X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-139-20770

Well Details

Well ID: 34-139-20770
Loading map...
Country: United States
State: Ohio
County: Richland
Municipality: Jefferson Township
Operator Name: BI JOE DEVELOPMENT INC
Well Pad ID:
Farm/Lease Name: WHARTON
License Status: Producing
License Date: 2017-07-27
Spud Date: 2018-07-18
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2018-08-02
Well Total Depth: 4450.00 ft
Configuration: Vertical
Latitude: 40.590000
Longitude: -82.470000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-07-27 Proposed Formations:TRENTON THROUGH TREMPEALEAU, Issued Date:7/27/2017, Expired Date:7/27/2019 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-08-02
Completion Report Received 2018-12-03
Record Last Modified 2018-12-11
Construction Permit Expires 2019-07-27

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-08-08 ACID 15 5849 Gal 0 Producers Service Corporation

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 BI JOE DEVELOPMENT INC 1411.00 1725.00 365

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 BI JOE DEVELOPMENT INC Brine 60 365

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1652803603 2019-9-12 0:00: PL No Violations
-383042133 2018-7-19 0:00: CS No Violations
-936009884 2018-8-20 0:00: DD No Violations
0383042133 2018-07-19 Casing String Witnessed No Violations The operator contacted the inspector and stated they had to set a conductor casing in the well due to problems with borehole stability and lost circulation. The hole was drilled on fresh water. Conductor casing was added to the permit. Approximately 87 feet of conductor was installed. Hole was originally drilled with a 14 inch bit. Casing was unable to be installed and the hole was reamed to 17 inches. Casing was installed in the hole and cemented by Petroset. Casing had to be driven in due to hanging up in the hole. The well did not circulate and no cement returned. Cement was topped up by the operator 8 hours after pumping using dry bagged cement.
0598790093 2018-07-25 Drill / Deepen / Reopen No Violations Kilbarger Drilling is drilling on salt water at 3300 feet. They drilled with air below conductor and surface casings. Drilling switched back to fluid in the lime due to formation water. The operator conducted a bond log on the surface casing which showed top of cement at 114 feet. The cement was topped up with 9 sack grout.
0781715286 2018-07-30 Drill / Deepen / Reopen No Violations The production casing was installed and cemented on Saturday, 7/28/18. A formation packer was used on the casing. Kilbarger is going to remain on location to drill out the packer and complete the well.
0936009884 2018-08-20 Drill / Deepen / Reopen No Violations BiJoe personnel are on location building the tank battery. 2-200 barrel tanks have been set at the tank battery location. The Kilbarger rig is still on location. The rig move is scheduled for 8/21.
1265965133 2018-08-01 Drill / Deepen / Reopen No Violations The rig is preparing to drill out the formation packer on the production casing and complete the well.
1531938204 2018-07-18 Drill / Deepen / Reopen No Violations Kilbarger Drilling is rigged up on the well. Fresh water is being hauled to the location. Freshwater was tested for chlorides and was found to be below measureable amount on a Quantab test strip. A second pit for cuttings is being excavated on location. Drilling started during inspection.
1535388767 2018-08-27 Drill / Deepen / Reopen No Violations R&B Enterprises is on location closing pits. The pits have been dewatered. The operator did not solidify cuttings. Brush from the location is being buried in the pits. The well is equipped with a pump jack, rods and tubing and is being produced to a portable tank at the well. BiJoe has installed 2-200 barrel tanks. Tanks, production equipment and flowline need to be connnected to the well.
1565893106 2019-8-15 0:00: PW No Violations
1567529795 2019-8-16 0:00: PW No Violations
1694161042 2018-07-20 Casing String Witnessed No Violations The operator requested inspection to witness cementing surface casing in the well. The well did not circulate and no cement returned. A bond log was conducted on Saturday, 7/21, and the cement top was found at 114 feet. Cement was topped up with 9 sack grout at that time. Grout remained at surface.
2018116361 2018-08-13 Drill / Deepen / Reopen No Violations Kilbarger Rig 5 is still on location. The rig has been rigged down. No personnel on location during inspection. The pits have been pumped down. A pump jack has been installed on the well and the well is being produced to a portable tank on location.
598790093 2018-7-25 0:00: DD No Violations
781715286 2018-7-30 0:00: DD No Violations

For data sources see[8]

References