If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-139-20771 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.62,"lon":-82.36,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Richland | |
Municipality: Worthington Township | |
Operator Name: COLUMBIA GAS TRANSMISSION LLC | |
Well Pad ID: | |
Farm/Lease Name: R D MILLER | |
License Status: Storage Well | |
License Date: 2018-07-06 | |
Spud Date: 2018-08-16 | |
Spud Drilling Contractor: H A D INC | |
Final Drill Date: 2018-09-25 | |
Well Total Depth: 6994.00 ft | |
Configuration: Horizontal | |
Latitude: 40.620000 | |
Longitude: -82.360000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Completion Report Received | 2018-01-30 | |
APP | 2018-07-06 | Proposed Formations:CLINTON SANDSTONE, Issued Date:7/6/2018, Expired Date:7/5/2020 12:00:00 PM, Drilling unit acres:51, Proposed Well Type:GS, Proposed Well Class:POOL |
Reached Total Depth | 2018-09-25 | |
Record Last Modified | 2019-03-08 | |
Construction Permit Expires | 2020-07-05 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
Other Treatment Type | 0 | 0 | 0 | COIL TUBING/ACID JOB
SEE IMAGES |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1380080442 | 2018-9-20 0:00: | DD | No Violations | |
-490447486 | 2018-9-5 0:00:0 | DD | No Violations | |
0062482233 | 2018-09-06 | Drill / Deepen / Reopen | No Violations | The operator requested inspection to witness surface casing cement. The job was scheduled for 6 PM. On arrival, the job was pushed back to 11 PM. On return to the job, 5 of 14 joints of casing had been installed in the well. The rig crew was having difficulty threading casing in and discarded 4 joints for thread problems. A truck was sent to Wooster to get additional pipe for the job. The cement was not witnessed due to delays caused by casing. |
0490447486 | 2018-09-05 | Drill / Deepen / Reopen | No Violations | HAD rig 249 is drilling on fresh water at 250 feet. They encountered a lost circulation zone and are waiting for lost circulation materials to be delivered to the rig location. 14 joints of 13.375 inch casing are on location. |
1380080442 | 2018-09-20 | Drill / Deepen / Reopen | No Violations | The operator is drilling at 5500 feet measured depth, 2800 feet of lateral. The rig is just finishing up a log of the well bore and preparing to return to drilling. |
1389962932 | 2018-08-27 | Drill / Deepen / Reopen | No Violations | HAD has moved out drilling equipment from the dual rotary rig. The primary drilling rig has not moved to the location yet. |
1406154714 | 2020-3-6 0:00:0 | SO | No Violations | |
143750403 | 2019-6-19 0:00: | SO | No Violations | |
1536865847 | 2018-09-13 | Casing String Witnessed | No Violations | The operator requested inspection to witness intermediate casing cement. Petroset cemented the casing in the well. |
1541096303 | 2018-11-01 | Drill / Deepen / Reopen | No Violations | The well has been connected to the pipeline. Workhorse Excavating is on location removing rig mats from the drill pad. |
1562190339 | 2018-08-23 | Drill / Deepen / Reopen | No Violations | 20 inch conductor casing has been installed in the well. HAD Drilling set conductor with a dual rotary rig. |
1854091522 | 2020-1-8 0:00:0 | PL | No Violations | 0.60 |
2084261455 | 2018-09-11 | Drill / Deepen / Reopen | No Violations | HAD Drilling is drilling hole to install intermediate casing on saltwater mud. The bit is at 2450 feet with approximately 200 feet to drill to set casing through the base of the Big Lime formation. |
62482233 | 2018-9-6 0:00:0 | DD | No Violations |
For data sources see[4]