34-133-24429

Well Details

Well ID: 34-133-24429
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Windham Township
Operator Name: CEDAR VALLEY ENERGY INC
Well Pad ID:
Farm/Lease Name: REYNOLDS FAMILY PARTNERSHIP UNIT
License Status: Producing
License Date: 2012-02-13
Spud Date: 2012-06-26
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2012-07-02
Well Total Depth: 4425.00 ft
Configuration: Vertical
Latitude: 41.270000
Longitude: -81.090000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-02-13 Proposed Formations:CLINTON, Issued Date:2/13/2012, Expired Date:2/12/2014 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2012-07-02
Completion Report Received 2012-08-06
Construction Permit Expires 2013-02-12
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-08-10 4207 4259 28
4207 4259 28
4207 4259 28

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-07-30 H2O 15 80637 Gal 44300 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 CEDAR VALLEY ENERGY INC 0.00 0.00 0
2013 CEDAR VALLEY ENERGY INC 2338.00 1579.00 365
2014 CEDAR VALLEY ENERGY INC 2281.00 1039.00 365
2015 CEDAR VALLEY ENERGY INC 1883.00 620.00 365
2016 CEDAR VALLEY ENERGY INC 1686.00 624.00 365
2017 CEDAR VALLEY ENERGY INC 1293.00 569.00 365
2018 CEDAR VALLEY ENERGY INC 1041.00 440.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 CEDAR VALLEY ENERGY INC Brine 0 0
2013 CEDAR VALLEY ENERGY INC Brine 1877 365
2014 CEDAR VALLEY ENERGY INC Brine 822 365
2015 CEDAR VALLEY ENERGY INC Brine 743 365
2016 CEDAR VALLEY ENERGY INC Brine 349 365
2017 CEDAR VALLEY ENERGY INC Brine 302 365
2018 CEDAR VALLEY ENERGY INC Brine 198 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1107120474 2012-8-17 0:00: UL No Violations
-133518108 2012-6-26 0:00: UD No Violations
-1357808916 2012-8-13 0:00: UP No Violations
-1421599919 2013-5-16 0:00: UP No Violations
-164283371 2012-6-27 0:00: UD No Violations
-1826571395 2012-7-9 0:00:0 UD No Violations
-1948403648 2012-4-17 0:00: UD No Violations
-599601768 2012-6-8 0:00:0 ND No Violations
-86660487 2012-6-8 0:00:0 ND No Violations
-944350897 2012-6-25 0:00: ND No Violations
0086660487 2012-06-08 Not Drilled No Violations A cellar (plastic culvert pipe) has been installed with a discharge line towards the south, where the pits have not yet been excavated. Several hay bails should be placed along the eastern edge of the site, between the creek and the downslope side of the excavated topsoil. The drainage ditch, from the culvert under the lease road, needs to be filled with stone/rip-rap to prevent silt runoff from entering the stream to the north. No violations.
0133518108 2012-06-26 Urban Drill / Deepen / Reopen No Violations On location to witness cementing of 11.75 conductor casing and construction of the reserve pit. Poulson Drilling spudded the well at 7:20 A.M. and cementers arrived on location at 10:00 A.M. Petroset rigged up, broke circulation, and cemented the conductor casing. There was 5 barrels of cement returned to surface and the cement head was shut-in. I instructed Roy Poulson to wait 6 hours before drilling out from under the conductor casing. See cement ticket for further details. The reserve pit was excavated and properly lined prior to installation of the plastic liner.
0164283371 2012-06-27 Urban Drill / Deepen / Reopen No Violations On location at 2:45 A.M. to witness cementing of 8.625 surface casing. Poulson Drilling was still running casing into the hole. Rigged up Petroset and broke circulation. Began mixing/pumping cement and displaced cement until 10 barrels had returned to surface. Plugged down at 4:20 A.M. Cement head was shut-in and Poulson Drilling was instructed to wait for 8 hours before drilling out from under the surface casing. See cement ticket for further details.
0267889990 2012-06-19 Not Drilled No Violations On location with DNR Deputy Chief Bob Worstall to meet with Tim Cosma (Cedar Valley) and dig a test pit at the location and verify if earthen pits will be allowed for drilling. Hole was excavated 6-8 feet to the top of hard bedrock. No groundwater was encountered in the test pit. Pits may be constructed only under inspector supervision and with the proper lining of road fabric installed beneath the plastic liner. If groundwater is encountered, steel pits will be required.
