Well Details

Well ID: 34-133-24408
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Randolph Township
Operator Name: M & M ROYALTY LTD
Well Pad ID:
Farm/Lease Name: MAY
License Status: Final Restoration
License Date: 2014-07-18
Spud Date: 2011-04-30
Spud Drilling Contractor: ADVENT DRLG
Final Drill Date: 2011-05-18
Well Total Depth: 7174.00 ft
Configuration: Vertical
Latitude: 41.030000
Longitude: -81.300000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-03-14 Proposed Formations:UTICA THRU ROSE RUN, Issued Date:3/14/2011, Expired Date:3/13/2013 12:00:00 PM, Drilling unit acres:57.02, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2011-04-01 CHANGE IN LEASE ROAD, THE LOCATION OF THE TANK BATTERY AND THE LOCATION OF THE SALES LINE. (FROM AERIAL MAP)
Reached Total Depth 2011-05-18 LANDOWNER WAIVER TO LEAVE LEASE ROAD AND GATE AS IS FOR LANDOWNER USE
Completion Report Received 2011-08-18 LANDOWNER WAIVER TO LEAVE LEASE ROAD AND GATE AS IS FOR LANDOWNER USE
APP 2014-07-18 Proposed Formations:POINT PLEASANT/TRENTON, Issued Date:7/18/2014, Expired Date:7/17/2016 12:00:00 PM, Drilling unit acres:57.02, Proposed Well Type:OG, Proposed Well Class:ENPW
Plugged Back 2015-01-12 LANDOWNER WAIVER TO LEAVE LEASE ROAD AND GATE AS IS FOR LANDOWNER USE
Plugged/Abandoned 2015-06-22 LANDOWNER WAIVER TO LEAVE LEASE ROAD AND GATE AS IS FOR LANDOWNER USE
Construction Permit Expires 2015-07-18 LANDOWNER WAIVER TO LEAVE LEASE ROAD AND GATE AS IS FOR LANDOWNER USE
Record Last Modified 2017-05-18 LANDOWNER WAIVER TO LEAVE LEASE ROAD AND GATE AS IS FOR LANDOWNER USE

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-11-29 7003 7055 80
7003 7055 80
7003 7055 80

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2011-05-31 H2O 0 3205 Bbl 80000 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 M & M ROYALTY LTD 0.00 0.00 0
2012 M & M ROYALTY LTD 939.00 511.00 366
2013 M & M ROYALTY LTD 159.00 129.00 59
2014 M & M ROYALTY LTD 0.00 0.00 0
2015 M & M ROYALTY LTD 33.00 0.00 30

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 M & M ROYALTY LTD Brine 830 0
2012 M & M ROYALTY LTD Brine 2078 366
2013 M & M ROYALTY LTD Brine 229 59
2014 M & M ROYALTY LTD Brine 308 0
2015 M & M ROYALTY LTD Brine 131 30

