If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-151-22287 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.7,"lon":-81.33,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Stark | |
| Municipality: Pike Township | |
| Operator Name: GREEN GAS CO | |
| Well Pad ID: | |
| Farm/Lease Name: BAUM | |
| License Status: Final Restoration | |
| License Date: 2017-03-07 | |
| Spud Date: 1972-07-04 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 1972-09-04 | |
| Well Total Depth: 4986.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.700000 | |
| Longitude: -81.330000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1972-03-30 | 1383 OHIO L & M CO INC GeoDate 3/30/72 |
| Original Spud | 1972-07-04 | LANDOWNER WAIVER APPROVED TO LEAVE ACCESS ROAD AND FLOW LINE INTACT |
| Completed | 1972-09-04 | LANDOWNER WAIVER APPROVED TO LEAVE ACCESS ROAD AND FLOW LINE INTACT |
| Reached Total Depth | 1972-09-04 | LANDOWNER WAIVER APPROVED TO LEAVE ACCESS ROAD AND FLOW LINE INTACT |
| Change of Owner | 2006-07-14 | Operator changed from 1383, OHIO L & M CO INC to 6288, ALLIANCE PETROLEUM CORPORATION |
| Change of Owner | 2013-11-13 | Operator changed from 6288, ALLIANCE PETROLEUM CORPORATION to 201, GREEN GAS CO |
| APP | 2017-03-07 | Proposed Formations:CLINTON, Issued Date:3/7/2017, Expired Date:3/7/2019 12:00:00 PM, Drilling unit acres:81, Proposed Well Type:OG, Proposed Well Class: |
| Plugged/Abandoned | 2017-06-01 | LANDOWNER WAIVER APPROVED TO LEAVE ACCESS ROAD AND FLOW LINE INTACT |
| Record Last Modified | 2018-03-22 | LANDOWNER WAIVER APPROVED TO LEAVE ACCESS ROAD AND FLOW LINE INTACT |
| Construction Permit Expires | 2019-03-07 | LANDOWNER WAIVER APPROVED TO LEAVE ACCESS ROAD AND FLOW LINE INTACT |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2006-09-11 | 4813 | 4878 | 15 |
| 4813 | 4878 | 15 | |
| 4813 | 4878 | 15 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 2800 Bbl | 40000 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1984 | OHIO L & M CO INC | 2242.00 | 380.00 | 0 |
| 1985 | L & M PETROLEUM CO | 47.00 | 530.00 | 0 |
| 1986 | L & M PETROLEUM CO | 634.00 | 197.00 | 365 |
| 1987 | L & M PETROLEUM CO | 1999.00 | 0.00 | 365 |
| 1988 | OHIO L & M CO INC | 675.00 | 315.00 | 365 |
| 1989 | OHIO L & M CO INC | 613.00 | 162.00 | 365 |
| 1990 | OHIO L & M CO INC | 592.00 | 121.00 | 365 |
| 1991 | OHIO L & M CO INC | 204.00 | 319.00 | 365 |
| 1993 | OHIO L & M CO INC | 0.00 | 184.00 | 365 |
| 1994 | OHIO L & M CO INC | 0.00 | 252.00 | 365 |
| 1995 | OHIO L & M CO INC | 0.00 | 161.00 | 365 |
| 1996 | OHIO L & M CO INC | 0.00 | 66.00 | 365 |
| 1997 | OHIO L & M CO INC | 0.00 | 178.00 | 365 |
| 1998 | OHIO L & M CO INC | 0.00 | 113.00 | 365 |
| 2000 | OHIO L & M CO INC | 0.00 | 103.00 | 365 |
| 2001 | OHIO L & M CO INC | 0.00 | 191.00 | 365 |
| 2002 | OHIO L & M CO INC | 0.00 | 121.00 | 365 |
| 2003 | OHIO L & M CO INC | 0.00 | 97.00 | 365 |
| 2004 | OHIO L & M CO INC | 0.00 | 90.00 | 365 |
| 2006 | ALLIANCE PETROLEUM CORPORATION | 0.00 | 126.00 | 365 |
| 2008 | ALLIANCE PETROLEUM CORPORATION | 0.00 | 118.00 | 365 |
| 2010 | ALLIANCE PETROLEUM CORPORATION | 0.00 | 121.00 | 365 |
| 2011 | ALLIANCE PETROLEUM CORPORATION | 0.00 | 0.00 | 365 |
| 2012 | ALLIANCE PETROLEUM CORPORATION | 0.00 | 59.00 | 366 |
| 2013 | GREEN GAS CO | 0.00 | 0.00 | 0 |
| 2014 | GREEN GAS CO | 0.00 | 0.00 | 0 |
| 2016 | GREEN GAS CO | 0.00 | 57.00 | 365 |
| 2017 | GREEN GAS CO | 0.00 | 0.00 | 0 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1984 | OHIO L & M CO INC | Brine | 0 | 0 |
| 1985 | L & M PETROLEUM CO | Brine | 60 | 0 |
| 1986 | L & M PETROLEUM CO | Brine | 0 | 365 |
| 1987 | L & M PETROLEUM CO | Brine | 0 | 365 |
| 1988 | OHIO L & M CO INC | Brine | 0 | 365 |
| 1989 | OHIO L & M CO INC | Brine | 0 | 365 |
| 1990 | OHIO L & M CO INC | Brine | 0 | 365 |
| 1991 | OHIO L & M CO INC | Brine | 0 | 365 |
| 1993 | OHIO L & M CO INC | Brine | 0 | 365 |