0286211130 2012-06-04 Not Drilled No Violations Site under construction. Lease road is stoned and in good condition. Dozer operator was leveling/cutting the pad down. Inspected silt fence between the site perimeter and the stream. Silt fence was properly trenched and installed. Bedrock is very shallow at this location. No violations.
0319461208 2012-06-04 Not Drilled No Violations Site under construction. Lease road is stoned and in good condition. Dozer operator was leveling/cutting the pad down. Inspected silt fence between the site perimeter and the stream. Silt fence was properly trenched and installed. Bedrock is very shallow at this location. No violations.
0599601768 2012-06-08 Not Drilled No Violations A cellar (plastic culvert pipe) has been installed with a discharge line towards the south where the pits have not yet been excavated. Several hay bails should be placed along the eastern edge of the site between the creek and the downslope of the excavated topsoil. The drainage ditch, from culvert under the lease road, needs to be filled with stone/rip-rap to prevent silt runoff from entering the stream to the north. No violations.
0794582986 2012-07-30 Urban Drill / Deepen / Reopen No Violations On location to check the status of the well after stimulation. Tim Cosma (Cedar Valley) and Hagen Well Services were on location and flowing the well back into steel tanks. Hagen was unloading rods and tubing to prepare for installation of the pumping unit. The 8.625 valve was open and showed no signs of annular pressure. No violations.
0904880627 2012-07-11 Preliminary Restoration No Violations The pits have been emptied of the solidified drill cuttings and are being closed/reclaimed. The dike around the tank battery has been constructed and is of sufficient capacity. No violations.
0944350897 2012-06-25 Not Drilled No Violations Poulson Drilling Co. is moving onto location. Rig is spotted and casing/drill pipe trailers are being moved into position. Pit excavation is beginning. Excavated down through the bedrock to 10 feet and no groundwater has been encountered. Earthen pits are approved for use. The working pit has been completely excavated and properly lined with felt and road fabric to prevent punctures in the plastic liner. The approved plastic liner was also installed. The well will be spud in the morning and the reserve pit will be constructed at this time. No violations.
0969186701 2012-07-30 Urban Drill / Deepen / Reopen No Violations On location to witness completion (hydraulic fracturing) of the Clinton Sandstone. Universal Well Services rigged up, tested the lines, broke the formation, and treated the formation with sand and water. The 8.625 valve was open and showed no signs of communication during or after stimulation. See stimulation report for more details.
0982834853 2018-12-13 UrbanProduction Wells No Violations Status check inspection of this Clinton Sandstone well. My inspection found the lease road gated and locked and in stable condition. The wellhead is diked, fenced, and screened and the man door secured with a lock. The well is equipped with 2.375 tubing and rods and an electric powered pumping unit. A Murphy switch gauge indicates 60-70psi on the tubing. This well produces to a diked, fenced, and locked tank battery at the top of the lease road. The battery contains one (1) 140 barrel tank, one (1) 100 barrel tank, and one (1) 70 barrel tank. The well produces through a horizontal separator in the battery and a gauge indicates 60psi on the vessel. The chart in the meter box indicates a differential production pressure of 40psi and the sales line is tied to a Dominion Roots meter run inside the battery. The 140 barrel tank is equipped with a sealed hatch with a charcoal filter and lightning arrestor on the vent line. Identification is posted at the wellhead, the tank battery, and at the lease road entrance. No violations.
1107120474 2012-08-17 UrbanPreliminary Restoration No Violations I was on location to check the restoration status of the location. I found that the stockpiled topsoil had been spread, graded, seeded, and mulched. A bulldozer and 300 barrel flow-back tank are still on location. No violations.
1340987533 2012-06-29 Urban Drill / Deepen / Reopen No Violations Poulson Drilling switched over to fluid drilling 60 feet above the Big Lime, at 2300. Penetration rate on fluid is 30 per hour and expect to reach TD (total depth) Sunday morning. The pits are in good shape and have plenty of freeboard. No violations.