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1193964247 2011-5-16 0:00: UD No Violations
-2076983245 2011-5-6 0:00:0 UD No Violations
-549401144 2015-6-18 0:00: PB No Violations 2.50
-834554355 2015-1-12 0:00: PB No Violations 2.00
-919130892 2015-5-19 0:00: PL No Violations 1.00
-95123146 2015-6-22 0:00: PB No Violations 6.00
0021355561 2015-06-19 Plug / Plug Back No Violations I was on location with Inspector John Fleming, Hagen Well Services, and Appalachian Well Surveys to continue with plugging operations. Appalachian ran a cement bond log (CBL) and gamma ray tool to check for free pipe below the Salina Salt Group. The CBL indicated that the salt had not squeezed the 4.5 casing and was free to the point where the casing could be shot off to avoid perforating and squeezing a plug across the Clinton Sandstone. The casing was shot off at a depth of 4,550 where the gamma ray signal indicated the presence of the competent Medina Sandstone. The pipe was free and Hagen pulled a 6 pup joint and one (1) 44 joint of casing. The weight indicator showed 53,000lbs of pullback coming out of the hole and agrees with the actual string weight of the 11.6lb/ft., 4.5 casing of 52,780lbs. The casing was set in the slips, packed off, and shut-in. Operations will resume on 6/22/15. No violations.
0095123146 2015-06-22 Plug / Plug Back No Violations I was on location with Hagen Well Services, Petroset Cementing, and Northeast Oilfield Services to conduct plugging operations. Plugs were set across the Clinton Sandstone, the Big Lime, the Ohio Shale/Berea Sandstone interval, and the Glacial Deposits. Good circulation was achieved on all plugs and cement circulated and held at the surface on the final plug. 103 joints of 11.6lb/ft., 4.5 casing was recovered during the job. See plug report for more details on this job. No violations.
0192037274 2011-05-02 Urban Drill / Deepen / Reopen No Violations Advent is drilling ahead at 1430. The drilling pits are fenced, lined and in good condition. No violations at this time.
0402644849 2015-07-16 Final Restoration No Violations I was on location to check the status of final restoration. This well was plugged back from the Rose Run Sandstone to the Trenton Limestone on 1/9/2015. The Trenton was stimulated with acid and subsequent testing proved the zone to be non-commercial. The well was plugged and abandoned on 6/22/2015 and final restoration is due by 9/22/2015. My inspection today found that the tank battery has been dismantled and removed. The location has been graded and needs to be seeded. There is trac-hoe parked on the lease road. I spoke with the landowner about the lease road and he would like it to remain for access to his bean field. A landowner waiver will be required for the lease road and flow or sales lines left in the ground. I will check back later on the establishment of vegetation. No violations
0549401144 2015-06-18 Plug / Plug Back No Violations I was on location with Steve Hagen Well Services and Petroset Cementing to witness the setting of the plug across the Trenton Limestone. This well was plugged back from the Rose Run Sandstone on 1/12/15 and the Trenton Limestone was tested for production and found to be a dry hole. Hagen swabbed the hole dry this morning and Petroset rigged up to the 4.5 casing. A 30 sack plug was bullheaded to the perforations with 50lbs of cottonseed hulls. The plug landed, the well pressured up to 600psi, and the valve on the casing was shut. Full displacement was achieved to a depth of 5932. No violations. See plug report for more details on this job.
0834554355 2015-01-12 Plug / Plug Back No Violations I was on location to check on the plugging back of this well to the Trenton Limestone. Mike Weinsz (M&M) was on location with Chipco and Appalachian Well Surveys to conduct operations. Appalachian ran in the hole and tagged the top of the cement plug set on Friday (1/9/15) at a depth of 6338. They set a steel bridge plug at 6337 and ran a cement bond log coming out of the hole. The DV tool (2-stage cement tool) run when the well was drilled was found at 6250. The bond log verified the top of the cement at 5582 and satifies the requirements outlined in OAC 1501:9-1-08(M)(7)(a)(i) that requires 500 of annular coverage above the top perforation which is 6123. Appalachian perforated the casing in 3 zones: 6123-6144, 6202-6208, and 6216-6224. M & M Royalty will be testing these zones. No violations.
0919130892 2015-05-19 Preliminary Restoration No Violations I received a call from Mike Weinsz (M&M) concerning the plugging requirements for this recently plugged back well. The section perforated and acidized in the Trenton Limestone was non productive and preliminary restoration is due from the plug back. I inspected location today and there is currently no activity at the well. The wellhead is currently equipped with a Demco gate valve and a 2.375 tubing head. The gate valve is closed. The pit used for plug back operations is closed and the area is graded. There is no drilling equipment on location. Preliminary restoration is approved. No violations.
0922903631 2011-05-10 Urban Drill / Deepen / Reopen No Violations The well reached TD and Baker Atlas is on site for the open hole logging. Will be ready to run production casing later tonight. The pits are full water is being transferred to a 500 bbl frac tank. Fluid level will need to be monitored during the cementing.
