If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-24389 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.2,"lon":-81.31,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Franklin Township | |
Operator Name: GONZOIL INC | |
Well Pad ID: | |
Farm/Lease Name: LAKE ROCKWELL | |
License Status: Final Restoration | |
License Date: 2011-06-21 | |
Spud Date: 2010-07-16 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2010-07-20 | |
Well Total Depth: 4309.00 ft | |
Configuration: Vertical | |
Latitude: 41.200000 | |
Longitude: -81.310000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-04-19 | Proposed Formations:ORISKANY/NEWBURG/CLINTON, Issued Date:4/19/2010, Expired Date:4/19/2011 6:00:00 AM, Drilling unit acres:64.38, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-07-20 | |
Completion Report Received | 2010-11-09 | |
APP | 2011-06-21 | Proposed Formations:CLINTON, Issued Date:6/21/2011, Expired Date:6/20/2013 12:00:00 PM, Drilling unit acres:64.38, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2011-07-18 | |
Construction Permit Expires | 2012-06-20 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-12-21 | 4091 | 4181 | 26 |
4091 | 4181 | 26 | |
4091 | 4181 | 26 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2010-08-03 | H2O | 15 | 92000 Gal | 80000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | GONZOIL INC | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | GONZOIL INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1736036869 | 2010-9-1 0:00:0 | UD | No Violations | |
-457973388 | 2011-6-14 0:00: | PL | No Violations | |
-762951241 | 2011-4-29 0:00: | UL | No Violations | |
0457973388 | 2011-06-14 | Preliminary Restoration | No Violations | The affected areas have been graded, seeded and are growing. The security fence and well identification are in place but the well is not in production. A tank battery has never been built. GonzOil is still evaluating the well and may ultimately decide to plug and abandon the well due to water production. Preliminary restoration is approved. |
0762003096 | 2010-06-29 | Drill / Deepen / Reopen | No Violations | Daily Excavating was on site building the drilling location. The drilling rig is scheduled to arrive next week. No violations at this time. |
0762951241 | 2011-04-29 | UrbanPreliminary Restoration | No Violations | The affected area around the wellhead has been graded, seeded and is growing. The well however is still being evaluated for commercial viability. Consequently, the tank battery has not been set. Preliminary restoration is approved for the area affected by the drilling. If plugged and abandoned, the area will be re-evaluated for final restoration. If placed in production, the location of the tank battery will be noted. |
1233140342 | 2011-08-31 | Final Restoration | No Violations | There is vegetation growth on the well and the tank battery area. This well PASSES FINAL RESTORATION. |
1280148755 | 2010-07-14 | Drill / Deepen / Reopen | No Violations | The drilling location is built and ready for the rig which should arrive later in the week. |
1281362354 | 2010-07-29 | Drill / Deepen / Reopen | No Violations | Daily Excavating and Chemtech are on site to solidify the drilling pits. The pits should be covered over in the next few days. |
1296652655 | 2011-01-27 | Urban Drill / Deepen / Reopen | No Violations | The well has been completed and tubing was run. The well is being evaluated by Gonzoil to determine the economic viability of the well before setting the tank battery and installing the salesline. Preliminary restoration is due this spring. |
1350446282 | 2010-10-05 | Urban Drill / Deepen / Reopen | No Violations | The affected area has been finish graded and will be seeded and mulched. The well is still being evaluated for production potential. |
1736036869 | 2010-09-01 | Urban Drill / Deepen / Reopen | No Violations | The well has been fraced, the pits have been solidified and the site has been rough graded. |
762003096 | 2010-6-29 0:00: | DD | No Violations |
For data sources see[9]