34-139-20771

Well Details

Well ID: 34-139-20771
Loading map...
Country: United States
State: Ohio
County: Richland
Municipality: Worthington Township
Operator Name: COLUMBIA GAS TRANSMISSION LLC
Well Pad ID:
Farm/Lease Name: R D MILLER
License Status: Storage Well
License Date: 2018-07-06
Spud Date: 2018-08-16
Spud Drilling Contractor: H A D INC
Final Drill Date: 2018-09-25
Well Total Depth: 6994.00 ft
Configuration: Horizontal
Latitude: 40.620000
Longitude: -82.360000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Completion Report Received 2018-01-30
APP 2018-07-06 Proposed Formations:CLINTON SANDSTONE, Issued Date:7/6/2018, Expired Date:7/5/2020 12:00:00 PM, Drilling unit acres:51, Proposed Well Type:GS, Proposed Well Class:POOL
Reached Total Depth 2018-09-25
Record Last Modified 2019-03-08
Construction Permit Expires 2020-07-05

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
Other Treatment Type 0 0 0 COIL TUBING/ACID JOB

SEE IMAGES

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1380080442 2018-9-20 0:00: DD No Violations
-490447486 2018-9-5 0:00:0 DD No Violations
0062482233 2018-09-06 Drill / Deepen / Reopen No Violations The operator requested inspection to witness surface casing cement. The job was scheduled for 6 PM. On arrival, the job was pushed back to 11 PM. On return to the job, 5 of 14 joints of casing had been installed in the well. The rig crew was having difficulty threading casing in and discarded 4 joints for thread problems. A truck was sent to Wooster to get additional pipe for the job. The cement was not witnessed due to delays caused by casing.
0490447486 2018-09-05 Drill / Deepen / Reopen No Violations HAD rig 249 is drilling on fresh water at 250 feet. They encountered a lost circulation zone and are waiting for lost circulation materials to be delivered to the rig location. 14 joints of 13.375 inch casing are on location.
1380080442 2018-09-20 Drill / Deepen / Reopen No Violations The operator is drilling at 5500 feet measured depth, 2800 feet of lateral. The rig is just finishing up a log of the well bore and preparing to return to drilling.
1389962932 2018-08-27 Drill / Deepen / Reopen No Violations HAD has moved out drilling equipment from the dual rotary rig. The primary drilling rig has not moved to the location yet.
1406154714 2020-3-6 0:00:0 SO No Violations
143750403 2019-6-19 0:00: SO No Violations
1536865847 2018-09-13 Casing String Witnessed No Violations The operator requested inspection to witness intermediate casing cement. Petroset cemented the casing in the well.
1541096303 2018-11-01 Drill / Deepen / Reopen No Violations The well has been connected to the pipeline. Workhorse Excavating is on location removing rig mats from the drill pad.
1562190339 2018-08-23 Drill / Deepen / Reopen No Violations 20 inch conductor casing has been installed in the well. HAD Drilling set conductor with a dual rotary rig.
1854091522 2020-1-8 0:00:0 PL No Violations 0.60
2084261455 2018-09-11 Drill / Deepen / Reopen No Violations HAD Drilling is drilling hole to install intermediate casing on saltwater mud. The bit is at 2450 feet with approximately 200 feet to drill to set casing through the base of the Big Lime formation.
62482233 2018-9-6 0:00:0 DD No Violations

For data sources see[4]