| 1994 | OHIO L & M CO INC | Brine | 0 | 365 |
| 1995 | OHIO L & M CO INC | Brine | 0 | 365 |
| 1996 | OHIO L & M CO INC | Brine | 0 | 365 |
| 1997 | OHIO L & M CO INC | Brine | 0 | 365 |
| 1998 | OHIO L & M CO INC | Brine | 0 | 365 |
| 2000 | OHIO L & M CO INC | Brine | 0 | 365 |
| 2001 | OHIO L & M CO INC | Brine | 0 | 365 |
| 2002 | OHIO L & M CO INC | Brine | 0 | 365 |
| 2003 | OHIO L & M CO INC | Brine | 0 | 365 |
| 2004 | OHIO L & M CO INC | Brine | 0 | 365 |
| 2006 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
| 2008 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
| 2010 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
| 2011 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
| 2012 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 366 |
| 2013 | GREEN GAS CO | Brine | 0 | 0 |
| 2014 | GREEN GAS CO | Brine | 33 | 0 |
| 2016 | GREEN GAS CO | Brine | 0 | 365 |
| 2017 | GREEN GAS CO | Brine | 0 | 0 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1130508623 | 2017-5-31 0:00: | PB | No Violations | 9.00 |
| -2056751495 | 2017-5-31 0:00: | PB | No Violations | 9.00 |
| -248582324 | 2017-6-5 0:00:0 | PB | No Violations | 0.70 |
| -326954252 | 2017-5-30 0:00: | PW | No Violations | 0.70 |
| 0248582324 | 2017-06-05 | Plug / Plug Back | No Violations | I conducted a compliance notice follow-up inspection to verify that the well and pit locations have been filled in and graded to approximate original contour. Both locations are filled in and graded. That well was plugged on 06-01-2017. The Compliance Notice is passed. |
| 0326954252 | 2017-05-30 | Production Wells | No Violations | I conducted a compliance notice follow-up inspection. Knox Energy personnel are on location. The tubing has been pulled and I checked with Donnie Strange (Knox Energy/ Berry Well Service) he estimated the water level is at ~ 4503. Plugging is scheduled to start on 05/31/2017. |
| 1123879269 | 2017-07-20 | Final Restoration | No Violations | I conducted a Final Restoration inspection for this well. The well was plugged 06-01-2017. A landowner waiver was received on 07/11/17 by the Columbus office Oil & Gas waiving the reclamation of the lease road and the removal of the flowline from under the farm driveway was delivered to the Uniontown Oil & Gas office. The well site is graded, stabile and vegetation is establishing. The tank battery location is graded, vegetated and stabile. I spoke with Kevin Lee, I advised him I was passing the Final Restoration and he concurred. Final Restoration is passed. |
| 1130508623 | 2017-05-31 | Plug / Plug Back | No Violations | With John Fleming (MRI-3 Oil & Gas) - I am on location to witness the plugging of this well. Berry Well Service (Plugging Contractor), Petroset (Cement Contractor), and John Davis (Green Gas) are on location. The Bottom plug was bullheaded. While trying to rip the production casing the jars could not go beyond 3000 ft. and no telegraph could be established until it was above the Berea formation. Appalachian Well Service was called so a bond log could be done. The bond log showed the casing was stuck in the Berea formation. |
| 1326287174 | 2017-06-01 | Plug / Plug Back | No Violations | I was on location with Insoector Shawn Murphy to witness the plugging of the above well. Appalachian Well Service was on location and shot the pipe at 3272 with a 4.5 collar buster and Petroset Cementing establish circulation up the back side of the 4.5 casing. They pressured up to 1100 psi and shut down after a short period the pressure dropped and they were able to establish good circulation. BWS was able to pull pipe and Petroset Cementing plugged the well as plan. |