1193964247 2011-05-16 Urban Drill / Deepen / Reopen No Violations The pits are still fenced, lined and in good condition. The southern highwall is starting to slump. The pits need to be closed as soon as possible.
1304545358 2010-04-29 Urban Drill / Deepen / Reopen No Violations Advent Drilling is moving in and should spud the well later tonight or early in the morning. The pits have not been dug at this time. No violations at this time.
1304969786 2011-05-03 Urban Drill / Deepen / Reopen No Violations Advent is drilling ahead on air. The pits are relined and in good condition and the fence is installed.
1306163594 2011-05-13 Urban Drill / Deepen / Reopen No Violations Advent Drilling has moved off. The drilling pits are lined, fenced and in good condition.
1306872143 2011-05-17 Urban Drill / Deepen / Reopen No Violations The drilling pits have been pumped down and now have sufficient freeboard to contain any rain event.
1306933281 2011-05-31 UrbanProduction Wells No Violations Chris Grimm, John Brauer and myself witnessed the frac in the Rose Run. The well broke down at 1540psi. The average rate was 19bpm with a pressure of 3502psi. ISIP was 3451psi. 5 minutes was 3284psi. The total gallons used were 138,500 gallons and 759 sacks of sand. There were no violations at this time.
1306935648 2011-05-18 Urban Drill / Deepen / Reopen No Violations On May 10, 2011, during the primary 4-1/2 casing cement job, the multi stage cementer packer failed to open and the second stage was cancelled. On May 18, prior to drilling out the trip bomb, Universal pressured up on the packer in a last attempt to open the ports. At 2100 psi the ports opened and circulation was established. Universal then mixed and displaced 150 sacks of 50/50 pozmix with 2% gel and 10% salt. Circulation was maintained throughout the job with the plug down at 17:06 on May 18.
1307016986 2011-05-23 Urban Drill / Deepen / Reopen No Violations Turbo Excavating and Chem Tech are on site to solidify and cover the drilling pits. A small pit to be used for drilling out the multi stage cementer liner and trip bomb will be excavated and lined. The location is also being prepared for the frac job.
1353093911 2012-11-16 UrbanPreliminary Restoration No Violations I inspected this location to check the status of preliminary restoration which was due 7/30/2011. During my inspection I found that the drilling pits had been closed and that the site had been graded and seeded. There were no drilling, completion, or related equipment on location. The access road was gated and in good condition. The wellhead and tank battery were both diked and fenced with locks on both gates. The well was equipped with a pumping unit and the tank battery contained two vertical separators, 2-210 barrel tanks, and 1-210 barrel, horizontal tank. The meter run was located inside the tank battery. Preliminary restoration is approved. No violations.
1506320845 2011-05-04 Drill / Deepen / Reopen No Violations I preformed a rig inspection on Advent rig #1. The drilling depth was 3745 and drilling on air. This inspection satisfies 1501:9-9-03. There were no violations at this time.
1684491505 2014-01-09 Plug / Plug Back No Violations I was on location to witness the spotting of the bottom plug across the Rose Run Sandstone in the process of plugging the well back to the Trenton Limestone for testing. Mike Weinsz (M&M) was on location to oversee operations. Chipco spotted 2.375 tubing below the bottom perforation at a depth of 7,063. Universal Well Services rigged up and then mixed and pumped 11.5 barrels (50 sacks) of 50/50 Pozmix cement slurry. The slurry was displaced to 6,325 with 24 barrels of water. Chipco pulled 1000 of tubing and Universal circulated the tubing clean with 40 barrels of water. Operations will continue on Monday (1/12/15). No violations.
1761777468 2016-09-15 Final Restoration No Violations I conducted a Final Restoration inspection on the former location of this Rose Run Sandstone well. This well was plugged and abandoned in accordance with Chapter 1501:9-11 of the Ohio Administrative Code on 6/21/2016. My inspection today found that all of the surface and production equipment has been removed and the site has been graded. Native vegetation is well established on location and the topsoil is well bound to prevent substantial erosion. The operator has met the restoration requirements outlined in Chapter 1509.072 of the Ohio Revised Code and has submitted the required Landowner Waiver (Form 5) to leave the access road in place for the landowners use. Final Restoration is approved.
1868056833 2011-04-27 Urban Drill / Deepen / Reopen No Violations Turbo excavating is on site building the drilling location. Advent is scheduled to arrive on site by the end of the week.
192037274 2011-5-2 0:00:0 UD No Violations
2076983245 2011-05-06 Urban Drill / Deepen / Reopen No Violations Advent is drilling ahead on air. They are currently in the Utica Shale with a mud logger on site. They will switch over to fluid at the top of the Trenton or if they encounter a show of oil/natural gas and continue drilling on fluid to TD. The blow pit is full of cuttings and will need to managed during pit solidification and reclamation.
21355561 2015-6-19 0:00: PB No Violations 3.00
402644849 2015-7-16 0:00: FR No Violations 1.00
922903631 2011-5-10 0:00: UD No Violations

For data sources see[9]