If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-143-20321 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.41,"lon":-83.09,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Sandusky | |
Municipality: Rice Township | |
Operator Name: FO ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: C A WEICKERT | |
License Status: Producing | |
License Date: 2013-04-10 | |
Spud Date: 2012-07-13 | |
Spud Drilling Contractor: ADVENT DRLG | |
Final Drill Date: 2012-07-26 | |
Well Total Depth: 4113.00 ft | |
Configuration: Horizontal | |
Latitude: 41.410000 | |
Longitude: -83.090000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-11-15 | Proposed Formations:TRENTON, Issued Date:11/15/2011, Expired Date:11/14/2013 12:00:00 PM, Drilling unit acres:47.39, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2012-07-26 | |
Completion Report Received | 2012-10-29 | |
Correction to Well | 2013-04-05 | CORRECTION TO TARGET INFORMATION: FOOTAGE AND X, Y COORDINATES FROM AS DRILLED SURVEY PLAT. UNIT SIZE INCREASED TO 61.35 ACRES. |
APP | 2013-04-10 | Proposed Formations:TRENTON, Issued Date:4/10/2013, Expired Date:4/10/2015 12:00:00 PM, Drilling unit acres:47.39, Proposed Well Type:OG, Proposed Well Class:POOL |
End of Confidential Data | 2013-07-26 | |
Construction Permit Expires | 2015-04-10 | |
Change of Owner | 2015-11-03 | Operator changed from 7626, M & M ROYALTY LTD to 9312, FO ENERGY LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | M & M ROYALTY LTD | 0.00 | 374.00 | 366 |
2013 | M & M ROYALTY LTD | 0.00 | 1454.00 | 365 |
2014 | M & M ROYALTY LTD | 0.00 | 1964.00 | 365 |
2015 | M & M ROYALTY LTD | 0.00 | 220.00 | 120 |
2016 | FO ENERGY LLC | 53.00 | 325.00 | 75 |
2017 | FO ENERGY LLC | 6.00 | 2341.00 | 365 |
2018 | FO ENERGY LLC | 3.00 | 828.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | M & M ROYALTY LTD | Brine | 0 | 366 |
2013 | M & M ROYALTY LTD | Brine | 0 | 365 |
2014 | M & M ROYALTY LTD | Brine | 0 | 365 |
2015 | FO ENERGY LLC | Brine | 0 | 0 |
2016 | FO ENERGY LLC | Brine | 12 | 75 |
2017 | FO ENERGY LLC | Brine | 0 | 365 |
2018 | FO ENERGY LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1002282973 | 2013-9-4 0:00:0 | PW | No Violations | |
-1094825190 | 2012-7-24 0:00: | DD | No Violations | |
-1096132155 | 2012-9-12 0:00: | PW | No Violations | |
-1155237012 | 2013-11-5 0:00: | PW | No Violations | |
-1974417238 | 2012-7-13 0:00: | DD | No Violations | |
-2100186151 | 2015-3-9 0:00:0 | PW | No Violations | |
-283787529 | 2013-10-23 0:00 | AM | No Violations | |
-297916927 | 2013-9-30 0:00: | PW | No Violations | |
-322238216 | 2012-7-18 0:00: | DD | No Violations | |
-578304074 | 2017-3-27 0:00: | PW | No Violations | |
-772049583 | 2012-8-2 0:00:0 | DD | No Violations | |
0200175460 | 2013-07-22 | Drill / Deepen / Reopen | No Violations | Inspect location. Drill rig is being moved onto location to drill and extend well bore. |
0283787529 | 2013-10-23 | Administrative Inspection | No Violations | Operator submitted analytical results for soil that was stockpiled and bio-remediated. The operator requested approval for spreading the bio-remediated soils and approval was granted by Bob Warstal. |
0297916927 | 2013-09-30 | Production Wells | No Violations | Inspect well, location, and road ditch. The oil and sheen in the road ditch has been successfully removed from the water. The operator was advised that cleanup activities in road ditch are completed. The soil impacted in on a plastic liner and is covered with a plastic liner for bio-remediation. The pile is about 32 feet by 18 feet and 4 feet high. The division has requested the operator test the bio- remediated soils be tested for Total Petroleum Hydrocarbon (TPH) and Benzene, Toluene, Ethyl benzene, and Xylen (BTEX) prior to spreading on the farm field. |
0322238216 | 2012-07-18 | Drill / Deepen / Reopen | No Violations | At the time of my inspection the drilling crew was making preperations to continue drilling. Surface casing was cemented on 7/14/12 at 544. |
