Well ID: 34-139-20770 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.59,"lon":-82.47,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Richland | |
Municipality: Jefferson Township | |
Operator Name: BI JOE DEVELOPMENT INC | |
Well Pad ID: | |
Farm/Lease Name: WHARTON | |
License Status: Producing | |
License Date: 2017-07-27 | |
Spud Date: 2018-07-18 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2018-08-02 | |
Well Total Depth: 4450.00 ft | |
Configuration: Vertical | |
Latitude: 40.590000 | |
Longitude: -82.470000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-07-27 | Proposed Formations:TRENTON THROUGH TREMPEALEAU, Issued Date:7/27/2017, Expired Date:7/27/2019 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-08-02 | |
Completion Report Received | 2018-12-03 | |
Record Last Modified | 2018-12-11 | |
Construction Permit Expires | 2019-07-27 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-08-08 | ACID | 15 | 5849 Gal | 0 | Producers Service Corporation |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | BI JOE DEVELOPMENT INC | 1411.00 | 1725.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | BI JOE DEVELOPMENT INC | Brine | 60 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1652803603 | 2019-9-12 0:00: | PL | No Violations | |
-383042133 | 2018-7-19 0:00: | CS | No Violations | |
-936009884 | 2018-8-20 0:00: | DD | No Violations | |
0383042133 | 2018-07-19 | Casing String Witnessed | No Violations | The operator contacted the inspector and stated they had to set a conductor casing in the well due to problems with borehole stability and lost circulation. The hole was drilled on fresh water. Conductor casing was added to the permit. Approximately 87 feet of conductor was installed. Hole was originally drilled with a 14 inch bit. Casing was unable to be installed and the hole was reamed to 17 inches. Casing was installed in the hole and cemented by Petroset. Casing had to be driven in due to hanging up in the hole. The well did not circulate and no cement returned. Cement was topped up by the operator 8 hours after pumping using dry bagged cement. |
0598790093 | 2018-07-25 | Drill / Deepen / Reopen | No Violations | Kilbarger Drilling is drilling on salt water at 3300 feet. They drilled with air below conductor and surface casings. Drilling switched back to fluid in the lime due to formation water. The operator conducted a bond log on the surface casing which showed top of cement at 114 feet. The cement was topped up with 9 sack grout. |
0781715286 | 2018-07-30 | Drill / Deepen / Reopen | No Violations | The production casing was installed and cemented on Saturday, 7/28/18. A formation packer was used on the casing. Kilbarger is going to remain on location to drill out the packer and complete the well. |
0936009884 | 2018-08-20 | Drill / Deepen / Reopen | No Violations | BiJoe personnel are on location building the tank battery. 2-200 barrel tanks have been set at the tank battery location. The Kilbarger rig is still on location. The rig move is scheduled for 8/21. |
1265965133 | 2018-08-01 | Drill / Deepen / Reopen | No Violations | The rig is preparing to drill out the formation packer on the production casing and complete the well. |
1531938204 | 2018-07-18 | Drill / Deepen / Reopen | No Violations | Kilbarger Drilling is rigged up on the well. Fresh water is being hauled to the location. Freshwater was tested for chlorides and was found to be below measureable amount on a Quantab test strip. A second pit for cuttings is being excavated on location. Drilling started during inspection. |
1535388767 | 2018-08-27 | Drill / Deepen / Reopen | No Violations | R&B Enterprises is on location closing pits. The pits have been dewatered. The operator did not solidify cuttings. Brush from the location is being buried in the pits. The well is equipped with a pump jack, rods and tubing and is being produced to a portable tank at the well. BiJoe has installed 2-200 barrel tanks. Tanks, production equipment and flowline need to be connnected to the well. |
1565893106 | 2019-8-15 0:00: | PW | No Violations | |
1567529795 | 2019-8-16 0:00: | PW | No Violations | |
1694161042 | 2018-07-20 | Casing String Witnessed | No Violations | The operator requested inspection to witness cementing surface casing in the well. The well did not circulate and no cement returned. A bond log was conducted on Saturday, 7/21, and the cement top was found at 114 feet. Cement was topped up with 9 sack grout at that time. Grout remained at surface. |
2018116361 | 2018-08-13 | Drill / Deepen / Reopen | No Violations | Kilbarger Rig 5 is still on location. The rig has been rigged down. No personnel on location during inspection. The pits have been pumped down. A pump jack has been installed on the well and the well is being produced to a portable tank on location. |
598790093 | 2018-7-25 0:00: | DD | No Violations | |
781715286 | 2018-7-30 0:00: | DD | No Violations |