| 1343250819 | 2015-02-26 | Production Wells | No Violations | I was on location to perform an inspection on this production well. The lease road is a shared residential driveway. The tank battery and well are located in a pasture. The tank battery has proper I.D. signage and contains a 210bbl production tank, 50bbl brine tank, and vertical separator. The well is a swab well in good condition with a house gas connection. There are no violations at this time. |
| 1480621321 | 2016-12-01 | Production Wells | Violations Noted | I conducted a complaint follow-up inspection for complaint # 5234 on this well. The complainant wants the well plugged. The well is shut in and is equipped with a pumpjack unit with an electric motor which has been disconnected. Most of the electrical poles and powerline have been removed. There is one pole west of the tank battery with a utility box dangling off a disconnected power line. The diked tank battery consist of one 100 barrel tank and a vertical separator. The record shows the well last produced in 2013 and there is no annual production report submitted for 2015. This well presently is incapable of production. Consequently, this well shall be plugged in accordance with Ohio Revised Code section 1509.12(B). The well owner/operator shall submit a written plugging schedule to Shawn Murphy at 3575 Forest Lake Dr., Ste. 150, Uniontown, Ohio 44685 within 30 days, per OAC 1501:9-11-05(B), and plug the well within 180 days. The well owner/operator will be notified if the plugging schedule is approved or denied. |
| 1496148182 | 2016-05-30 | Production Wells | No Violations | I conducted a compliance notice inspection on this well. The well is shut-in and the pumpjack has been removed. A service rig for Knox Energy is on location and rigged-up. There are no personnel on location at this time. I contacted Donnie Strange (Knox Energy) (740-819-6530) and he advised me he was in route to the location to start pulling tubing. The plugging of the well is to commence on 05-31-2017. Cows are being pastured at the wells location. |
| 1496409968 | 2017-06-01 | Plug / Plug Back | No Violations | With John Fleming (MRI-3 Oil & Gas) - I am on location to witness the plugging if this well. Berry Well Service (Knox Energy) is the Plugging Contractor and Petroset is the cement contractor. Appalachian Well Service on location to set and shoot a collar buster at 3272 ft. in order to try a circulate the backside to free the production casing or to perf casing for squeeze jobs at the Big Lime and Berea. Circulation was established, the production casing was freed and four plugs were set with 4.5 casing. |
| 1671989976 | 2017-02-06 | Production Wells | No Violations | I conducted a compliance notice and a complaint follow-up inspection for complaint #5234 on this well. The well is shut in and not plugged. The well is equipped with a pumpjack with an electric motor. The flow line valves are closed and electrical line and poles been removed with the exception of one pole which is located west of the tank battery which an electrical box hanging from it. The diked tank battery consists of one 100 barrel tank and a vertical separator. An e-mail was received from John Davis on 12-30-2016 stating the well will be plugged by 05-31-2017. The complaint log has been up-dated. |
| 2056751495 | 2017-05-31 | Plug / Plug Back | No Violations | I was on location with Inspector Shawn Murphy to plug the above well. Berrys Well Service and Petroset Cementing was on location to perform the plugging. Petroset rigged up and bullheaded and displaced the plug. The well pressured up at 600 psi. shut in and waited for 1 hour. BWS could not pull stretch unable to locate a collar and could not get there ripping tools below 3000. Appalachian Well Service ran a bond log it showed various depths that had a lot of fill up around the pipe. The decision was made for AWS to be on location 6/1/2017 and shut the pipe at 3272. |
| Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
|---|---|---|---|---|
| 1480621321 | US-OH-113713 | 2017-07-24 | NONE | Well shall be plugged |
For data sources see[9]