If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-133-24356 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.15,"lon":-81.24,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: <County> | |
| Municipality: | |
| Operator Name: BECK ENERGY CORPORATION | |
| Well Pad ID: | |
| Farm/Lease Name: MIAVITZ | |
| License Status: Producing | |
| License Date: 2008-02-07 | |
| Spud Date: 2008-03-20 | |
| Spud Drilling Contractor: POULSON DRILLING | |
| Final Drill Date: 2008-03-28 | |
| Well Total Depth: 4468.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.150000 | |
| Longitude: -81.240000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2008-02-07 | Proposed Formations:CLINTON/MEDINA, Issued Date:2/7/2008, Expired Date:2/6/2009 6:00:00 AM, Drilling unit acres:43.98, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2008-03-28 | |
| Completion Report Received | 2008-10-10 | |
| Construction Permit Expires | 2009-02-06 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2008-11-24 | 4234 | 4280 | 44 |
| 4234 | 4280 | 44 | |
| 4234 | 4280 | 44 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 113020 Gal | 0 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | BECK ENERGY CORPORATION | 1055.00 | 503.00 | 0 |
| 2009 | BECK ENERGY CORPORATION | 1138.00 | 279.00 | 365 |
| 2010 | BECK ENERGY CORPORATION | 908.00 | 194.00 | 365 |
| 2011 | BECK ENERGY CORPORATION | 645.00 | 100.00 | 365 |
| 2012 | BECK ENERGY CORPORATION | 414.00 | 0.00 | 366 |
| 2013 | BECK ENERGY CORPORATION | 450.00 | 198.00 | 365 |
| 2014 | BECK ENERGY CORPORATION | 491.00 | 94.00 | 365 |
| 2015 | BECK ENERGY CORPORATION | 1322.00 | 395.00 | 365 |
| 2016 | BECK ENERGY CORPORATION | 1539.00 | 253.00 | 365 |
| 2017 | BECK ENERGY CORPORATION | 1394.00 | 185.00 | 365 |
| 2018 | BECK ENERGY CORPORATION | 1159.00 | 184.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | BECK ENERGY CORPORATION | Brine | 445 | |
| 2009 | BECK ENERGY CORPORATION | Brine | 285 | 365 |
| 2010 | BECK ENERGY CORPORATION | Brine | 210 | 365 |
| 2011 | BECK ENERGY CORPORATION | Brine | 145 | 365 |
| 2012 | BECK ENERGY CORPORATION | Brine | 170 | 366 |
| 2013 | BECK ENERGY CORPORATION | Brine | 135 | 365 |
| 2014 | BECK ENERGY CORPORATION | Brine | 143 | 365 |
| 2015 | BECK ENERGY CORPORATION | Brine | 575 | 365 |
| 2016 | BECK ENERGY CORPORATION | Brine | 405 | 365 |
| 2017 | BECK ENERGY CORPORATION | Brine | 351 | 365 |
| 2018 | BECK ENERGY CORPORATION | Brine | 295 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1220191004 | 2020-1-15 0:00: | UP | No Violations | 1.00 |
| -1536444407 | 2008-6-4 0:00:0 | PW | No Violations | |
| -1749400747 | 2008-3-28 0:00: | DD | No Violations | |
| -1755677590 | 2008-5-9 0:00:0 | DD | No Violations | |
| -330748177 | 2009-4-14 0:00: | PL | No Violations | |
| -372862057 | 2014-2-28 0:00: | UP | No Violations | |
| -920430559 | 2008-3-18 0:00: | DD | No Violations | |
| 0024930698 | 2008-03-13 | Drill / Deepen / Reopen | No Violations | The location is being built. The permit has been issued but is not posted on site as required. |
| 0330748177 | 2009-04-14 | Preliminary Restoration | Violations Noted | Preliminary restoration is three months past due. The affected area still needs grade work and seeding, which has never been done. |
| 0338933309 | 2009-03-20 | Production Wells | No Violations | The well was drilled nearly a year ago and preliminary restoration is due. I spoke to Junior with Beck Energy about regrading and seeding the affected area as soon as possible. He was under the impression that the landowner had plans for this area and would be disturbing the surface in the near future. |
| 0372862057 | 2014-02-28 | UrbanProduction Wells | No Violations | I inspected this well at the request of a City of Ravenna, Property Compliance Inspector. He e-mailed me pictures of the gates being unlocked at the tank battery and pumping unit of this Clinton well. I had previously spoken with Beck Energy about keeping the gates locked as required by OAC 1501:9-9-05[E](3) and installing chains. My inspection found that the gate to the tank battery was locked with a chain. I inspected the gate at the pumping unit and found it unsecured. A chain had been installed and I locked the gate. I called David Beck and told him he needs to stress to his well pumpers that it is not acceptable to leave the fences unlocked in urban areas. If this continues to be an issue, a compliance notice will be issued. I did not issue a violation at this time. |
