X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-24381

Well Details

Well ID: 34-133-24381
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Mantua Township
Operator Name: TRANSCONTINENTAL OIL & GAS INC
Well Pad ID:
Farm/Lease Name: HINDERSCHEID
License Status: Producing
License Date: 2009-05-20
Spud Date: 2009-09-02
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 2009-09-15
Well Total Depth: 4210.00 ft
Configuration: Directional
Latitude: 41.330000
Longitude: -81.290000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2009-05-20 Proposed Formations:CLINTON, Issued Date:5/20/2009, Expired Date:5/20/2010 6:00:00 AM, Drilling unit acres:44.139, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2009-06-12 CORRECTION TO WELL NUMBER, SHOULD BE 1-D.
Reached Total Depth 2009-09-15
Completion Report Received 2010-04-13
Correction to Well 2010-05-07 CHANGE IN TARGET INFORMATION: NEW FOOTAGE: 1571'WL & 268'EL OF LOT 37; X= 2,329,655; Y= 608,391 (AS DRILLED SURVEY).
Construction Permit Expires 2010-05-20
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-07-14 3977 4049 25
3977 4049 25
3977 4049 25

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 85442 Gal 41300 192M SCF NITROGEN ASSIST

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2010 TRANSCONTINENTAL OIL & GAS INC 3264.00 1711.00 365
2011 TRANSCONTINENTAL OIL & GAS INC 3833.00 768.00 365
2012 TRANSCONTINENTAL OIL & GAS INC 3202.00 668.00 366
2013 TRANSCONTINENTAL OIL & GAS INC 4160.00 575.00 365
2014 TRANSCONTINENTAL OIL & GAS INC 2578.00 308.00 365
2015 TRANSCONTINENTAL OIL & GAS INC 3028.00 606.00 365
2016 TRANSCONTINENTAL OIL & GAS INC 3805.00 294.00 365
2017 TRANSCONTINENTAL OIL & GAS INC 3015.00 254.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 TRANSCONTINENTAL OIL & GAS INC Brine 697 365
2011 TRANSCONTINENTAL OIL & GAS INC Brine 200 365
2012 TRANSCONTINENTAL OIL & GAS INC Brine 75 366
2013 TRANSCONTINENTAL OIL & GAS INC Brine 90 365
2014 TRANSCONTINENTAL OIL & GAS INC Brine 70 365
2015 TRANSCONTINENTAL OIL & GAS INC Brine 35 365
2016 TRANSCONTINENTAL OIL & GAS INC Brine 362 365
2017 TRANSCONTINENTAL OIL & GAS INC Brine 91 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-124479306 2010-4-6 0:00:0 PW No Violations
-1434827437 2009-10-8 0:00: DD No Violations
-1500962969 2010-8-26 0:00: UL No Violations
-1547536399 2010-1-6 0:00:0 PW No Violations
-1944613630 2009-9-14 0:00: DD No Violations
0056375421 2009-12-01 Drill / Deepen / Reopen No Violations The well has not been fraced but the tank battery is under construction and the site has been rough graded. Preliminary restoration is due by May 15, 2010.
0124479306 2010-04-06 Production Wells No Violations The well is in production and the affected area still needs to be graded, seeded and mulched. Preliminary restoration is due later this spring.
0639672294 2009-09-10 Drill / Deepen / Reopen No Violations I received a call from Donny Erwin, the toolpusher on Capstar Rig 4 at 19: 30 on 9/9 reporting a strong gas odor at 3517. They were in the process of loading the hole and converting over to fluid drilling. I received no calls from either the public or local officials reporting any problems.
0830910027 2009-09-01 Drill / Deepen / Reopen No Violations Transcontinental Oil & Gas is starting to build the drilling location. The location of the drilling pits has been changed from northwest of the well to southwest of the well at the request of the drilling contractor. The drilling rig is scheduled to arrive tomorrow.
1047927289 2009-09-18 Drill / Deepen / Reopen No Violations Capstar Drilling has moved off the location. The drilling pits are fenced, lined and pumped down. Solidification is scheduled for next week.
1354117846 2012-11-27 UrbanPreliminary Restoration No Violations I was on location to check the status of preliminary restoration for this urban production well that was due in 2010. A check of records in RBDMS indicates that preliminary restoration was passed on 8/26/2010 by Inspector Bob Worstall. During my inspection, I found that the lease road gate was locked and the road was in good condition. The site was graded and grass was well established on the location. The proper ID was posted at the entrance and at the tank battery. The tank battery was diked, fenced, locked, and contained 1-100 and 1-140 barrel stock tanks as well as a horizontal separator and a meter run. The wellhead was fenced, locked, and operating on a plunger lift system. The gauge indicated there was 450psi on the well. A master meter carrying gas from the Wurm wells to the west was recently installed to the west of the tank battery. Preiminary resoration is approved. No violations.
1434827437 2009-10-08 Drill / Deepen / Reopen No Violations The drilling pits are fenced and lined but are still open. I spoke with Cal Marks who said that he intends to solidify and close the pits next week. The 30 day deadline is 10/18.
1500962969 2010-08-26 UrbanPreliminary Restoration No Violations Preliminary restoration is approved.
1547536399 2010-01-06 Production Wells No Violations The well is being turned on today and will now be in production. Preliminary restoration will be completed as soon as the weather permits in the spring. No violations at this time.
1635022766 2009-09-08 Drill / Deepen / Reopen No Violations Capstar Drilling Rig 4 is drilling ahead on air. No violations at this time.
1890754469 2009-10-21 Drill / Deepen / Reopen No Violations The drilling pits are solidified and covered over. The site needs additional grading before it can be seeded or mulched.
1944613630 2009-09-14 Drill / Deepen / Reopen No Violations Capstar Drilling is still on site and should TD the well tomorrow. Drilling has slowed since they switched over to fluid after encountering gas in the Newburg. They have also had trouble with mechanical breakdowns. The pits are fenced and lined.
56375421 2009-12-1 0:00: DD No Violations
639672294 2009-9-10 0:00: DD No Violations
830910027 2009-9-1 0:00:0 DD No Violations

For data sources see[9]

References