If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-24416 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.1,"lon":-81.17,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Edinburg Township | |
Operator Name: NORTHWOOD ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: MAPLE KNOLL | |
License Status: Producing | |
License Date: 2011-07-22 | |
Spud Date: 2011-07-29 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2011-08-03 | |
Well Total Depth: 4722.00 ft | |
Configuration: Vertical | |
Latitude: 41.100000 | |
Longitude: -81.170000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-07-22 | Proposed Formations:CLINTON, Issued Date:7/22/2011, Expired Date:7/21/2013 12:00:00 PM, Drilling unit acres:51.65, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-08-03 | |
Completion Report Received | 2011-11-16 | |
Construction Permit Expires | 2013-07-21 | |
Change of Owner | 2015-05-29 | Operator changed from 1, HOPEWELL OIL & GAS DEVELOPMENT to 9488, SIBERIAN SOLSTICE ENERGY LLC |
Change of Owner | 2017-08-18 | Operator changed from 9488, SIBERIAN SOLSTICE ENERGY LLC to 1634, NORTHWOOD ENERGY CORP |
Record Last Modified | 2019-06-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-01-04 | 4483 | 4550 | 96 |
4483 | 4550 | 96 | |
4483 | 4550 | 96 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-10-21 | H2O | 15 | 84200 Gal | 0 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HOPEWELL OIL & GAS DEVELOPMENT | 2865.00 | 447.00 | 365 |
2015 | HOPEWELL OIL & GAS DEVELOPMENT | 636.00 | 111.00 | 365 |
2016 | SIBERIAN SOLSTICE ENERGY LLC | 631.00 | 0.00 | 365 |
2017 | NORTHWOOD ENERGY CORP | 420.00 | 73.00 | 365 |
2018 | NORTHWOOD ENERGY CORP | 1713.00 | 285.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 253 | 365 |
2015 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 131 | 365 |
2016 | SIBERIAN SOLSTICE ENERGY LLC | Brine | 0 | 365 |
2017 | NORTHWOOD ENERGY CORP | Brine | 75 | 365 |
2018 | NORTHWOOD ENERGY CORP | Brine | 155 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1235487552 | 2011-8-29 0:00: | PL | No Violations | |
-125431735 | 2015-5-14 0:00: | PL | No Violations | 1.00 |
-359347648 | 2011-8-2 0:00:0 | DD | No Violations | |
-904585097 | 2011-11-9 0:00: | PL | No Violations | |
0125431735 | 2015-05-14 | Preliminary Restoration | No Violations | I received a request from Columbus to check the status of this well as it was hydraulically fractured in 2011 and had yet to report any production. I also conducted a preliminary restoration inspection that is due for this location. My inspection found that the well is in production and equipped with a gas fired pumping unit. A gauge indicates 90psi on the 2.375 tubing. The wellhead is located in an agricultural field and the site is graded and planted. The tank battery is diked and contains one (1) 100 barrel tank, one (1) 210 barrel tank, and a horizontal separator with a meter run. The chart was changed on 5/13/15 and the proper ID is posted at the tank battery. I contacted Steve Opritza in Columbus and he informed that the production report, was in fact, submitted, and at that time of his inquiry, the numbers had not been posted in the RBDMS Database. Preliminary restoration is approved. No violations. |
0182255805 | 2011-08-03 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection on Poulson rig 1. The rig crew were running into the hole with 4 1/2 casing. This inspection satisfies 1501:9-9-03. There were no violations at this time. |
0359347648 | 2011-08-02 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection on Poulson rig 1. The rig was drilling on air/soap and the drilling depth was 3771. This inspection satisfies 1501:9-9-03. There were no violations at this time. |
0904585097 | 2011-11-09 | Preliminary Restoration | No Violations | The top soil has not been graded yet. I called Mark Smith (330-808-0716) about the status. Mark stated that Wade Pol should be out there to move the top soil yet today. There were no violations at this time. |
1195135224 | 2011-11-29 | Preliminary Restoration | No Violations | The top soil on the drilling location has been rough graded. There were no violations at this time. |
1235487552 | 2011-08-29 | Preliminary Restoration | No Violations | The drilling pits are closed and the debris is hauled off. The drilling rig is gone. There were no violations at this time. |
1312197302 | 2011-07-30 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the 8 5/8 casing by Petroset. There were no violations at this time. |
1312222792 | 2011-08-01 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection on Poulson rig 1. The drilling depth is 2732 and drilling on air/soap. This inspection satisfies 1501:9-9-03. There were no violations at this time. |
1312478508 | 2011-08-03 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the 4 1/2 casing by Petroset on Roy Poulson rig 1. There were no violations at this time. |
1605756415 | 2011-07-30 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection on Poulson rig #1. The rig crew were running into the hole with 8 5/8 casing. This inspection satisfies 1501:9-9-03. There were no violations at this time. |
182255805 | 2011-8-3 0:00:0 | DD | No Violations |
For data sources see[9]