If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-139-20768 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.57,"lon":-82.47,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Richland | |
Municipality: Jefferson Township | |
Operator Name: BI JOE DEVELOPMENT INC | |
Well Pad ID: | |
Farm/Lease Name: WADE UNIT | |
License Status: Producing | |
License Date: 2016-04-15 | |
Spud Date: 2016-08-15 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2016-08-22 | |
Well Total Depth: 4588.00 ft | |
Configuration: Vertical | |
Latitude: 40.570000 | |
Longitude: -82.470000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-04-15 | Proposed Formations:TRENTON THRU TREMPEALEAU, Issued Date:4/15/2016, Expired Date:4/15/2018 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2016-08-22 | |
Completion Report Received | 2016-12-07 | |
Record Last Modified | 2017-10-23 | |
Construction Permit Expires | 2018-04-15 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-09-12 | ACID | 0 | 5250 Gal | 0 | Producers Service Corporation | The job was partially witnessed due to plugging at permit 20368. 3150 gallons of 15% hydrochloric acid were pumped with the job. The well was circulated and flowed back to a steel tank. No proppant sand was used. No problems observed. |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | BI JOE DEVELOPMENT INC | 1253.00 | 2239.00 | 99 |
2017 | BI JOE DEVELOPMENT INC | 6236.00 | 5210.00 | 99 |
2018 | BI JOE DEVELOPMENT INC | 4341.00 | 3829.00 | 99 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | BI JOE DEVELOPMENT INC | Brine | 40 | 99 |
2017 | BI JOE DEVELOPMENT INC | Brine | 240 | 99 |
2018 | BI JOE DEVELOPMENT INC | Brine | 145 | 99 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1372713586 | 2016-9-6 0:00:0 | DD | No Violations | 1.00 |
-1581333660 | 2016-7-25 0:00: | DD | No Violations | 0.50 |
-243665275 | 2016-8-30 0:00: | DD | No Violations | 4.00 |
-527229158 | 2016-8-23 0:00: | CS | No Violations | 4.00 |
-540826222 | 2016-8-17 0:00: | CS | No Violations | 5.00 |
-810778943 | 2016-9-26 0:00: | PL | No Violations | 1.00 |
-862112920 | 2018-3-1 0:00:0 | PW | No Violations | |
-898432387 | 2016-9-12 0:00: | DD | No Violations | 1.00 |
-951425897 | 2016-8-24 0:00: | DD | No Violations | 2.00 |
0203306043 | 2016-08-31 | Drill / Deepen / Reopen | No Violations | The large drilling pit is completely closed. The smaller pit is halfway closed. The operator is planning to leave part of the pit open to complete the well. |
0243665275 | 2016-08-30 | Drill / Deepen / Reopen | No Violations | The pits were dewatered and solidified. The tank battery is being set and a service rig is on the well. Backfilling of the pits and grading of the location started. |
0527229158 | 2016-08-23 | Casing String Witnessed | No Violations | The operator requested inspection to witness cementing of the production casing in the well. See the casing ticket for details. |
0540826222 | 2016-08-17 | Casing String Witnessed | No Violations | The operator requested inspection to witness surface casing cement. The Berea formation produced enough gas pressure to overcome the hydrostatic pressure of drilling fluid and was pushing it out of the 8.625 inch casing and bubbling up the wellbore. Heavy mud was mixed to kill the Berea formation. Gas had to be circulated from the wellbore prior to cementing. The Berea top is at 738 feet. See the casing ticket for details. |
0665314735 | 2016-08-15 | Drill / Deepen / Reopen | No Violations | The rig is drilling the surface hole on fluid at 217 feet. |
0739098605 | 2016-08-17 | Drill / Deepen / Reopen | No Violations | The rig completed testing of the blow-out preventer. The BOP passed testing. The rig resumed drilling at 3:00 PM. Cement was tagged 10 feet inside the surface casing. No bubbles were observed on the backside of the 8.625 inch casing. |
0810778943 | 2016-09-26 | Preliminary Restoration | No Violations | The location is finish graded, seeded and mulched. The well is equipped with a pump jack and is in production. The preliminary restoration is approved. |
0862112920 | 2018-03-01 | Production Wells | No Violations | The well is equipped with a pump jack, rods and tubing and is in production. There are 2-200 barrel tanks and a separator in the tank battery. There is a production unit in line between the well and tank battery. ID is posted at the tanks. |
0898432387 | 2016-09-12 | Drill / Deepen / Reopen | No Violations | The operator acidized the well today. The end of the job was witnessed due to plugging at permit 20368 in Richland county. |
0951425897 | 2016-08-24 | Drill / Deepen / Reopen | No Violations | Poulson Drilling is rigging down and moving off location. There is a wellhead on the surface casing and a bullplug in the production casing. Gas was being vented from the surface-production annulus. Joe Cross shut the valve in. The gas source is suspected to be the Oriskany. |
1372713586 | 2016-09-06 | Drill / Deepen / Reopen | No Violations | The operator is on site restoring the location. The small pit has been closed. The operator has elected to use a half tank for well completion fluid containment. |
1540610257 | 2016-08-10 | Drill / Deepen / Reopen | No Violations | The location is built and the pits have been excavated. They are not lined yet. There is no drilling equipment on location. There is excavating machinery on site. The well location is staked. The stake location matches the database coordinates. |
1581333660 | 2016-07-25 | Drill / Deepen / Reopen | No Violations | The surface location of the well is staked. No personnel on site. |
1727530130 | 2016-08-26 | Drill / Deepen / Reopen | No Violations | No personnel were on location at the time of inspection. R&B Enterprises excavator is on location. The pits are not being closed at this time. Joe Cross of BiJoe was contacted and he stated they couldnt get material to solidify pits today. The job was postponed until next week. |
1826492254 | 2016-07-27 | Drill / Deepen / Reopen | No Violations | R&B Enterprises is on location with a bulldozer grading the site for the drill rig. Topsoil is stockpiled. Trees are removed. |
1827800366 | 2019-05-29 | Production Wells | No Violations | Identification is posted and no observed violations at the time of this inspection. |
1874536960 | 2016-08-22 | Drill / Deepen / Reopen | No Violations | Poulson Drilling is drilling on fluid at 4460 feet. They believe they are in the Trempealeau formation but they are waiting to examine cuttings to confirm that. The operator has 3 water trucks on site loaded with salt water to provide extra fluid for well control purposes. The Clinton, Black River, Trenton and Trempealeau all are showing gas. |
1906500610 | 2016-08-03 | Surface Facility Construction | No Violations | The location has been build and prepared for the rig. The pits have not yet been dug. No personnel were on site. Topsoil is stockpiled at the northwest corner of the pad. |
203306043 | 2016-8-31 0:00: | DD | No Violations | 2.00 |
665314735 | 2016-8-15 0:00: | DD | No Violations | 2.00 |
739098605 | 2016-8-17 0:00: | DD | No Violations | 3.00 |
For data sources see[8]