0560685219 | 2013-08-14 | Production Wells | No Violations | Inspected well, location, and road ditch. Inspected the cleanup activities in road ditch caused by uncontrolled release of oil from well head. Contacted operator to report that the oil absorbent booms were oil soaked, he stated the booms had been replaced the previous week. Will continue to monitor until all oil and sheen had been removed. |
0578304074 | 2017-03-27 | Production Wells | No Violations | Identification is posted and no observed violations at the present time. |
0610390281 | 2015-06-11 | Production Wells | No Violations | Well is currently not being produced because of delays in the installation of a gathering line for the production of natural gas. Well should be in production soon. Identification is posted. Drilling equipment has been removed and drilling pits filled. Pump jack with natural gas motor is installed on wellhead. |
0693761074 | 2013-07-24 | Production Wells | No Violations | As a result of the oil spill in the road ditch, The operator has hired a local landscape company to trim the grasses in the road ditch along County Road 174 to remove the oil coated grasses. |
0772049583 | 2012-08-02 | Drill / Deepen / Reopen | No Violations | At the time of my inspection a service crew was setting up on the well and site cleanup was in progress. |
0905800853 | 2013-07-23 | Production Wells | No Violations | Oil was observed in road ditch to the north of the location along County Road 174 and North of County Road 119. The oil has coated the grasses for about 1100 feet. This is a result of the blowout on 7/17/13 and local heavy rains of upwards of 7 inches after the oil spill release. Boom have been placed at locations every 250 feet to collect the oil. The drill rig is tripping in the hole to extend the measured depth of the borehole. |
1002282973 | 2013-09-04 | Production Wells | No Violations | Inspect well, location, and road ditch. Residual oil continues to be present in the road ditch. Contacted operator recommended changing the oil absorbent booms. |
1023148515 | 2012-07-14 | Drill / Deepen / Reopen | No Violations | On site for the setting and cementing of the surface casing. 544 of 9 5/8 casing set in a 12 1/4 hole and cemented to surface with 105 sacks of Lite cement and 126 sacks of Class A with 3% calcium by Universal Well Service. Cement returns observed at the surface. See Casing Report for details. |
1094825190 | 2012-07-24 | Drill / Deepen / Reopen | No Violations | At the time of my inspection drilling was proceeding at a Measured Depth of 2983 and a Total Vertical Depth of 1407 in the Trenton Formation. Gas is being flared during pipe changeovers. |
1096132155 | 2012-09-12 | Production Wells | No Violations | At the time of my inspection the well has a pumping unit on it and a temporary tank battery in place. There was no activity on the site. |
1096808422 | 2012-07-21 | Drill / Deepen / Reopen | No Violations | At the time of my inspection the Measured Depth was at 1717 and the Total Vertical Depth was at 1407. I was on site for the setting and cementing of the 7 Intermediate Casing. See Casing Report for details. |
1155237012 | 2013-11-05 | Production Wells | No Violations | Inspect location the bio-remediated soil has been spread on the location and looks good. Well is in production. |
1342313965 | 2012-07-13 | Drill / Deepen / Reopen | No Violations | At the time of my inspection drilling had stopped at 65 and mud was being mixed to continue drilling through a layer of sand. |
1342865466 | 2012-07-17 | Drill / Deepen / Reopen | No Violations | At the time of my inspection a Cement Bond Log was being done by Appalachian Wire Line Services on the 9 5/8 Surface Casing that was cemented on 7/14/12. The bond log showed the top of the cement at 30 from the surface. |
1343232029 | 2012-07-21 | Drill / Deepen / Reopen | No Violations | At the time of my inspection the Intermediate 7 casing was set and cemented to a Measured Depth of 1736 and a Total Vertical Depth of 1407. Cement returns were observed at the surface. |
1346071696 | 2012-07-26 | Drill / Deepen / Reopen | No Violations | At the time of my inspection drilling had concluded at a Total Vertical Depth (TVD) of 1410 and a Measured Depth (MD) of 3467. Rig teardown and site cleanup commencing. |
