYSTEMS COR 15981.00 284.00 365
2010 OHIO VALLEY ENERGY SYSTEMS COR 13298.00 259.00 365
2011 OHIO VALLEY ENERGY SYSTEMS COR 22871.00 275.00 365
2012 OHIO VALLEY ENERGY SYSTEMS COR 22922.00 206.00 366
2013 OHIO VALLEY ENERGY SYSTEMS COR 16832.00 144.00 365
2014 OHIO VALLEY ENERGY SYSTEMS COR 18236.00 120.00 365
2015 OHIO VALLEY ENERGY SYSTEMS COR 11967.00 101.00 365
2016 OHIO VALLEY ENERGY SYSTEMS COR 10786.00 108.00 365
2017 OHIO VALLEY ENERGY SYSTEMS COR 9747.00 102.00 365
2018 OHIO VALLEY ENERGY SYSTEMS COR 8746.00 107.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 OHIO VALLEY ENERGY SYSTEMS COR Brine 65 73
2009 OHIO VALLEY ENERGY SYSTEMS COR Brine 280 365
2010 OHIO VALLEY ENERGY SYSTEMS COR Brine 271 365
2011 OHIO VALLEY ENERGY SYSTEMS COR Brine 497 365
2012 OHIO VALLEY ENERGY SYSTEMS COR Brine 291 366
2013 OHIO VALLEY ENERGY SYSTEMS COR Brine 203 365
2014 OHIO VALLEY ENERGY SYSTEMS COR Brine 201 365
2015 OHIO VALLEY ENERGY SYSTEMS COR Brine 267 365
2016 OHIO VALLEY ENERGY SYSTEMS COR Brine 143 365
2017 OHIO VALLEY ENERGY SYSTEMS COR Brine 129 365
2018 OHIO VALLEY ENERGY SYSTEMS COR Brine 70 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-134184354 2008-1-14 0:00: DD No Violations
-1821186032 2017-11-29 0:00 UP No Violations 0.70
0134184354 2008-01-14 Drill / Deepen / Reopen No Violations Wildcat Drilling is moving on the location and will spud the well on 1/15. The pits will be dug on 1/15.
0587883995 2008-06-02 Preliminary Restoration No Violations Preliminary restoration is approved.
0694134964 2008-02-13 Drill / Deepen / Reopen No Violations The well is scheduled to be completed the week of 2/18. No violations at this time.
1202133627 2008-01-28 Drill / Deepen / Reopen No Violations Chem Tech and Dons Excavating were on site to solidify the drilling pits. The working pit took one load and the blow pit will need two loads. The blow pit will be completed tomorrow.
1567822862 2008-01-23 Drill / Deepen / Reopen No Violations Wildcat Drilling has moved off. The drilling pits are fenced, lined and in good condition with sufficient freeboard to contain any precipitation.
1809363699 2008-01-09 Drill / Deepen / Reopen No Violations Dons Excavating was on site building the drilling location. The required signage and drilling permit were posted.
1821186032 2017-11-29 UrbanProduction Wells No Violations Status check inspection of this Clinton Sandstone well. My inspection found the wellhead is fenced, screened, and locked. The well is equipped and operating with the aid of a 1.5 plunger lift system, Logic Controls, and a motor valve. The 8.625 surface casing port is fitted with a 1 line and the valve is open. There is a domestic tap and meter on the 4.5 production casing port charged at 9psi. The well produces to a diked, fenced, and locked tank battery location and the battery is screened. The battery contains one (1) 100 barrel tank, a 50 barrel poly tank, and a horizontal separator. A gauge on the separator indicates a pressure of 80psi and the required ID is posted at the wellhead and tank battery. I found no violations at this time.
587883995 2008-6-2 0:00:0 PL No Violations
694134964 2008-2-13 0:00: DD No Violations
712243319 2020-1-31 0:00: UP No Violations 0.80

For data sources see[9]

References