X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-24356

Well Details

Well ID: 34-133-24356
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: BECK ENERGY CORPORATION
Well Pad ID:
Farm/Lease Name: MIAVITZ
License Status: Producing
License Date: 2008-02-07
Spud Date: 2008-03-20
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2008-03-28
Well Total Depth: 4468.00 ft
Configuration: Vertical
Latitude: 41.150000
Longitude: -81.240000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-02-07 Proposed Formations:CLINTON/MEDINA, Issued Date:2/7/2008, Expired Date:2/6/2009 6:00:00 AM, Drilling unit acres:43.98, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-03-28
Completion Report Received 2008-10-10
Construction Permit Expires 2009-02-06
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-11-24 4234 4280 44
4234 4280 44
4234 4280 44

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 113020 Gal 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 BECK ENERGY CORPORATION 1055.00 503.00 0
2009 BECK ENERGY CORPORATION 1138.00 279.00 365
2010 BECK ENERGY CORPORATION 908.00 194.00 365
2011 BECK ENERGY CORPORATION 645.00 100.00 365
2012 BECK ENERGY CORPORATION 414.00 0.00 366
2013 BECK ENERGY CORPORATION 450.00 198.00 365
2014 BECK ENERGY CORPORATION 491.00 94.00 365
2015 BECK ENERGY CORPORATION 1322.00 395.00 365
2016 BECK ENERGY CORPORATION 1539.00 253.00 365
2017 BECK ENERGY CORPORATION 1394.00 185.00 365
2018 BECK ENERGY CORPORATION 1159.00 184.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 BECK ENERGY CORPORATION Brine 445
2009 BECK ENERGY CORPORATION Brine 285 365
2010 BECK ENERGY CORPORATION Brine 210 365
2011 BECK ENERGY CORPORATION Brine 145 365
2012 BECK ENERGY CORPORATION Brine 170 366
2013 BECK ENERGY CORPORATION Brine 135 365
2014 BECK ENERGY CORPORATION Brine 143 365
2015 BECK ENERGY CORPORATION Brine 575 365
2016 BECK ENERGY CORPORATION Brine 405 365
2017 BECK ENERGY CORPORATION Brine 351 365
2018 BECK ENERGY CORPORATION Brine 295 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1220191004 2020-1-15 0:00: UP No Violations 1.00
-1536444407 2008-6-4 0:00:0 PW No Violations
-1749400747 2008-3-28 0:00: DD No Violations
-1755677590 2008-5-9 0:00:0 DD No Violations
-330748177 2009-4-14 0:00: PL No Violations
-372862057 2014-2-28 0:00: UP No Violations
-920430559 2008-3-18 0:00: DD No Violations
0024930698 2008-03-13 Drill / Deepen / Reopen No Violations The location is being built. The permit has been issued but is not posted on site as required.
0330748177 2009-04-14 Preliminary Restoration Violations Noted Preliminary restoration is three months past due. The affected area still needs grade work and seeding, which has never been done.
0338933309 2009-03-20 Production Wells No Violations The well was drilled nearly a year ago and preliminary restoration is due. I spoke to Junior with Beck Energy about regrading and seeding the affected area as soon as possible. He was under the impression that the landowner had plans for this area and would be disturbing the surface in the near future.
0372862057 2014-02-28 UrbanProduction Wells No Violations I inspected this well at the request of a City of Ravenna, Property Compliance Inspector. He e-mailed me pictures of the gates being unlocked at the tank battery and pumping unit of this Clinton well. I had previously spoken with Beck Energy about keeping the gates locked as required by OAC 1501:9-9-05[E](3) and installing chains. My inspection found that the gate to the tank battery was locked with a chain. I inspected the gate at the pumping unit and found it unsecured. A chain had been installed and I locked the gate. I called David Beck and told him he needs to stress to his well pumpers that it is not acceptable to leave the fences unlocked in urban areas. If this continues to be an issue, a compliance notice will be issued. I did not issue a violation at this time.
0920430559 2008-03-18 Drill / Deepen / Reopen No Violations The location has been built and the rig is scheduled to arrive on 3/20. The drilling pits will be dug after the rig is on site.
