If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-133-24396 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.1,"lon":-81.15,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Portage | |
| Municipality: Edinburg Township | |
| Operator Name: DUCK CREEK ENERGY INC | |
| Well Pad ID: | |
| Farm/Lease Name: PAVLICK UNIT | |
| License Status: Producing | |
| License Date: 2010-08-17 | |
| Spud Date: 2010-08-28 | |
| Spud Drilling Contractor: POULSON DRILLING | |
| Final Drill Date: 2010-09-02 | |
| Well Total Depth: 4770.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.100000 | |
| Longitude: -81.150000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2010-08-17 | Proposed Formations:CLINTON, Issued Date:8/17/2010, Expired Date:8/16/2012 12:00:00 PM, Drilling unit acres:40.2, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2010-09-02 | |
| Completion Report Received | 2010-10-01 | |
| Construction Permit Expires | 2012-08-16 | |
| Change of Owner | 2018-06-20 | Operator changed from 2037, CEDAR VALLEY ENERGY INC to 1902, DUCK CREEK ENERGY INC |
| Record Last Modified | 2018-06-20 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2010-11-26 | 4562 | 4619 | 31 |
| 4562 | 4619 | 31 | |
| 4562 | 4619 | 31 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| N2 | 0 | 150 Mscf | 65000 | 118,431 GAL OF WTR USED IN FRAC |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2010 | CEDAR VALLEY ENERGY INC | 0.00 | 70.00 | 67 |
| 2011 | CEDAR VALLEY ENERGY INC | 8037.00 | 1781.00 | 365 |
| 2012 | CEDAR VALLEY ENERGY INC | 5020.00 | 1003.00 | 366 |
| 2013 | CEDAR VALLEY ENERGY INC | 3850.00 | 713.00 | 365 |
| 2014 | CEDAR VALLEY ENERGY INC | 3284.00 | 671.00 | 365 |
| 2015 | CEDAR VALLEY ENERGY INC | 2767.00 | 411.00 | 365 |
| 2016 | CEDAR VALLEY ENERGY INC | 61.00 | 0.00 | 365 |
| 2017 | CEDAR VALLEY ENERGY INC | 0.00 | 24.00 | 365 |
| 2018 | DUCK CREEK ENERGY INC | 0.00 | 0.00 | 122 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2010 | CEDAR VALLEY ENERGY INC | Brine | 1246 | 67 |
| 2011 | CEDAR VALLEY ENERGY INC | Brine | 12016 | 365 |
| 2012 | CEDAR VALLEY ENERGY INC | Brine | 7161 | 366 |
| 2013 | CEDAR VALLEY ENERGY INC | Brine | 6927 | 365 |
| 2014 | CEDAR VALLEY ENERGY INC | Brine | 6009 | 365 |
| 2015 | CEDAR VALLEY ENERGY INC | Brine | 5027 | 365 |
| 2016 | CEDAR VALLEY ENERGY INC | Brine | 237 | 365 |
| 2017 | CEDAR VALLEY ENERGY INC | Brine | 1700 | 365 |
| 2018 | DUCK CREEK ENERGY INC | Brine | 1835 | 122 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1501654318 | 2010-8-23 0:00: | SC | No Violations | |
| -1657443290 | 2011-1-19 0:00: | PW | No Violations | |
| -1933653435 | 2010-8-31 0:00: | DD | No Violations | |
| -2071652426 | 2019-10-24 0:00 | PW | No Violations | 0.80 |
| -248352024 | 2011-6-14 0:00: | PL | No Violations | |
| 0248352024 | 2011-06-14 | Preliminary Restoration | No Violations | The affected areas have been graded, seeded and are growing. The containment dike and well identification are in place and the well is in production. Preliminary restoration is approved. |
| 0528714786 | 2010-09-01 | Drill / Deepen / Reopen | No Violations | Poulson is drilling ahead on air/soap. The pits are lined and in good condition. |
| 1027456401 | 2010-09-08 | Drill / Deepen / Reopen | No Violations | Mills Excavating was on site to solidify the drilling pits. Chemtech delivered two loads of dust earlier in the day and place one load in each pit. Hotshot was also on site to perforate the casing. |
| 1101788638 | 2016-11-22 | Production Wells | No Violations | I conducted a status check inspection of this Clinton Sandstone well. My inspection found the wellhead equipped and operating with the aid of an electric pumping unit. The valve on the 4.5 production casing is currently closed and an ID sign is posted at the wellhead. This well produces to a diked tank battery to the south containing two (2) 140 barrel tanks, a 70 barrel tank, and a horizontal separator. There is a Dominion Roots meter run in the tank battery and the required ID is posted. I found no violations at this time. |
| 1283950591 | 2010-08-30 | Drill / Deepen / Reopen | No Violations | Successfully completed the BOP test on Poulson Drilling after setting the 8-5/8 surface casing the day before. Drilling of the 7-7/8 hole will start later this morning. |
| 1501654318 | 2010-08-23 | Surface Facility Construction | No Violations | Mills Excavating was on site building the lease road and the location. Poulson Drilling is scheduled to arrive later in the week. This is a non-urban township. |
| 1657443290 | 2011-01-19 | Production Wells | No Violations | The well has been completed and is turned on. This is a non-urban location. Preliminary restoration is due this spring. |
| 1810650420 | 2010-08-27 | Drill / Deepen / Reopen | No Violations | The location has been built and the drilling pits have been excavated and lined. This is a non-urban location. The rig is scheduled to arrive tomorrow morning. |
| 1933653435 | 2010-08-31 | Drill / Deepen / Reopen | No Violations | Poulson Drilling is drilling ahead on air/soap. The pits are lined and in good condition. |
| 528714786 | 2010-9-1 0:00:0 | DD | No Violations |
For data sources see[9]