| 0920430559 | 2008-03-18 | Drill / Deepen / Reopen | No Violations | The location has been built and the rig is scheduled to arrive on 3/20. The drilling pits will be dug after the rig is on site. |
| 0953115628 | 2008-04-14 | Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified and covered over. The tank battery equipment is starting to arrive on site. |
| 1206542553 | 2008-03-19 | Drill / Deepen / Reopen | No Violations | Poulson Drilling is moving on location and will spud later today. The pits are being dug in sandy clay and clay. |
| 1207082029 | 2008-03-24 | Drill / Deepen / Reopen | No Violations | Poulson Drilling reported a large volume of fresh water at 651 in the Ohio Shale. The rate of flow forced the rig to switch from air/soap drilling to fluid drilling at the top of the Big Lime at 2335. The well will continue to be drilled on fluid. The pits are lined and in good condition. |
| 1207188603 | 2008-03-25 | Drill / Deepen / Reopen | No Violations | Poulson is drilling ahead. The pits are lined and in good condition. |
| 1374734987 | 2009-06-10 | Preliminary Restoration | No Violations | I met on site with the property owner who is doing the reclamation himself. He has planted nearly 20 trees and will be backblading the location and spreading seed and mulch in the next few weeks. An extension is approved until July 3. I also talked to David Beck about closing the lease road gate and locking the tank battery and wellhead fences. He said that they would do a better job. |
| 1385847130 | 2013-10-11 | UrbanProduction Wells | No Violations | I inspected this well at the request of Paul Bauer (City of Ravenna) to check the issues he found with the locked access gates at the tank battery and wellhead. Both the wellhead and tank battery were diked and properly fenced with green slats screening the equipment. The access gates had locks but the latches were not functioning properly and could be pushed open without removing the pad locks. The well was operating with the aid of a natural gas powered pumping unit and a Murphy Switch. There was no belt guard on the motor and a dozen broken belts were lying on the ground as well as empty motor oil bottles. There were no leaks at the wellhead and there was 80psi on the casing and tubing. The tank battery contained a low-profile 140 barrel stock tank, 2-50 barrel poly tanks and a horizontal separator reading 70-80psi. The tank battery was generally clean with several spots of oil on the stone beneath the load valve on the poly tank. I spoke with Beck Energy about the issues I found on this location and asked them to put chains on the access gates and lock them. I also asked them to pick up the broken belts and empty oil bottles at the pumping unit and to instruct their pumpers that the gates should be securely locked at all times. ID signs were posted at the well and tank battery, but were missing some required information. Urban rules require that the closest address to the lease road be posted on the ID sign as well as the local emergency number. Iasked them to begin updating all of their urban well ID signs. I will check back on the progress at this location. |
| 1471044290 | 2009-09-16 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
| 1536444407 | 2008-06-04 | Production Wells | No Violations | The well is in production. The fences are up and the ID is posted. |
| 1749400747 | 2008-03-28 | Drill / Deepen / Reopen | No Violations | Poulson Drilling is moving off site to a location in Summit County. The pits are lined and in good condition. The location is fenced. |
| 1755677590 | 2008-05-09 | Drill / Deepen / Reopen | No Violations | The tank battery is being built. The site has been rough graded. No violations at this time. |
| 1791935633 | 2008-12-10 | Production Wells | No Violations | Preliminary restoration will be due by the end of December. A large portion of the affected area still needs to be seeded and mulched. |
| 1848577952 | 2008-03-31 | Drill / Deepen / Reopen | No Violations | Beck has started solidifying the drilling pits. The shale pit has been closed. The blow pit will be solidified on 4/1. |
| 24930698 | 2008-3-13 0:00: | DD | No Violations | |
| 338933309 | 2009-3-20 0:00: | PW | No Violations | |
| 953115628 | 2008-4-14 0:00: | DD | No Violations |
| Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
|---|---|---|---|---|
| 0330748177 | US-OH-123463 | 2009-04-20 | Failure to restore land surface within 9 mos. (CHANGE) (REPLACE) |
For data sources see[9]