0953115628 2008-04-14 Drill / Deepen / Reopen No Violations The drilling pits have been solidified and covered over. The tank battery equipment is starting to arrive on site.
1206542553 2008-03-19 Drill / Deepen / Reopen No Violations Poulson Drilling is moving on location and will spud later today. The pits are being dug in sandy clay and clay.
1207082029 2008-03-24 Drill / Deepen / Reopen No Violations Poulson Drilling reported a large volume of fresh water at 651 in the Ohio Shale. The rate of flow forced the rig to switch from air/soap drilling to fluid drilling at the top of the Big Lime at 2335. The well will continue to be drilled on fluid. The pits are lined and in good condition.
1207188603 2008-03-25 Drill / Deepen / Reopen No Violations Poulson is drilling ahead. The pits are lined and in good condition.
1374734987 2009-06-10 Preliminary Restoration No Violations I met on site with the property owner who is doing the reclamation himself. He has planted nearly 20 trees and will be backblading the location and spreading seed and mulch in the next few weeks. An extension is approved until July 3. I also talked to David Beck about closing the lease road gate and locking the tank battery and wellhead fences. He said that they would do a better job.
1385847130 2013-10-11 UrbanProduction Wells No Violations I inspected this well at the request of Paul Bauer (City of Ravenna) to check the issues he found with the locked access gates at the tank battery and wellhead. Both the wellhead and tank battery were diked and properly fenced with green slats screening the equipment. The access gates had locks but the latches were not functioning properly and could be pushed open without removing the pad locks. The well was operating with the aid of a natural gas powered pumping unit and a Murphy Switch. There was no belt guard on the motor and a dozen broken belts were lying on the ground as well as empty motor oil bottles. There were no leaks at the wellhead and there was 80psi on the casing and tubing. The tank battery contained a low-profile 140 barrel stock tank, 2-50 barrel poly tanks and a horizontal separator reading 70-80psi. The tank battery was generally clean with several spots of oil on the stone beneath the load valve on the poly tank. I spoke with Beck Energy about the issues I found on this location and asked them to put chains on the access gates and lock them. I also asked them to pick up the broken belts and empty oil bottles at the pumping unit and to instruct their pumpers that the gates should be securely locked at all times. ID signs were posted at the well and tank battery, but were missing some required information. Urban rules require that the closest address to the lease road be posted on the ID sign as well as the local emergency number. Iasked them to begin updating all of their urban well ID signs. I will check back on the progress at this location.
1471044290 2009-09-16 Preliminary Restoration No Violations Preliminary restoration is approved.
1536444407 2008-06-04 Production Wells No Violations The well is in production. The fences are up and the ID is posted.
1749400747 2008-03-28 Drill / Deepen / Reopen No Violations Poulson Drilling is moving off site to a location in Summit County. The pits are lined and in good condition. The location is fenced.
1755677590 2008-05-09 Drill / Deepen / Reopen No Violations The tank battery is being built. The site has been rough graded. No violations at this time.
1791935633 2008-12-10 Production Wells No Violations Preliminary restoration will be due by the end of December. A large portion of the affected area still needs to be seeded and mulched.
1848577952 2008-03-31 Drill / Deepen / Reopen No Violations Beck has started solidifying the drilling pits. The shale pit has been closed. The blow pit will be solidified on 4/1.
24930698 2008-3-13 0:00: DD No Violations
338933309 2009-3-20 0:00: PW No Violations
953115628 2008-4-14 0:00: DD No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0330748177 US-OH-123463 2009-04-20 Failure to restore land surface within 9 mos. (CHANGE) (REPLACE)

For data sources see[9]

References