If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-133-24359 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.04,"lon":-81.01,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Portage | |
| Municipality: Deerfield Township | |
| Operator Name: NORTH AMERICAN PETROLEUM INC | |
| Well Pad ID: | |
| Farm/Lease Name: FATULA | |
| License Status: Producing | |
| License Date: 2008-04-01 | |
| Spud Date: 2008-07-23 | |
| Spud Drilling Contractor: ADVENT DRLG | |
| Final Drill Date: 2008-07-27 | |
| Well Total Depth: 5035.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.040000 | |
| Longitude: -81.010000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2008-04-01 | Proposed Formations:CLINTON, Issued Date:4/1/2008, Expired Date:4/1/2009 6:00:00 AM, Drilling unit acres:50.2578, Proposed Well Type:OG, Proposed Well Class:POOL |
| Original Spud | 2008-07-23 | |
| Reached Total Depth | 2008-07-27 | |
| Completion Report Received | 2009-03-09 | |
| Construction Permit Expires | 2009-04-01 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2009-06-05 | 4812 | 4930 | 34 |
| 4812 | 4930 | 34 | |
| 4812 | 4930 | 34 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 7 | 105000 Gal | 80000 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2009 | NORTH AMERICAN PETROLEUM INC | 3304.00 | 215.00 | 365 |
| 2010 | NORTH AMERICAN PETROLEUM INC | 9634.00 | 526.00 | 365 |
| 2011 | NORTH AMERICAN PETROLEUM INC | 9675.00 | 368.00 | 365 |
| 2012 | NORTH AMERICAN PETROLEUM INC | 8558.00 | 455.00 | 366 |
| 2013 | NORTH AMERICAN PETROLEUM INC | 6276.00 | 318.00 | 268 |
| 2014 | NORTH AMERICAN PETROLEUM INC | 4713.00 | 142.00 | 70 |
| 2015 | NORTH AMERICAN PETROLEUM INC | 5958.00 | 287.00 | 365 |
| 2016 | NORTH AMERICAN PETROLEUM INC | 6151.00 | 271.00 | 365 |
| 2017 | NORTH AMERICAN PETROLEUM INC | 5752.00 | 220.00 | 285 |
| 2018 | NORTH AMERICAN PETROLEUM INC | 4427.00 | 144.00 | 285 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2009 | NORTH AMERICAN PETROLEUM INC | Brine | 105 | 365 |
| 2010 | NORTH AMERICAN PETROLEUM INC | Brine | 320 | 365 |
| 2011 | NORTH AMERICAN PETROLEUM INC | Brine | 198 | 365 |
| 2012 | NORTH AMERICAN PETROLEUM INC | Brine | 160 | 366 |
| 2013 | NORTH AMERICAN PETROLEUM INC | Brine | 50 | 268 |
| 2014 | NORTH AMERICAN PETROLEUM INC | Brine | 365 | 70 |
| 2015 | NORTH AMERICAN PETROLEUM INC | Brine | 105 | 365 |
| 2016 | NORTH AMERICAN PETROLEUM INC | Brine | 0 | 365 |
| 2017 | NORTH AMERICAN PETROLEUM INC | Brine | 110 | 285 |
| 2018 | NORTH AMERICAN PETROLEUM INC | Brine | 110 | 285 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -294045752 | 2009-6-2 0:00:0 | PW | No Violations | |
| -482863668 | 2009-4-27 0:00: | PW | No Violations | |
| 0127497277 | 2009-04-16 | Preliminary Restoration | No Violations | Preliminary restoration is due and the site needs to be graded and reseeded. The location is also missing the required identification. |
| 0294045752 | 2009-06-02 | Production Wells | No Violations | The valve on the 8-5/8 casing head is buried but appears to be open. The result has been the release of a small amount of salt water to the surface area around the wellhead. The Quantab test results indicated chloride levels of approximately 6000+ ppm. I contacted Rick Batta with North American and asked him to uncover the casing head and place a pressure gauge on the open valve side to monitor annular pressure. I also asked him to recover the salt water and reseed the affected area. |
| 0359963943 | 2009-11-05 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
| 0482863668 | 2009-04-27 | Production Wells | No Violations | ID is still not posted. I will call Rick Batta about posting ID and finishing preliminary restoration which is due by the end of May. |
| 1218394901 | 2008-07-28 | Drill / Deepen / Reopen | No Violations | Advent Drilling has finished the well and run production casing. The drilling pits are lined and in good condition. No violations at this time. |
| 127497277 | 2009-4-16 0:00: | PL | No Violations | |
| 1571954889 | 2017-11-20 | Production Wells | No Violations | Status check inspection of this Clinton Sandstone well. My inspection found the wellhead equipped with 2.375 tubing and rods and an electric powered pumping unit. The belts on the pumping unit motor are currently broken. ID is posted on the unit and there is a domestic tap, charged at 14psi, plumbed to the 4.5 production casing port. The well produces to a diked tank battery to the north and contains one (1) 100 barrel tank, a 50 barrel poly tank, and a horizontal separator. A gauge at the separator indicates a pressure of 110psi. The required identification is posted on the 100 barrel tank. No violations. |
| 1714590133 | 2008-09-10 | Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified and the site is being graded. The well has been completed but the tank battery still needs to be built. This is a non-urban location. |
| 359963943 | 2009-11-5 0:00: | PL | No Violations |
For data sources see[9]