1361284328 | 2013-02-19 | Production Wells | No Violations | At the time of my inspection the well was in production with the identification posted at the newly constructed tank battery. Wet weather has prevented the completion of the Preliminary Restoration of the well. The area around the well needs graded and the two inch plastic production line needs buried. Once these steps are completed the Preliminary Restoration will be passed. |
1375621881 | 2013-07-18 | Production Wells | No Violations | M&M Royalty was drilling the lateral on air on July 17, 2013 at the Weickert 4-H (34143203220000) though the Trenton limestone in Sandusky County, Rice Township north of Freemont, Ohio. The measured depth was about 2650 feet. At approximately 9:30 pm the neighbors began to notice a petroleum odor near the C A Weickert 3-H (34143203210000). At approximately 10:00 pm the rig crew began to notice a petroleum odor and was checking the pits. The crew then observed a blowout at the Weichkert 3-H location. The M&M Royalty personnel, Mike Weinsz and Mat Egnotvich and several rig hands immediately arrived at the 3-H location to assess the situation and shut in the well. Emergency responders were contacted by others and were on site within 5 minutes of M&M Royalty. The responders included the local volunteer fire department, Emergency management, Sandusky County Sheriff, and the local Hazmat team. Mat (last name unknown) with the local fire department announced that he was in control and would notify OEPA and DNR. Inspector Benko received a phone message at 10:18 pm from the ODNR Communication center. Inspector Benko Contacted the Com Center at 1:56 AM and was told to disregard. Dave Schilt of the Ohio EPA contacted Inspector Benko at 7:00 am on July 18, 2013. M&M Royalty was then contacted and details were ascertained. In preparation to extend the lateral of the 3-H the pump jack was moved off the well and the rods and tubing were pulled out of the well. One joint of tubing was left in the well head and the valve for the 4.5 inch tubing remained open and the production line was not reconnected. A theory presented is there was communication between the drill rig and the existing 3-H lateral and caused the well to pressure up and blow out. The other theory is the well pressured up and blew out because it was shut in. Reportedly, there is not enough gas on the well to run the pump jack. Remediation included blowing the well down and flowing the oil into the production |
1427164012 | 2012-07-19 | Drill / Deepen / Reopen | No Violations | Inspect drill site. Current depth at 698 feet. Surface casing set. Driller trip in hole with directional bit. |
1782906584 | 2012-08-14 | Drill / Deepen / Reopen | No Violations | At the time of my inspection all drilling equipment has been removed and all pits have been closed with topsoil mounded on top. Area was muddy due to recent rains and no activity on site. |
1874813849 | 2012-07-20 | Drill / Deepen / Reopen | No Violations | At the time of my inspection the Measured Depth was at 1430 and the Total Vertical Depth was at 1305. |
1974417238 | 2012-07-13 | Drill / Deepen / Reopen | No Violations | On site for the setting and cementing of the conductor casing. 103 of 13 3/8 casing set in a 17.5 hole and cemented to surface with 165 sacks of Class A with 3% calcium by Universal Well Service. Good cement returns observed at the surface. See Casing Report for details. |
200175460 | 2013-7-22 0:00: | DD | No Violations | |
2100186151 | 2015-03-09 | Production Wells | No Violations | At the time of the inspection the crew has removed most of the standing oil and are setting up booms and pads to collect any remaining oil. A vacuum truck with operator is going to remain on location overnight and will continue to monitor the area for the next month or two until the field tile is clean. A new production line is being laid using a boring machine. The broken production line will be left in place at the request of the landowner. |
560685219 | 2013-8-14 0:00: | PW | No Violations | |
610390281 | 2015-6-11 0:00: | PW | No Violations | |
693761074 | 2013-7-24 0:00: | PW | No Violations | |
905800853 | 2013-7-23 0:00: | PW | No Violations |
For data sources see[7]