Well Details

Well ID: 34-133-24362
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: EOS ENERGY LLC
Well Pad ID:
Farm/Lease Name: KSU UNIT
License Status: Producing
License Date: 2008-06-11
Spud Date: 2008-08-06
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2008-08-13
Well Total Depth: 4325.00 ft
Configuration: Vertical
Latitude: 41.140000
Longitude: -81.320000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-06-11 Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:6/11/2008, Expired Date:6/11/2009 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-08-13
Completion Report Received 2008-12-23
Construction Permit Expires 2009-06-11
Change of Owner 2018-07-31 Operator changed from 1249, CUTTER OIL COMPANY to 10185, EOS ENERGY LLC
Record Last Modified 2018-07-31

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-02-13 4154 4178 49
4154 4178 49
4154 4178 49

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
N2 7 210 Mscf 70000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 CUTTER OIL COMPANY 0.00 354.00 365
2009 CUTTER OIL COMPANY 41160.00 1186.00 365
2010 CUTTER OIL COMPANY 22447.00 943.00 365
2011 CUTTER OIL COMPANY 21194.00 653.00 365
2012 CUTTER OIL COMPANY 16236.00 502.00 366
2013 CUTTER OIL COMPANY 19524.00 342.00 365
2014 CUTTER OIL COMPANY 7340.00 209.00 365
2015 CUTTER OIL COMPANY 7117.00 112.00 365
2016 CUTTER OIL COMPANY 8369.00 235.00 365
2017 CUTTER OIL COMPANY 11958.00 490.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 CUTTER OIL COMPANY Brine 4687 365
2009 CUTTER OIL COMPANY Brine 4627 365
2010 CUTTER OIL COMPANY Brine 4319 365
2011 CUTTER OIL COMPANY Brine 3415 365
2012 CUTTER OIL COMPANY Brine 2471 366
2013 CUTTER OIL COMPANY Brine 2464 365
2014 CUTTER OIL COMPANY Brine 1763 365
2015 CUTTER OIL COMPANY Brine 1844 365
2016 CUTTER OIL COMPANY Brine 2511 365
2017 CUTTER OIL COMPANY Brine 3393 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1203265697 2018-11-26 0:00 UP No Violations 1.20
-1776045001 2008-9-17 0:00: DD No Violations
-2068662266 2008-8-6 0:00:0 DD No Violations
-293180973 2008-10-21 0:00 PW No Violations
-355878719 2008-8-20 0:00: DD No Violations
-502107558 2008-11-18 0:00 PW No Violations
-823913645 2009-9-16 0:00: PL No Violations
0212717842 2008-08-14 Drill / Deepen / Reopen No Violations Poulson Drilling has moved off site. The pits are fenced, lined and in good condition. Solidification is scheduled for next week.
0293180973 2008-10-21 Production Wells No Violations The well is now in production. The required fencing and identification are in place. The containment dike drain, which discharges directly into an adjacent creek, has not been relocated or removed as requested. I spoke with CJ Cutter who said he would relocate the drain.
0355878719 2008-08-20 Drill / Deepen / Reopen No Violations Cutter Oil and Chemtech were on site to solidify the drilling pits. The frac job is scheduled for next week. No violations at this time.
0502107558 2008-11-18 Production Wells No Violations The well is in production and the dike drain has been removed as requested.
0802141604 2008-08-08 Drill / Deepen / Reopen No Violations Cemented surface casing. Pits and liners are intact.
0823913645 2009-09-16 Preliminary Restoration No Violations Preliminary restoration is approved.
1203265697 2018-11-26 UrbanProduction Wells No Violations Status check inspection of this Clinton Sandstone well. My inspection found the wellhead and tank battery fenced with board on board fencing and the man doors locked. The wellhead is equipped with 2.375 tubing and rods and is operating with the aid of an electric powered pumping unit. A gauge indicates 60psi on the 4.5 production casing port. This well produces to a diked tank battery on location containing two (2) 140 barrel tanks, a 35 barrel poly tank, and a horizontal separator. The thirty one day chart indicates a differential production pressure of 45psi and there is a Dominion Roots meter run inside the battery. The tank hatch lids are sealed and the tanks are vented through a 42 gallon charcoal filter. The required ID signage is posted at the wellhead and at the tank battery. No violations.
1776045001 2008-09-17 Drill / Deepen / Reopen No Violations Intrepid Well Service was on site to remove the down hole pump. The tank battery has been relocated and built. I requested a revised aerial showing the new tank batteryl location. I also told Cutter to remove the dike drain which currently discharges directly into an adjoining creek.
2068662266 2008-08-06 Drill / Deepen / Reopen No Violations Unable to get the conductor casing in the 15 dia. hole. Pulled the conductor casing and reamed the well bore with a 17 dia. bit.
212717842 2008-8-14 0:00: DD No Violations
802141604 2008-8-8 0:00:0 DD No Violations