If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-139-20761 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.58,"lon":-82.46,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Richland | |
| Municipality: Jefferson Township | |
| Operator Name: BI JOE DEVELOPMENT INC | |
| Well Pad ID: | |
| Farm/Lease Name: BLUE WING | |
| License Status: Producing | |
| License Date: 2012-05-25 | |
| Spud Date: 2012-08-13 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 2012-08-26 | |
| Well Total Depth: 4660.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.580000 | |
| Longitude: -82.460000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2012-05-25 | Proposed Formations:TRENTON THRU TREMPEALEAU, Issued Date:5/25/2012, Expired Date:5/25/2014 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
| End of Confidential Data | 2012-08-26 | |
| Reached Total Depth | 2012-08-26 | |
| Completion Report Received | 2012-12-03 | |
| Construction Permit Expires | 2014-05-25 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2012-12-13 | 4513 | 4572 | 31 |
| 4513 | 4572 | 31 | |
| 4513 | 4572 | 31 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| ACID | 15 | 3150 Gal | 0 | Producers Service Corporation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 0 | 0 | 0 | ||
| 2012 | BI JOE DEVELOPMENT INC | 1882.00 | 1549.00 | 66 |
| 2013 | BI JOE DEVELOPMENT INC | 34035.00 | 7321.00 | 365 |
| 2014 | BI JOE DEVELOPMENT INC | 21932.00 | 6183.00 | 365 |
| 2015 | BI JOE DEVELOPMENT INC | 8091.00 | 3817.00 | 365 |
| 2016 | BI JOE DEVELOPMENT INC | 6495.00 | 2766.00 | 365 |
| 2017 | BI JOE DEVELOPMENT INC | 5583.00 | 1858.00 | 365 |
| 2018 | BI JOE DEVELOPMENT INC | 3891.00 | 1183.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2012 | BI JOE DEVELOPMENT INC | Brine | 225 | 66 |
| 2013 | BI JOE DEVELOPMENT INC | Brine | 640 | 365 |
| 2014 | BI JOE DEVELOPMENT INC | Brine | 1150 | 365 |
| 2015 | BI JOE DEVELOPMENT INC | Brine | 1015 | 365 |
| 2016 | BI JOE DEVELOPMENT INC | Brine | 896 | 365 |
| 2017 | BI JOE DEVELOPMENT INC | Brine | 710 | 365 |
| 2018 | BI JOE DEVELOPMENT INC | Brine | 695 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1518354712 | 2014-5-13 0:00: | PW | No Violations | 0.50 |
| -1711466371 | 2012-8-21 0:00: | DD | No Violations | |
| -17365261 | 2012-8-26 0:00: | DD | No Violations | |
| -1882775621 | 2012-8-14 0:00: | DD | No Violations | |
| -2109693807 | 2012-11-1 0:00: | PL | No Violations | |
| 0017365261 | 2012-08-26 | Drill / Deepen / Reopen | No Violations | Inspect drill site. Operator installed 4.5 inch production casing and cemented in place. |
| 0214674249 | 2012-08-28 | Drill / Deepen / Reopen | No Violations | Inspect well and location. Well has been completed. Rig mobed off site. Pits open and scheduled to be closed and solidified. |
| 0648799212 | 2012-08-16 | Administrative Inspection | No Violations | Contacted by driller to report that Blow out preventer test will be at 10:30 am. |
| 1068538231 | 2012-08-16 | Drill / Deepen / Reopen | No Violations | Inspect drill site. Cement surface casing. |
| 1344540449 | 2012-08-09 | Drill / Deepen / Reopen | No Violations | Maric drilling has begun building the location. The entrance is rocked and the location is cut into the side of a hill, ready for the drill rig. |
| 1518354712 | 2014-05-13 | Production Wells | No Violations | ID posted at the tank battery. The well is in production, equipped with a pump jack. 3-200 Bbl tanks in the tank battery and 2 separators. |
| 1559231233 | 2019-05-29 | Production Wells | No Violations | Identification is posted and no observed violations at the time of this inspection. |
| 1711466371 | 2012-08-21 | Drill / Deepen / Reopen | No Violations | Inspect drill site. Currently drilling at depth of 3800 ft. |
| 1882775621 | 2012-08-14 | Drill / Deepen / Reopen | No Violations | Inspect drill site. Meric drilling is cementing conductor casing. |
| 2053437021 | 2018-03-01 | Production Wells | No Violations | The well is equipped with a pump jack, rods and tubing and is in production. The well was pumping during inspection. There are 2-200 barrel tanks and a separator in the tank battery. ID is posted at the tanks. |
| 2109693807 | 2012-11-01 | Preliminary Restoration | No Violations | Inspect well and tanks. Preliminary restoration looks very good. selling gas. Two 210 bbl tanks. |
| 214674249 | 2012-8-28 0:00: | DD | No Violations | |
| 648799212 | 2012-8-16 0:00: | AM | No Violations |
For data sources see[9]