If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-24393 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.16,"lon":-81.31,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Franklin Township | |
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
Well Pad ID: | |
Farm/Lease Name: BRADY LAKE UNIT | |
License Status: Producing | |
License Date: 2010-07-22 | |
Spud Date: 2010-10-18 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2010-10-26 | |
Well Total Depth: 4590.00 ft | |
Configuration: Directional | |
Latitude: 41.160000 | |
Longitude: -81.310000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-07-22 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:7/22/2010, Expired Date:7/21/2012 12:00:00 PM, Drilling unit acres:66.36, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-10-26 | |
Completion Report Received | 2011-01-20 | |
Construction Permit Expires | 2011-07-22 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-05-09 | 4323 | 4398 | 80 |
4323 | 4398 | 80 | |
4323 | 4398 | 80 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2010-11-16 | H2O | 8 | 109000 Gal | 80000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | OHIO VALLEY ENERGY SYSTEMS COR | 17834.00 | 253.00 | 243 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | 26706.00 | 258.00 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | 18654.00 | 108.00 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | 14834.00 | 119.00 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | 11929.00 | 100.00 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | 10676.00 | 71.00 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | 10544.00 | 78.00 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | 9097.00 | 74.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 598 | 243 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 192 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 160 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 52 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 54 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 70 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 69 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 63 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1611254193 | 2011-2-15 0:00: | UP | No Violations | |
-188462447 | 2010-11-1 0:00: | UD | No Violations | |
-247145838 | 2011-1-19 0:00: | UD | No Violations | |
-834821247 | 2010-11-17 0:00 | UD | No Violations | |
0108463963 | 2011-04-27 | Urban Drill / Deepen / Reopen | No Violations | Preliminary restoration is due now. Weather delays have pushed grading and seed work into the future. I talked to Ohio Valley about requesting an extension on the restoration deadline. |
0188462447 | 2010-11-01 | Urban Drill / Deepen / Reopen | No Violations | The location and the drilling pits are fenced. The pits are still open but have been pumped down with sufficient freeboard. No violations at this time. |
0247145838 | 2011-01-19 | Urban Drill / Deepen / Reopen | No Violations | The well is still waiting for a turn on. The tank battery is nearly complete and the wellhead is equipped with a rabbit. Security fencing still needs to be placed around the well and the tank battery. Preliminary restoration is due this spring. |
0317409823 | 2011-06-14 | Preliminary Restoration | No Violations | The affected areas have been graded, seeded and are growing. The security fence, containment dike and well identification are in place and the well is in production. Preliminary restoration is approved. |
0451256956 | 2010-10-25 | Urban Drill / Deepen / Reopen | No Violations | Wildcat is drilling ahead and should TD this directional well within the next 36 hours. The pits are fenced, lined and in good condition. No violations at this time. |
0834821247 | 2010-11-17 | Urban Drill / Deepen / Reopen | No Violations | The well was fraced earlier. J-Well service rig is on site. Work will continue on building the tank battery and site reclamation. No violations at this time. |
108463963 | 2011-4-27 0:00: | UD | No Violations | |
1288358831 | 2010-10-21 | Urban Drill / Deepen / Reopen | No Violations | Wildcat is drilling ahead on air building angle. They will switch over to fluid drilling at the top of the Big Lime. The pits are fenced, lined and in good condition. No violations at this time. |
1295807038 | 2019-7-10 0:00: | UP | No Violations | 0.80 |
1611254193 | 2011-02-15 | UrbanProduction Wells | No Violations | The well is in production. The required fencing and identification are in place. Preliminary restoration will be completed as soon as weather permits. |
1663237502 | 2010-11-09 | Urban Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified and covered. Perforating and fracing are scheduled for next week. |
1747912826 | 2010-10-28 | Urban Drill / Deepen / Reopen | No Violations | Wildcat Drilling has moved off location and Ray Pander Trucking is pump the pits down. The location and the pits are fenced. No violations at this time. |
1770372362 | 2010-10-26 | Urban Drill / Deepen / Reopen | No Violations | Wildcat will TD the well later today. |
1910343502 | 2010-12-21 | Urban Drill / Deepen / Reopen | No Violations | The well has been fraced. The tank battery is being built and the flowline is being installed. No violations at this time. |
317409823 | 2011-6-14 0:00: | PL | No Violations | |
451256956 | 2010-10-25 0:00 | UD | No Violations |
For data sources see[9]