1341499386 2012-07-03 Urban Drill / Deepen / Reopen No Violations On location for 4.5 production casing cement job. Poulson Drilling drilled the well to a total depth of 4,425 at the kelly bushing (+6 feet above ground level) and ran 102 joints of used J-55, 10.5 lb/ft, 4.5 casing with 10 centralizers to a depth of 4,398 at the kelly bushing. The 4.5 casing was in good condition and had been drifted and pressure tested to 4,000 psi by Miller Supply. Universal Services rigged up, broke circulation, and pumped 500 gallons of Unisweep, 300 lbs of calcium chloride, and 400 lbs of Flostop ahead of the cement. Universal then mixed and pumped 160 sacks of unitropic cement, displaced it with 72 barrels of water, landed the plug, pressured up to 1670 lbs and held the pressure for two minutes.
1342115858 2012-07-05 Urban Drill / Deepen / Reopen No Violations Ray Pander trucking is hauling pit water off location. Roy Poulsons drilling rig is still on location and is ready to be moved. All other drilling equipment has been moved off of location. No violations.
1350568226 2012-10-16 UrbanProduction Wells No Violations During this status check inspection, I found that the head of the pumping unit was removed and the rods had been pulled from the well bore. I talked to Tim Cosma (Cedar Valley) and he indicated that they were doing a polymer treatment on the well and that it had not produced any gas or oil since completion. He thought they had possibly fracked out of the producing zone in the Clinton and may have to re-complete the well in several weeks. No violations.
1357808916 2012-08-13 UrbanProduction Wells No Violations I was on location to check the status of the recently drilled urban well. The pumping unit is installed and running on an electric drop. The entire pumping unit is sufficiently diked and fenced. The gate is locked and the fence has slats installed for screening. The proper ID is posted at the wellhead and the tank battery. The tank battery is also fenced with screening and sufficiently diked. The tank pad contains 2 low-profile 100 barrel tanks and a mechanical separator. No violations.
1421599919 2013-05-16 UrbanProduction Wells No Violations I was on locaction to see if the gate had been installed on the lease road of this urban production well. A steel gate had been installed and was locked. No violations.
1456158363 2012-08-21 UrbanPreliminary Restoration No Violations During this inspection, I found that the 300 barrel flowback tank and bulldozer had been removed from the location. The entire location had been graded, seeded, and mulched. Preliminary restoration is approved. No violations.
1657143083 2012-07-06 Urban Drill / Deepen / Reopen No Violations On location to check the status of the drilling pits. Both the working pit and reserve pit are being mixed and solidified. Poulson Drilling has moved the drilling rig off of location. No violations
1677475384 2013-03-13 UrbanProduction Wells No Violations I was on location to check the status of this urban production well. This well was recompleted on 11/12/2012 due to water production issues. The well is running on an electric pumping unit. The area around the unit is properly diked and fenced with a locked gate. The annulus is equipped with a pop-off valve, pressure gauge, and is plumbed to the surface. There is no indication of pressure on the annulus. The proper ID is posted at the pumping unit and tank battery. The tank battery consists of 2-low profile, 140 barrel tanks, a horizontal separator and meter run. The battery is fenced, diked, and the gate is locked. The spacing of the equipment is in compliance with ORC 1509.021. No violations.
1752561827 2012-08-03 Urban Drill / Deepen / Reopen No Violations On location to check the status of the well following completion. Tubing and sucker rods have been installed in the 4.5 casing and are waiting on installation of the pumping unit and flow lines. Frac tanks are still on location (4 freshwater & 1 flow back). The tank battery is diked and fenced. No violations.
1826571395 2012-07-09 Urban Drill / Deepen / Reopen No Violations The working and reserve pits have been sufficiently solidfied and the cuttings are being removed and hauled to a landfill in Lodi, Ohio. No violations.
1936933626 2012-07-10 Urban Drill / Deepen / Reopen No Violations The cuttings in the reserve pit continue to be hauled away to a landfill in Lodi, Ohio. The production and brine tanks are being spotted on the tank pad. No violations.
1948403648 2012-04-17 Urban Drill / Deepen / Reopen No Violations Cedar Valley has built and stoned the entrance and cleared the lease road and location. There has been no notification of any drilling plans. The required identification is posted at the entrance.
267889990 2012-6-19 0:00: ND No Violations
286211130 2012-6-4 0:00:0 ND No Violations 1.00
319461208 2012-6-4 0:00:0 ND No Violations
794582986 2012-7-30 0:00: UD No Violations
904880627 2012-7-11 0:00: PL No Violations
969186701 2012-7-30 0:00: UD No Violations
982834853 2018-12-13 0:00 UP No Violations 0.70

For data sources see[9]