If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-139-20766 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.58,"lon":-82.47,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Richland | |
Municipality: Jefferson Township | |
Operator Name: BI JOE DEVELOPMENT INC | |
Well Pad ID: | |
Farm/Lease Name: YOUNG E | |
License Status: Producing | |
License Date: 2014-06-02 | |
Spud Date: 2014-08-06 | |
Spud Drilling Contractor: MARIC DRILLING CO. | |
Final Drill Date: 2014-08-27 | |
Well Total Depth: 4680.00 ft | |
Configuration: Vertical | |
Latitude: 40.580000 | |
Longitude: -82.470000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-06-02 | Proposed Formations:TRENTON THRU TREMPEALEAU, Issued Date:6/2/2014, Expired Date:6/1/2016 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-08-27 | |
Completion Report Received | 2014-10-27 | |
Construction Permit Expires | 2016-06-01 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-11-03 | 4548 | 4596 | 34 |
4548 | 4596 | 34 | |
4548 | 4596 | 34 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-08-27 | ACID | 0 | 4863 Gal | 0 | Producers Service Corporation | The operator conducted an acidization of the well. 15% Hydrochloric acid was pumped and flowed back following the job into a portable tank. No problems observed. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | BI JOE DEVELOPMENT INC | 1206.00 | 427.00 | 63 |
2015 | BI JOE DEVELOPMENT INC | 16395.00 | 3992.00 | 63 |
2016 | BI JOE DEVELOPMENT INC | 17261.00 | 5438.00 | 365 |
2017 | BI JOE DEVELOPMENT INC | 15442.00 | 4893.00 | 365 |
2018 | BI JOE DEVELOPMENT INC | 13183.00 | 3676.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | BI JOE DEVELOPMENT INC | Brine | 0 | 63 |
2015 | BI JOE DEVELOPMENT INC | Brine | 40 | 63 |
2016 | BI JOE DEVELOPMENT INC | Brine | 110 | 365 |
2017 | BI JOE DEVELOPMENT INC | Brine | 50 | 365 |
2018 | BI JOE DEVELOPMENT INC | Brine | 13183 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1415403103 | 2014-8-11 0:00: | DD | No Violations | 1.00 |
-1710431349 | 2019-8-15 0:00: | PW | No Violations | |
-583445878 | 2014-9-11 0:00: | PL | No Violations | 0.50 |
-650395147 | 2014-9-5 0:00:0 | PL | No Violations | 0.50 |
-798677695 | 2015-4-1 0:00:0 | PW | No Violations | 0.50 |
-884348164 | 2014-8-4 0:00:0 | DD | No Violations | 1.00 |
-974493801 | 2014-8-18 0:00: | PL | No Violations | 4.00 |
0583445878 | 2014-09-11 | Preliminary Restoration | No Violations | The tank battery has not been built yet. The well is being pumped into a portable tank at the well location. The disturbed area has been finish graded, seeded, and mulched and is stable. The preliminary restoration is approved. |
0650395147 | 2014-09-05 | Preliminary Restoration | No Violations | R&B Enterprises is grading the location. The tank battery has not been completed yet. Seeding equipment is on site. |
0798677695 | 2015-04-01 | Production Wells | No Violations | The well is equipped with a pump jack, rods and tubing and is in production. ID posted at the tanks. 2-200 Bbl tanks at the gate on Wagner Rd. There are 2 separators in the tank battery. Preliminary restoration is approved. The location is vegetated and stable. |
0884348164 | 2014-08-04 | Drill / Deepen / Reopen | No Violations | The location has been graded out and pits excavated for drilling. Maric Drilling is moving to the location. |
0974493801 | 2014-08-18 | Preliminary Restoration | No Violations | The operator is solidifying and closing pits. Water was hauled from the pits prior to solidifying cuttings. Trees and stumps from clearing the location for drilling are being buried near the pits. R&B Enterprises is doing the earth work. |
1407506821 | 2014-08-06 | Casing String Witnessed | No Violations | The operator requested inspection to witness surface casing cement. See the casing ticket for details. |
1407786747 | 2014-08-08 | Drill / Deepen / Reopen | No Violations | Maric Drilling is at 1800 ft on fluid. |
1408113151 | 2014-08-13 | Drill / Deepen / Reopen | No Violations | Maric Drilling is on fluid at 3900ft. |
1409663926 | 2014-08-27 | Drill / Deepen / Reopen | No Violations | The operator requested an inspection to witness acidization of the well. See the stimulation report for details. |
1415403103 | 2014-08-11 | Drill / Deepen / Reopen | No Violations | Maric Drilling is at 3100 ft on fluid. |
1456558232 | 2014-08-25 | Preliminary Restoration | No Violations | Met the operator on location. There is a service rig from Bakerwell on location also. The well is going to be perforated on 8/26 and acidized on 8/27. |
1493142576 | 2017-04-25 | Production Wells | No Violations | The well is equipped with a pump jack, rods and tubing and is in production. There is a production unit on the flow line. There are 2-200 barrel tanks and separators in the tank battery. ID is posted at the tanks. There is a tag on the wellhead indicating that the well was treated with solvents by Appalachian Solvents of Cambridge, OH. |
For data sources see[9]